Multiple degrees of freedom of movement. Influenced by heave, pitch, roll and reel tension ... by heave, pitch, roll and reel tension. Tension frame coupled to ... – PowerPoint PPT presentation

Number of Views:377
Avg rating:3.0/5.0
Slides: 14
Provided by: alastair4
Category:

less

Transcript and Presenter's Notes

Title: SPE 89632 Further advances in coiled tubing floater operations


1
SPE 89632Further advances in coiled tubing
floater operations
  • Alastair Buchanan
  • Schlumberger Well Services North Sea
  • Coiled Tubing Services Geomarket Engineer

2
Agenda
  • Norwegian Continental Shelf Activity
  • Conventional Approach
  • Issues and Strategies
  • Equipment Developments
  • Advanced Tension Frame (ATF)
  • Riser Slip Joint
  • Impact
  • Conclusions

3
Norwegian Continental Shelf Subsea Activity
  • 420 active wells
  • Increasing 10 p.a.
  • 60 Statoil production
  • Severe weather and sea conditions
  • Demand for intervention with CT increasing
  • Available installations semi-sumbersible rigs

4
Conventional Scenario
  • Injector suspended from winch
  • Multiple degrees of freedom of movement
  • Influenced by heave, pitch, roll and reel tension

5
Conventional Scenario
  • Injector suspended from winch
  • Multiple degrees of freedom of movement
  • Influenced by heave, pitch, roll and reel tension
  • Tension frame coupled to riser
  • Multiple transfers between motion frame of
    reference

6
Conventional Scenario
  • Injector suspended from winch
  • Multiple degrees of freedom of movement
  • Influenced by heave, pitch, roll and reel tension
  • Tension frame coupled to riser
  • Multiple transfers between motion frame of
    reference

7
Issues and Strategies
ACTIVITY
EFFICIENCY
RELIABILITY
SAFETY
8
Advanced Tension Frame
  • Injector head is constrained at all times
    motion is controlled

9
Slip joint
  • Influence of heave isolated below rig floor

10
Slip joint
11
Impact 1 Safety and Efficiency
Scenario
Scenario
Operation stage
Operation stage
Conven
-
Conv
.
ATF
Conventional
ATF
Conventional
ATF
ATF
slip
-
joint
slip
-
joint
slip-joint
slip
-
joint
Transfer 2 crew up
Transfer 2 crew up
Install BOP BHA 1
Install BOP BHA 1
Install injector
Install injector
Transfer 2 crew down
Transfer 2 crew down
Transfer 2 crew up
Transfer 2 crew up
Change to BHA 2
Change to BHA 2
Transfer 2 crew down
Transfer 2 crew down
Transfer 2 crew up
Transfer 2 crew up
Remove injector head
Remove injector head
Remove BOP
Remove BOP
Transfer 2 crew down
Transfer 2 crew down
Total HEL count
Total hazard level
12
Impact 2 Reliability vs Weather
100
90
80
70
60
Available days of total
50
40
30
20
10
0
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Conventional
Slip-joint
13
Conclusions
  • Field tested technology is available which is
    demonstrated to improve reliability and safety

ACTIVITY
ACTIVITY
RELIABILITY
RELIABILITY
EFFICIENCY
EFFICIENCY
SAFETY
SAFETY