Title: MICE Management


1
MICE Management
Paul Drumm MICE-UK May 2006
2
Items
  • Responsibility rearrangements
  • Chris Nelson ?Yury
  • Chris
  • Hall Infrastructure
  • Interface to the cooling channel
  • CN (TJ, SY) group to oversee coordinate
    integration
  • Yury
  • Focus on hydrogen system

3
Items
  • Tracker Review (more later)
  • TB (PD, ABl, ABr, ME, WLSY)
  • GG, PS
  • Review encouraged by progress
  • Main points
  • number of suggestions
  • document and prove the QA procedures with new
    station
  • risk strategy

4
Beam line geometry
Support Rails
5
Items
  • ISIS
  • Pion capture to decay solenoid
  • EID
  • Decay Solenoid Cryogenics
  • Liverpool
  • Beam components in MICE hall
  • Three stands, rails (Q207)
  • MICE Installation infrastructure
  • (rail system)

6
Items
  • ISIS Shutdown
  • First indication during Osaka meeting
  • Now confirmed
  • Starts 22nd December 2006
  • Ends 31st August 2007
  • Additional shutdown
  • Mid Oct-mid November 2006
  • Probably ditto in 2007

7
Schedule status
  • Within schedule little slack
  • Completion of the hall work
  • waiting for feedback of key information
  • Stairs
  • Mezzanine (Hydrogen System Access)
  • Platform (support for MICE)
  • Window for Solenoid Commissioning with Cryogenics

8
Items
  • Interlocks
  • Developed a philosophy
  • Four areas access control
  • ISIS
  • Solenoid Shielded area
  • Hall
  • Outside
  • Ensuring initial integrity is non-trivial

9
Items
A
Internal
External
B
MuonSolenoid
D
MBL
ISIS RING
RF
B
!
H
Target
Cable route (below ground)
Fire escape
C
10
Milestones
  • Completion of hall work
  • Target test on balance, go for October?
  • Delivery, Installation and handover of Cryogenics
  • Start of Shutdown
  • Delivery of beam line components (Sync)
  • Tracker
  • ToF/MuCal DAQ Frascati test beam

11
RD Milestones
  • Hydrogen System
  • Delivery of hydride bed
  • Full response to hydrogen review, Hazop ...
  • Tender for RD system, cryostat
  • RF Power System
  • Low power system
  • RF Tubes (4616) ?
  • HV System ?
  • Assembled 300kW system
  • Power into load June 06

12
Financial Status
  • Last FY under spend
  • largely staff travel
  • Large items
  • Decay solenoid cryogenics
  • 100 (200k)
  • RF equipment
  • 100k amplifiers
  • Phase 2 ISIS Contribution (30k)
  • Optical Fibre, Cryo-coolers
  • 40k 90k (WFL Contribution)
  • In progress Beam line power supplies
  • (100k?)