Title: WCP Leak Remediation Project
1WCP Leak Remediation Project
- Working Drawings for Units 917 and 918
- Remaining Issues July 28, 2009
2Agenda
- Trellises
- Courtyard Patio slope
- Roofing membrane TPO vs. PVC
- Deck Drainage
- Vents
- Appendage wall junctures
- Exterior Lighting
- Review of 100 drawings
- Schedule for ARB review
3Trellises
- Base project must include trellises
- Essential to the distinctive architectural design
of the complex - Original version in carport
- Alt-deducts would provide useful info for larger
project
4Courtyard Patio Drainage
- We measured the grading in the courtyard and both
patios of both 917 and 918
- FatMax 5
- Accuracy up to 1/4-in at 100-ft
5(No Transcript)
6(No Transcript)
7(No Transcript)
8(No Transcript)
9(No Transcript)
10(No Transcript)
11Courtyard Patio Drainage
- All orthogonal slopes range from 0. to 0.9
- All diagonal slopes range from 0.8 to 1.2,
except for 917 corner patio - Given the roof drainage plan, re-grading of the
patios is needed to comply with 2 slope
specification - Re-grading of the courtyard is included in the
project as an Add-alt - Given water intrusion in 918, re-grading of
courtyard is required
12Roofing Membrane TPO vs. PVC
- It has been brought to our attention that the
negative environmental impact of PVC (during
manufacture, upon UV exposure and in extreme
heat) has lead the industry to advance an
alternative material, known as TPO. - We request an expert assessment of the relative
merits of the two materials that has lead to the
choice of PVC for this project.
13Deck Drainage
- We perceive the following sub-optimal features of
the current design - long, obtrusive horizontal element inside the
garage - Distance between drain and scupper will result in
large pooling - Height differential between bottom of scupper and
bedroom door threshold is small (1.7) - deck penetration
14Deck Drainage
- We suggest consideration of an alternate design
that eliminates these negatives - relocate drain and scupper to equivalent position
on opposite side of the deck - incorporate a horizontal exterior element along
carport wall (above trellis) to drain to the
inner corner of the carport - We request a expert assessment of the comparative
advantages and disadvantages of these alternatives
15Vents
- We remain concerned that standard vents will
not adequately protect against water intrusion in
the fierce weather conditions our units
experience during El Niño years. - We request that louvered vents be specified with
a Wind Driven Rain performance rating (e.g., 50
mph wind at 8" rainfall rates) - cf. http//www.archlouvers.com/Louver_E4WH.htm
16Exterior Lighting
- We are pursuing a consensus on alternate exterior
lights (to be purchased by the HOA) - Can the 917/918 project be specified in a manner
that allows for remounting of either original or
provided lights? - If so, by when are specs needed for incorporation
of HOA purchased lights into 917/918? - If not, by when for incorporation into the
WCP-wide project?
17Appendage wall junctures
- Appendage walls on some units have separated from
the wall of the unit, allowing water penetration
18Appendage wall junctures
972
19Appendage wall junctures
968
20Appendage wall junctures
967
21Review of 100 Working Drawings
- Our review identified several details that still
need to be specified in the working drawings - Roof flashing details
- Deck trellis gable
- Vent specifications
- Courtyard-foyer vertical offset
- More?
- We are assured that these will be
included/clarified in the 100 working drawings - We anticipate the opportunity to verify their
inclusion/completeness in the 100 drawings
22Schedule for ARB Review
- When will the Architectural Review Board review
and approve the working drawings?
23end of presentationsupport slides follow
24louvered vents
25Deck Drain analysis
26Drawing Review
- Roof Flashing
- Omission of an important external drain
- Study Patio Elevation Drawing Omission (no slide)
- Deck Drain
275/5.01
Drawing Prefix A omitted for brevity
6R/5.01
6/5.01
286/5.01 (ground level appendage)
6R/5.01 (ground level appendage)
5/5.01 (ground level appendage)
6/5.01
6R/5.01
5/5.01
5/5.01
6R/5.01
5/5.01 (deck appendage)
6R/5.01
6/5.01
6R/5.01
6R/5.01
6R/5.01
6R/5.01
29Places where specially formed flashing and/or
detailing may be needed
Places where specially formed flashing and/or
detailing may be needed
Corners where coping meets
30A3.01B
External Drain from Entryway roof
31(No Transcript)
324 Scupper Height Dimension
Drain Strainer
3 Horizontal Pipe Diameter
2 Vertical Pipe Diameter