Title: TVT Interfaces for TTPD
1TVT Interfaces for T/TPD U/UPD at NSPO
AMS-02
- Presented by
- Chia-Ray (Steven) Chen
- Jih-Run (J. R.) Tsai
- National Space Program Office
- March 2, 2005
2Content
- Thermal Vacuum Test Facility
- Temperature Profile
- Test Interfaces
- Required Information
- Test Window Arrangement
3Thermal Vacuum Test Facility
- Small Thermal Vacuum Chamber
- working volume 1.5m x 1.5m
- shrouds -196oC, -173oC 127oC
- thermal baseplate 1m x 1.25m, -60oC 100oC,
100kg loading capacity with 2g requirement
Thermal baseplate
STVC
4Temperature Profile
Temperature (Proto-flight Test Level)
Pump Down
Thermal Balance Phase
Return To Ambient
Thermal Cycling Phase
Chamber Environments Pressure?1.0x10-5 mbar
Hot non-operation (85oC)
1 hr
2 hrs Hot soak
2 hrs Hot soak
1 hr
1 hr
Hot Operation (55oC)
Transient Cool-Down
Hot Balance
Ambient
Cold Balance
Cold Operation (-25oC)
Operation (on)
2 hrs cold soak
2 hrs cold soak
Non-operation (off)
Cold non-operation (-45oC)
1 hr
1 hr
1 hr
1 hr
Turn on
Turn off
I
A
B
C
D
E
F
G
H
J
K
L
O
Q
M
N
P
5Test Interfaces Flight Configuration
Wake Radiator
Ram Radiator
6Test Interfaces Test Configuration
- Electronic crates are suggested to be separated
from their power boxes according to the flight
configuration. - The dimensions of crates will be updated when
engineering drawings are received.
1.25 m
1.25 m
31.3 cm
31.3 cm
20.4 cm
20.0 cm
1 m
34.2 cm
T
1 m
U
23.7 cm
TPD
UPD
40.3 cm
27.5 cm
Test adapter
Test adapter
Thermal baseplate
STVC door (feedthroughs)
STVC door (feedthroughs)
Thermal baseplate
7Test Interfaces Electrical
- Four 55 pins of feedthroughs (95-44 CD951 B07H
22-55PS) will be used for electrical signals and
two 24 pins of feedthroughs (DM5623-37-2-PP) for
power. ---- Reserved for T/TPD and U/UPD - NSPO will use three 24 pins of feedthroughs
(DM5623-37-2-PP) for heater and seven 37 pins of
feedthroughs (DM5623-37-37-PP) for thermocouples. - Is there any EGSE box inside small thermal vacuum
chamber (STVC)? gt TFS UFS? Power
dissipations? Temperature range? Vacuum
approved? - Corona issue for T/TPD/U/UPD?
DM5623-37-2-PP
DM5623-37-37-PP
95-44 CD951 B07H 22-55PS
8Test Interfaces Mechanical
- Test adapter will be prepared by NSPO to simulate
AMS-02 radiator panel during Crates TV test. Test
heaters and thermocouples will be installed on
test adapter for precise temperature control. gt
Engineering Drawings are required. - Cho-Therm will be used between crates and test
adapter to simulate thermal coupling of flight
condition. - Is there any MGSE required for TV tests?
crate
Cho-Therm
screws
Test adapter
thermal baseplate
Cho-Therm (enhanced thermal control)
9Test Interfaces Thermal
- Test heaters and thermocouples will be installed
on thermal baseplate, test adapter, crate inside
and outside to control and monitor temperature
variations during test. -
- Locations of test thermocouples inside and
outside crates will be decided by NSPO (with
comments from CGS, MIT, and CSIST) based on test
prediction results including interfaces of PCBs
and case. - Thermocouple locations on chips or parts will be
decided by crate design engineers before test
preparations.
10Test Interfaces Thermal (Continued)
- Test thermocouples will be installed on the hot
zones of T crate and TPD. - Will all PCBs be turned on all the time?
- Are the power dissipations correct?
11Test Interfaces Thermal (Continued)
- Test thermocouples will be installed on the hot
zones of U crate and UPD. - Will all PCBs be turned on all the time?
- Are the power dissipations correct?
12Test Interfaces Test Area
- STVC and TDHSHCS are located in test high bay,
but remotely controlled in TVC control room.
(facility team) - Thermal engineers will use real-time monitoring
system in TV test checkout room to trace
temperature control. (thermal team) - AMS-02 test engineers will reside at TV test
checkout room. (crate test team)
STVC
TDHSHCS
IT Highbay
20m
Trench (signal and power cables)
thermal and crate test teams
TV test checkout room
TVC control room
facility team
20m
13Required Information
- Test requirements
- Any change on test requirements?
- Pre-test predictions
- Thermal models for T, TPD, U, and UPD were
received from CGS recently, and need to be
reviewed and discussed. - Compared with J crate, is there any change on T
and U crate mechanics besides the number of
slots? If yes, the updated parameters should be
provided. - Updated power dissipations if any
- Delivered items needed (2 months before test)
- Engineering drawings for T, TPD, U, and UPD
- Electrical test procedures
- Material lists and outgassing data (including
EGSE boxes) - Lists of crate test engineers and their personal
information
14Test Window Arrangement
- Possible test window is allocated for AMS-02
crates thermal vacuum tests by using NSPO test
facility as follows
Some FORMOSAT-3 AIT activities may be conducted
in this window.
01/01/2005
06/15/2005
9/30/2005
12/30/2005
ROCSAT-3 launch preps. flight operation
FORMOSAT-3 AIT
Possible window