Title: PIRATABrazil: Status and National Report


1
PIRATA-Brazil Status and National Report
  • Paulo Nobre
  • PIRATA-XII, 1-3 November 2006
  • Miami, USA

2
PIRATA Timeline

2005
1997 10W, Eq.
1996 Natal
2000 Paris
2003 S.J. Campos
1995 Fortaleza
2004
2006
  • PIRATA
  • Consolidation
  • Lab Natal

3
Summary of PIRATA Brazil Activities during 2006
  • 8S-30W SWE ATLAS buoy emergency recovery due to
    anchoring problems.
  • Engine failure of R/V ANTARES prior to the PIRATA
    BR-IX backbone and SWE-II scheduled maintenance
    cruise in July 2006.
  • Emergency servicing arranged by DHN, with special
    funding from MCT.
  • PIRATA BR-IX and PIRATA BR SWE-II are now
    underway. 3 ATLAS moored are being serviced.
  • PIRATA data collected, decoded, and made
    available by INPE during September 2005-August
    2006.
  • PIRATA Laboratory at INPE/Natal Mechanical
    workshop civil constructions completed.
  • ASPSP Tide Gauge acquired being integrated with
    INPEs automatic met station at CPTEC.

4
PIRATA BR-IX
  • Current PIRATA BR IX Mission dates are October
    23 to December 15.
  • CTD profiles at each degree of latitude along the
    38W meridian and along the PIRATA SWE array
    between 34W-19S and 30W-08S.
  • ANTARES shall amostrate ADCP currents twice along
    the 38W meridian line, as a way to enhance the
    accuracy of currents measurements sampled by
    ANTARES ADCP.
  • There shall be one radiosonde launch per day
    during the time at sea.

5
PIRATA BR-IX SWE-II
6
PIRATA Brazil Expenses (MCT)(Ship time
Salaries Excluded) K US
X 1000 US
7
MCT-INPE PIRATA Expenses 2006 (K US)
8
June 6, 2006 8S-30W PIRATA SWE ATLAS buoy
adrift!...
  • June 6th, 2006 the 8S, 30W PIRATA SWE ATLAS buoy
    starts to drift.
  • Exchange of e-mails among PMEL-INPE-DHN takes
    place
  • Emergency recovery mission is setup between INPE
    and DHN, with real-time buoy positioning info by
    PMEL.
  • June 28th, ATLAS buoy recovered by DHNs ship
    Amorim do Valle.
  • Buoy sensors electronic already shipped to
    PMEL.
  • Causa Mortis Nylon rope teared off.

9
PIRATA BACKBONE and the SW EXTENSION
(INMET-2004)
(LAMEPE-2002)
Background map Mean No. of SST
observations/month COADS 1961-90
10
Data collected from ATLAS buoys with INPEs SCD
equatorial orbit satellite
11
Acquisition, Decodification Storageof PIRATA
data at INPE
12
Journal articles (2005/2006)
  • Urbano, D. F., P. Nobre, E. Giarolla, R. de
    Almeida, L.S. P. Siqueira, and M. Malagutti
    (2006) The upper ocean circulation and water
    masses in the western tropical Atlantic OGCM and
    PIRATA data from 1998 to 2005. to be submitted to
    JGR.
  • Siqueira, L., and P. Nobre (2006), Tropical
    Atlantic sea surface temperature and heat flux
    simulations in a coupled GCM, Geophysical
    Research Letters, 33, L15708, doi10.1029/2006GL02
    6528.
  • Giarolla, E., P. Nobre, M. Malagutti, and L. P.
    Pezzi (2005), The Atlantic Equatorial
    Undercurrent PIRATA observations and simulations
    with GFDL Modular Ocean Model at CPTEC,
    Geophysical Research Letters, 32, L10617,
    doi10.1029/2004GL022206.