MIT Campus - PowerPoint PPT Presentation

1 / 29
About This Presentation
Title:

MIT Campus

Description:

SEG. CPD. Trade Teams. Zone Teams. Operations Center. R&M Support. April 21, 2006. 4 ... Facilities is the largest administrative department at MIT. Facilities ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 30
Provided by: mdam8
Category:
Tags: mit | campus | seg

less

Transcript and Presenter's Notes

Title: MIT Campus


1
  • MIT Campus
  • Plant Maintenance
  • Project Review

2
Agenda
  • Facilities Organization - Bernie
  • History - Mike
  • Overview of Implementations Bob
  • Project Time Line - Bob
  • System Benefits - Bernie
  • Unique Challenges - Bob
  • Scope Mike
  • Business Processes Overview - Bernie
  • System Design - Bob
  • Master Data - Mike
  • GuiXT Demo Mike
  • QA - All

3
Facilities Organization
4
Facilities Organization
  • Facilities is the largest administrative
    department at MIT
  • Facilities maintains 150 buildings
  • 120 million operating budget
  • 200 million space change expenditures
  • 600 Employees
  • 10.7 million square feet of space
  • From 2002 to 2006 campus will increase in size by
    20
  • 24 X 7 operation

5
Project History
  • PPL system developed by MIT central IS group in
    1980s 1990s
  • Maximo implemented as part of Reengineering in
    late 1990s
  • Enhancements to Maximo including expansion to
    Housing and CUP over time
  • Discovery Effort to investigate SAP PM with
    representation from IST, Facilities and an
    outside consultant in 2003
  • SAP PM Phase I implementation in 2004

6
Overview of Implementations
  • Phase IA 3 months (Oct Dec 2003)
  • SAP Alternative Evaluation
  • Gap Determination and Analysis
  • System Recommendation (SAP/Maximo)
  • Phase I 6 months
  • Replace Maximo legacy system for Facilities
    Repair and Maintenance with SAP PM (Jan - July
    2004)
  • Phase II
  • Facilities Enhancements Jan 2005
  • Department of Housing Feb 2005
  • Facilities Central Utilities Plant (CUP) March
    2005
  • Data Warehouse Integration May 2005
  • EHS Integration Sept 2005
  • Phase III - Proposed
  • Facilities Custodial and Grounds - planned

7
System Benefits
  • Integrates accounting, materials, and labor in
    real-time
  • Eliminates 2 stand alone software applications
  • Provides ability to plan and track labor
  • Tracks costing data to lower levels of detail
  • Provides data to perform repair/replace decisions
  • Lays the foundation for subsequent efforts (EHS)
  • Eliminates dual entry of 2,400 annual orders

8
Unique Challenges
  • First Administrative Computing customer that
    operates 7 x 24
  • Reduce system downtime (5 to 2 1/2 days)
  • Backup system proposed
  • Implement easy to use screens
  • GuiXT solution
  • Web Front-end integration for Facilities and
    Housing Organizations

9
Scope
  • RM
  • Repairs
  • Web Front-end for MIT community
  • Automatic email notifications on create and close
  • Building alert messages
  • Sales orders
  • Preventive maintenance
  • Equipment 25,000
  • Task List/Maintenance Plans 10,000
  • Materials reservations
  • Permits
  • Labor confirmation work centers
  • Barcode on shop papers (Order Number, Material)
  • Facilitates goods issue process
  • Sub Orders

10
Scope (cont.)
  • Housing - 16 Dormitories
  • Web Front-end for students
  • Automatic email notification on create and close
  • Accounting is out of scope
  • Central Utilities Plant (CUP) 4 Buildings
  • Preventative Maintenance 90
  • Equipment 2,040
  • Unscheduled Repairs 10
  • Accounting Phase III

11
Process Overview
12
System Design
  • GuiXT Solution
  • Combines multiple SAP screens into a single
    screen
  • Reduces SAP complexity
  • Non-ABAP scripting language with the ability to
    enhance interface functionality
  • Implemented for Repair Operation
  • Preventative Maintenance requires a more complex
    customer interface and has fewer users
  • Customize SAPGui to Facilities processes
  • Able to use enhance SAPs functionality

13
System DesignGuiXT
14
System DesignGuiXT
15
System DesignGuiXT
16
System DesignGuiXT
17
System DesignGuiXT
18
System DesignGuiXT
19
System Design
  • Enhancement Tab for additional fields (ZIW38)

20
System Design
  • EHS Integration
  • EHS ? PM
  • Corrective Action Creates PM Work Order
  • EHS Reference Number
  • PM ? EHS
  • Operations Center Flags EHS Relevant Emergency
    Work Orders
  • Batch Program Update

21
Master Data
  • Master Data
  • Work Centers
  • Functional Location building, floor
  • Equipment
  • Classification
  • Permits - Lockout Tagout
  • Planner Groups
  • Activity Types

22
Master DataWork Centers
23
Master Data Functional Location
24
Master DataPlanner Groups
25
Master DataActivity Types
26
Master DataEquipment Classification
27
Master DataPermits
28
Master DataPermits
29
Demo
  • GuiXT System Demo Mike Sherman
Write a Comment
User Comments (0)
About PowerShow.com