Title: Establishment of Geographic Information System Infrastructure
1Establishment of Geographic Information System
Infrastructure
Information Technologies Department November 12,
2008
2Studies Within The Ministry (Existing Situation)
The reconstruction of technological
infrastructure of our Ministry in the framework
for e-Government Action Plan of Prime Ministry is
clearly inevitable. For this reason, the
Information Technologies Department of the
Ministry has been reconstructed to maximize
efficiency and service quality. The
job descriptions for each branch of IT Department
have been reevaluated. In this context, a new
branch regarding to Geographic Information System
has been established.
3Inventory Proceeding
- In order to identify the activities, detailed
inventory sheets were formed and information was
colledted from each unit. - With inventory sheets, information was collected
about the following subjects - Completed projects
- On-going projects
- Existing GIS softwares
- Existing numerical data
- Planning Projects
- Benefits of a GIS in the Ministry
- Geographical Data which can define a layer
- Expectations and Targets,
4Sample Data Form
5The GIS technology in the world is expected to be
web-based within 2 or 3 years. Especially, the
applications like Google Earth has been deeply
affected the GIS technology. Development in
satellite techno-logies with much more sensitive
images can be a solution for the matter of
coaster map in GIS. It will be easier to reach
healty data. The developments in this area have
been taken into consideration in our studies.
6Geographic Information System Study Group
Layers
- A Geographical Information System Study Group
consisting of participants from all departments
of the Ministry was organized for - assessment of inventories
- exchange of ideas
- identification of layer structures belonging to
units - This study goup was collected at numerous
times in order to discuss the inventory sheets
and layer structures. - In this meetings, the participants were
informed about how to identify layer structures
and sample studies were summarized.
7Methodology - GIS Five Basic Components
7
8Layer Structure
9The General Directorate of State Meteorology
Affairs
Distribution of Meteorological Stations
10Environmental Protection Agency for Special Areas
Patara Special Environmental ProtectionArea
11The Ministry of Environment and Forestry-GIS
Infrastructure
Establishment of Central GIS Database
- In order to establish the central GIS
database regarding to identified layer structures
of units, first of all, sub-database were
prepared for each unit. - In this way, the management of data by related
units can be much easier. - Data collected from units were transferred to
these sub-database.
12The Ministry of Environment and Forestry
Geographic Information System Infrastructure
13The Ministry of Environment and Forestry-GIS
Infrastructure
14The Ministry of Environment and
Forestry- Geographic Information System
Infrastructure
Presentation of Data
- The planning data and the other type of data
belonging to the Ministry have been presented in
separate platforms in order to avoid from
technical problems.
15The Ministry of Environment and
Forestry- Geopgraphic Information System
Infrastructure
Presentation and Usage of Data
- Data presented in two different platforms can be
edited in both the intranet and the internet
without any software. - The advance editing on GIS database of the
Ministry is also possible in both platforms by
using desktop applications.
16Inspire
Inspire Directive is being carried out by
coordination our Ministry in Turkey.
Necessary regulations in National Programme have
been made for the advent of adaptation work in
2009. After approval of National
Programme, studies will start within the Ministry
by taking into account improvements of JRC with
contribution of other institutions.
17Corine
- Corine 2000 was completed. Corine 2006 is going
to be performed in coordination of the Ministry
of Environment and Forestry. - For this work, a team of expert in remote sensing
has been started to work on the project. - Corine 2006 will be conducted as joint work of
the Ministry of Environment and Forestry and the
Ministry of Agriculture and Rural Affairs.
18Corine
. Time Schedule
19Corine
The project of Corine 2006 is aimed to be
completed in May 2008. At this stage 1-
building up of a plug-in software onto ArcGIS 9.3
2- upgrading of satellite images
3- training is going on.
20Development Of A Web Based GIS Application With
EIS integration
- EIS integrated Web Based GIS Application has
been implemented incorporating some special
features such as the following - Web Browser Based GIS Application,
- Full Integrated with EIS,
- On-Map Data Entry and Drawing Option,
- Fast, Flexible, Dynamic Structure,
- Data Source Independent Application,
- Raster and Vector Data Display,
- Latest ESRI-GIS Infrastructure (Very first
application in the public sector in Turkey), - Rich Feature Search and Query functions,
- Advanced Integration Interfaces.
21Development Of A Web Based GIS Application With
EIS integration
Geodatabase and access schema in the institution
22Development Of A Web Based GIS Application With
EIS integration
EIS and GIS communication structure
23Development Of A Web Based GIS Application With
EIS integration
Web Based GIS Application GUI
24Development Of A Web Based GIS Application With
EIS integration
Editor Panel
25Thank You