Title: Brian Cullinane
1SMALL TONNAGE ABSORPTION CHILLERS (UNDER 100 tons)
Brian Cullinane
- Family Business
- 25 years selling
- Gas A/C
- 5 Employees
- New England
- Territory
- REP/DIST. For
- ROBUR Gas Chillers
2Air Cooled Absorption Chiller
- Natural or Propane Gas
- Air cooled
- Produces 45ºF c.w.
- Micro Processor
- controlled
- High Efficiency G.A.X.
- Absorption Principal
- (Ammonia Water)
5 - ton Model ACF 60
3Absorption Cycle
Ammonia(NH3)/water absorption principal
with (NH3) acting as the
Refrigerant
4Equipment Description
5Equipment Description
- 3 - Ton 5-ton Model
- 115 v on 3-ton
- 208/230 v 1Ø on 5-ton
- 3-ton is 23 w x 44 d x 45 H
- 5-ton is 44 w x 48 d x 54 H
- 45ºF supply chilled water
- AIR COOLED - no towers
6Equipment Description
- 10, 15, 20 25 ton Models
- Factory piped wired on skid
- 208/230v- SINGLE PHASE
- Factory staged in 5-ton increments
- AIR COOLED - no cooling towers
7Equipment Description
- 5-ton Chiller/ Heater
- 165,000 btu/hr input (HTG)
- Available with Pump expansion tank
- 208/230 v 1Ø
- Air Cooled
- 48 w x 54 d x 48 H
8PROS
- Balanced customer energy profiles - Economics
- Design flexibility - chilled water
- Expected lifetimes 2- 3 times comparable Dx
- Environmental Benefits - Natural gas vs Power
plants, no ozone depleting chemicals such as
CFCs, HCFCs - Remote locations - Chilled water underground
9PROS
- Reduce size of back up generators
- Reduce electrical upgrades
- Great for Retrofit Applications - Piping vs Duct
work - Can operate on LP gas to satisfy dual fuel
requirement for critical care wings - Modular design has built in Redundancy
- Minimal power requirement -1 Ø
10CONS
- Low Market Awareness of benefits - End
user/Architect/Engineer/Utility Personnel. - Higher Initial Investment approximately 500/ton
more than direct expansion equipment. - Sporadic Utility Support - Rebates, Sales
programs, special summer discount rates.
11APPLICATIONS
- Custom Residential gt 5,000 sq. ft. with 4
zones or more single phase power up to 25-
tons - Commercial Buildings lt 25,000 sq. ft. with
multiple zones Offices / Institutional /
Critical Care - Industrial Process Cooling Chilled water for
machines processes Laser Cutters, Welding
Heads, Plating
12APPLICATIONS -ResidentialMetlzer Residence
-Hyannis , Ma
- 10,000 sq. ft
- 15-ton chiller
- Remote
- location behind garage
- 2000 sq. ft
- 5-bay garge
- served by
- 3-ton chiller
13APPLICATIONS -Commercial
- Wiremold Computer Room
- 20-ton 15-ton
- Back Up Generator
- CT Institute for the Blind
- 50-tons ( 2-25-ton units)
- No Duct Work
14APPLICATIONS - Process
- Process Load
- Initial cost less than electric
- Over 100-tons now
-
Northeast Electronics Milford, CT
15ECONOMICS
- NSTAR Mass W.
Mass - Electric Electric
- Rate B-7 Rate G-2 Rate G-0
- C I C I Small General
- gt 10 kw Demand lt 200 kw lt 349
kw - Demand /Kw 24.22 per kw 6.90 per kw
9.53 per kw - Energy Charge 8.1per kwh 10.32 per
kwh 8.46 per kwh - (w/ Default)
- Gas Cost 0.65 per Therm or 6.50 per MCF
16ECONOMICS - 15 - Ton Unit - WEMCO
2000 Annual Hours
AIR COOLED 1.2 kw/ton 10 SEER
AIR COOLED .62 cop .77 IPLV
17ECONOMICS - 15 - Ton Unit Mass Electric Rate
G-2 2000 Annual Hours
Air-Cooled 1.2 kw/ton 10 SEER
Air-Cooled .62 COP .77 IPLV
18ECONOMICS - 15 - Ton Unit - NSTAR Electric
2000 Annual Hours
19Mail Sorting Facility Hartford, CT 600-Tons
Gas Chiller - Gas Heating
- 171,470
- Gas A/C Annual CCF
Gas Air conditioning accounted for 80 Annual
consumption
20Manufacturing Plant 400-Ton Gas Chiller
Separately Metered
Gas Air conditioning accounted for 65500 ccf
Annually
21Retail Package Store 3-Ton Gas Chiller
- Gas Heating
Gas Air conditioning accounted for 73 Annual
consumption
22Retail Store 5-Ton Gas Chiller
- Gas Heating
Gas Air conditioning accounted for 47 Annual
consumption
23School Administration Office Hartford, CT
50-Tons Gas Chiller - Gas
Heating
Separately Metered
- 6584 ccf Gas A/C
- Annual CCF
Gas Air conditioning accounted for 6584 ccf
Annually for 6 months