Sri Lanka's Experience with ICAO TCB Projects - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Sri Lanka's Experience with ICAO TCB Projects

Description:

Director-General of Civil Aviation and Chief Executive Officer, ... Sartorial Reviews. Technical Assistance. Regional Projects under cost sharing basis ... – PowerPoint PPT presentation

Number of Views:114
Avg rating:3.0/5.0
Slides: 20
Provided by: icao
Category:

less

Transcript and Presenter's Notes

Title: Sri Lanka's Experience with ICAO TCB Projects


1
Sri Lanka's Experience with ICAO TCB Projects
  • Presented by Chandrasena Nimalsiri
  • Director-General of Civil Aviation and Chief
    Executive Officer,
  • Civil Aviation Authority of Sri Lanka

2
Evolution of civil aviation management in Sri
Lanka
  • 1946 Department of Civil Aviation (DCA) was
    responsible for
  • Administration Enforcement of Air Navigation
    Regulations
  • Provision of Air Navigation Facilities Services
  • Development Maintenance of Aerodromes
  • Operation of the national carrier, Air Ceylon
  • 1952 National carrier was separated from the
    DCA
  • 1979 Development Maintenance of aerodromes,
    entrusted to the Airports Authority.(subsequently
    abolished)
  • 1983 Provision of Air Navigation Facilities and
    Services, entrusted to the Airport Aviation
    Services (Pvt) Ltd. DCA was reduced only to a
    regulator (controlled financed by the
    Government)
  • 2002 - Abolished the DCA and established a CAA
    ( autonomous self- financed)

3
Sri Lankas participation with TCB Projects
  • Regional Projects under UNDP Assistance for
  • Human Resources Development
  • Establishment of Civil Aviation Training Centre
  • Sartorial Reviews
  • Technical Assistance
  • Regional Projects under cost sharing basis
  • COSCAP-SA
  • Country Specific Project under a Trust Fund
  • Development of safety oversight capabilities of
    the DCA

4
Summery of events leading to the launch of a
country specific project by TCB
  • ICAO assessed DCA-Sri Lanka in Feb. 1997
  • Series of deficiencies were reported.
  • ICAO called for a remedial action plan.
  • Government sought assistance from TCB.
  • TCB proposed a country specific project.
  • The Government approved the Project (SRL/97/901)
    in April 1998.
  • The Project started in August 1998

5
Project Goals
  • Major Objectives
  • Redrafting Aviation legislation
  • Restructuring of the DCA
  • Employment of skilled staff for safety oversight
    duties
  • Development of written procedures / manuals for
    staff industry guidance
  • Training of the DCA Technical Staff

6
Performance Against Schedule
  • Plan To complete the Project within two years
    from the date of commencement (10.08.2000)
  • Actual The Project was terminated on 31st
    December 2002

7
Performance Against Quality
  • Actual
  • Civil Aviation Act was drafted
  • CAA was established with administrative and
    financial flexibility
  • International Experts were employed
  • Manuals/ Inspector handbook developed
    published
  • Training - on going
  • Goals planned
  • Updating aviation legislations
  • Creation of a Flexible and effective
    administration
  • Employment of Competent Professional staff
  • Development of Written procedures Guidance
    Material
  • training of local staff under international
    experts

8
Performance Against Budget
  • Budget
  • Initial estimate USD 3.47 million
  • Revised estimate USD 1.871 million
  • Approved budget USD 1.871 million
  • Actual cost/expenditures
  • At the end of two years USD 1.2 million
  • At the end of the project USD 1.6 million
  • Savings USD 0.3 million (including interests)

9
Post-Mortem By Department
  • SRL/97/901 Project

10
Project Planning How Was the Project Planned?
  • Who was responsible for original plans?
  • DGCA from Sri Lanka
  • TCB from ICAO
  • Was project well defined from beginning?
  • Project objectives defined in the Action Plan
  • Action Plan modified whilst in execution through
    mutual consultations

11
Project Planning Was the Plan the Right One?
  • Action Plan was realistic
  • Time lines proposed were subject to government
    inputs, approvals etc.
  • Project was steered by TCB through a Project
    Co-ordinator (PC).
  • PC was selected by Sri Lanka from TCB nominees
  • DGCA was appointed National Project Manager

12
How Was the Project Managed?
  • Project was assisted by International experts in
  • Airworthiness (02) 24 months
  • Operations (01) 24 months
  • Personnel Licensing (01) 03 months
  • Organizational Manpower Consultant (06- months)
  • Aviation legislation Consultant (06 months)
  • Project Progress was monitored through Technical
    Policy Review (TPR) Meeting held fortnightly
  • DGCA chaired the TPR Meeting
  • ICAO monitored the Progress of the Project
    closely
  • President, ICAO Council wrote to the Minister
    when matters were no moving at the required pace
  • Bipartite meetings
  • ICAO regional office

13
How Was the Project Managed?..
  • Project recruited NPPPs (Nationally recruited
    Professional Project Personnel) locally in
  • Airworthiness (01) 24 months
  • Operations (01) 24 months
  • Cabin Safety (01) 24 months
  • Personnel Licensing (01) 24 months
  • Aviation legislation (01) 12 months
  • NPPP understudied the International Experts

14
Project Deliveries
  • Organization
  • Legislation for establishment of the CAA (Civil
    Aviation Authority of Sri Lanka Act)
  • Development of Vision, Mission Motto for the
    CAA
  • Development of objectives
  • Defining Duties Functions of the CAA
  • Organizational Structure
  • Duties and functions of key post holders
  • Development of outcomes outputs
  • Setting the CAA values
  • Setting a Training Policy for CAA Staff
  • Vehicles, office furniture equipment purchased

15
Project Deliveries
  • Operations
  • NPPP in Flight Operations was trained
  • Manuals/Guidance Material produced
  • Flight Operations Inspector Handbook
  • Designated Check Pilot Manual
  • Cabin crewmember standard Manual
  • Cabin crewmember training standards Manual
  • Dangerous Goods Manual
  • How to obtain an airline licence guidelines
  • Checklist for initial certification of aircraft
    operators
  • Audit Procedures Manual
  • Air operators were inspected audited with NPPPs
  • Operations Regulations were drafted

Customization of COSCAP SA Generic Manuals
16
Project Deliveries
  • Airworthiness
  • NPPP in Airworthiness was trained
  • DCA Airworthiness Inspectors were trained
  • Manuals/Guidance Material produced
  • Airworthiness Inspector Handbook
  • Audit Procedures Manual
  • Air operators were inspected audited with NPPPs
  • Airworthiness Regulations were drafted

17
Project Deliveries
  • Personnel Licensing
  • NPPP in Personnel Licensing was trained
  • Manuals/Guidance Material produced
  • Licensing Regulations drafted
  • Licensing Procedures developed
  • Flying Training School Certification requirements
    drafted
  • Medical Examination Procedures developed
  • Board of Designated Civil Aviation Medical
    Examiners appointed

18
Direct Benefits of the Project
  • Governments attention recognition
  • Flexible Administrative Set up
  • Follow-up ICAO Audit Report was satisfactory
  • No major deficiencies
  • Only a few recommendations
  • Good acceptance, higher respect better
    co-operation by the Industry
  • Application of high level of safety standard
  • Systematic approach for safety oversight
  • Trained Staff

19
Projects in pipe line
  • Development of Civil Aviation Master Plan for Sri
    Lanka - with CAA
  • Re-assessment of runway surface condition with
    AASL
  • Aviation Security Project with CAA
Write a Comment
User Comments (0)
About PowerShow.com