LEED Green Building Program - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

LEED Green Building Program

Description:

Regal White SRI of 88. 1 Point. High-Sloped Roof (Greater than 2:12) All SMARTKOTE colors qualify except Dark Bronze, Evergreen & Regal Blue. 1 Point. LEED & Colors ... – PowerPoint PPT presentation

Number of Views:150
Avg rating:3.0/5.0
Slides: 18
Provided by: wesbr
Category:

less

Transcript and Presenter's Notes

Title: LEED Green Building Program


1
LEEDGreen Building Program
Version 1.1
2
LEED Green Building Program
  • LEED The Leadership in Energy and Environmental
    Design
  • Aims to improve occupant well-being,
    environmental performance and economic returns of
    buildings
  • A rating system
  • Projects earn one or more points toward
    certification by meeting or exceeding each
    credits technical requirements.
  • Points add up to a final score
  • Score relates to one of four
    possible levels of certification

3
LEED Project Checklist
  • Sustainable Sites 14 pts.
  • Heat Island Effect
  • Water Efficiency 5 pts.
  • Energy Atmosphere 17 pts.
  • Optimize Energy Performance
  • Up to 10 points
  • Materials Resources 13 pts.
  • - Points from Metal Buildings
  • Indoor Environmental Quality 15 pts.
  • Innovation Design Process 5 pts.
  • LEED Accredited Professional 1 point

Platinum 52-69 points Gold 39-51
points Silver 33-38 points Certified
26-32 points
4
LEED Project Checklist
5
LEED Project Checklist
  • Sustainable Sites

6
LEED Sustainable Sites
  • LEED SS Credit 7.2 Heat Island Effect - Roof
  • Use roofing materials having a Solar Reflectance
    Index (SRI) equal to or greater than the table
    below for a minimum of 75 of the roof surface.
  • Qualifies for 1 Point

7
LEED Colors
  • Low-Sloped Roof (212 or less)
  • Regal White SRI of 88
  • 1 Point
  • High-Sloped Roof (Greater than 212)
  • All SMARTKOTE colors qualify except Dark Bronze,
    Evergreen Regal Blue
  • 1 Point

8
LEED Colors
9
LEED Project Checklist
  • Materials Resources

10
LEED Materials Reuse
  • LEED MR Credit 1.1 Materials Reuse 5
  • Use salvaged, refurbished or reused materials
    such as the sum of these materials constitutes at
    least 5, based on cost, of the total value of
    materials on the project.
  • All the steel in ABC buildings can be recycled in
    the future
  • Qualifies for 1 Point

11
LEED Materials Reuse
  • LEED MR Credit 1.2 Materials Reuse 10
  • Use salvaged, refurbished or reused materials
    for an additional 5 beyond MR Credit 3.1 (10
    total, based on cost).
  • All the steel in ABC buildings can be recycled in
    the future
  • Qualifies for 1 Point

12
LEED Recycled Content
  • LEED MR Credit 4.1 Recycled Content 10
  • Use materials with recycled content such that
    the sum of post-consumer recycled content plus
    one-half of the pre-consumer content constitutes
    at least 10.
  • Over 70 of the steel in ABC buildings is
    manufactured from recycled steel
  • Qualifies for 1 Point

13
LEED Recycled Content
  • LEED MR Credit 4.2 Recycled Content 20
  • Use materials with recycled content such that
    the sum of post-consumer recycled content plus
    one-half of the pre-consumer content constitutes
    an additional 10 beyond MR Credit 4.1 (total of
    20)
  • Over 70 of the steel in ABC buildings is
    manufactured from recycled steel
  • Qualifies for 1 Point

14
ABC Metal Building Recycled Content
15
LEED Regional Materials
  • LEED MR Credit 5.1 Regional Materials 10
  • Use building materials that have been extracted,
    harvested or recovered, as well as manufactured,
    within 500 miles of the project site for a
    minimum of 10 (based on cost) of the total
    materials value.
  • Mechanical, electrical and plumbing components
    and specialty items shall not be included in this
    calculation.
  • Potentially qualifies for 1 Point depending upon
    where the project is located.

16
LEED Regional Materials
  • LEED MR Credit 5.2 Regional Materials 20
  • Use building materials that have been extracted,
    harvested or recovered, as well as manufactured,
    within 500 miles of the project site for a
    minimum of 20 (based on cost) of the total
    materials value.
  • Mechanical, electrical and plumbing components
    and specialty items shall not be included in this
    calculation.
  • Potentially qualifies for 1 Point depending upon
    where the project is located.

17
LEED Rating System ABC Buildings
Write a Comment
User Comments (0)
About PowerShow.com