Title: SEC Procurement
1SEC Procurement
- Mary Bennell,
- Director Procurement and Assets,
- Amicus Horizon Group
2Procurement during business planning stage
- External and Communal Area Painting- 1066 ,Rother
Homes, Southern Horizon and Kelsey. - Contract awarded to Colours Decorating in May
2007. - Internal and External Building Works Framework
available to all members . - Framework signed September 2007
3Procurement during business planning stage
- Lift Maintenance Swale, West Kent and Town and
Country Procurement nearly complete. - Grounds Maintenance - West Kent ,Town and Country
and Maidstone Housing Trust. Procurement nearly
complete.
4Procurement in Implementation Phase
- Gas servicing and heating installations
- Boilers
- Doors and Windows
- Digital Aerials
- Warden Call and door entry
5Internal and External Building Works Framework
6Framework Volumes
- 18.5m over 5 years - confirmed
- 70m over 5 years - potential based on members
volumes -
7Scope
- Internal refurbishment works, including but not
limited to new kitchens and bathrooms. - External repairs and improvements
- Maintenance and improvement to external envelopes
including walls roofs and rainwater goods - External works to fencing and hard landscaped
areas - Associated partnering and planning supervisor
services. - Call off contracts will either be ongoing Term
Programmes throughout the life of the Framework
or one off Projects.
8Volumes
9The Framework Lots
- Lot 1- 250,000 per annum per contract with a
member-10 contractors - Lot 2 - 250,000 to 1 million per annum
9 contractors - Lot 3 - Over 1 million per annum- 6 contractors
10Lot 1 Contractors
- Booker Best
- Lakehouse Contracts
- Crispin Borst Ltd
- Fairhurst Ward Abbots Ltd
- MITIE Property Services (UK) Ltd
- Apollo London Limited
- Ian Williams Ltd
- DCB (Kent) Ltd
- BSW Building Services Ltd
- B.A. Troke Son Ltd
11Lot 2 Contractors
- Lakehouse Contracts
- Crispin Borst Ltd
- Booker Best
- Apollo London Limited
- Fairhurst Ward Abbots Ltd
- MITIE Property Services (UK) Ltd
- BSW Building Services Ltd
- Ian Williams Ltd
- DCB (Kent) Ltd
12Lot 3 Contractors
- Lakehouse Contracts
- Crispin Borst Ltd
- Apollo London Limited
- RR Richardson Ltd
- MITIE Property Services (UK)Ltd
- Fairhurst Ward Abbots Ltd
13The Framework Agreement
- NCA Template Document
- Schedule 1 Consortium Programme
- Schedule 2 SEC Framework Documents
- Schedule 3 Model Partnering Documents
- Schedule 4 Framework KPIs and Targets
- Schedule 5 Framework Programme
- Schedule 6 Form of Joining Agreement
- Schedule 7 Form of Risk Register
- Schedule 8 Direct Call-Off with Price
Confirmation Form of Instruction and Brief - Schedule 9 Mini Competition Rules and Form of
Tender - Schedule 10 TPC2005 Form of Contract (SEC
version dated 31 July 2007) - Schedule 11 Strategic Alliancing Agreement
-
14KPIs and Targets
- Commissioning Client satisfaction-Product
- Commissioning Client satisfaction-Overall service
- Resident satisfaction product
- Resident satisfaction service
- Snagging at handover
- Predictability cost
- Predictability time
- Safety
- Average unit cost
- Cost reduction
- Waste reduction
- Employment and training
15Price Framework
- Pricing on basis of standard specification for
kitchen and bathroom - Plus minus on NHF SOR 5.1
- Overall costs for installing 50,100,500 kitchens
and bathrooms - Open book plus percentage for prelims, overheads
and margin
16Call offs
- There are two methods of call-off under the SEC
Framework Agreement for any one project- - (i) Direct Selection of a single Constructor with
or without price confirmation - ii) Mini-competition between a number of
constructors.
17Call off - Direct selection 1
- Call off basis
- The nature of the Services to be performed by the
Constructor/required by the Client - The Framework Proposals (i.e. the tendered
quality submission of the Constructor annexed at
to each Framework Agreement) - The prices set out in the Price Framework (i.e.
as tendered by the Constructor annexed at
Pricing Schedule in each Framework Agreement).
18Call off - Direct selection 2
- It is a condition of direct selection that the
client chooses from the appropriate lot for the
value for works and then selects the contractor
in accordance with their ranking on the scores at
the time of selection. The only reason for
departing from this process is if the works are
of a nature than the constructor cannot carry
out those specific services or does not have the
capacity .
19Call off - Direct selection 3 -The process
- Issue specifications to contractors/service
providers and ask for price confirmation in
accordance with the prices submitted in original
bid . - Use one of 3 pricing modes
20Direct Call offs Price confirmation
- Where the nature of the works required mean that
the costs cannot be clearly agreed from the
prices set out in the framework agreement, the
client can draw up a price schedule in accordance
with the percentages for SOR and for back office
overheads and margins as set out in the price
framework . This can then be sent with a form of
instruction to the Constructor in the appropriate
lot.
21Call offs - Mini competition 1
- The mini-competition procedure is set out at
Schedule 10 of the SEC Framework Agreement and is
governed by the Mini-Competition Rules set out
in that schedule.
22Call offs - Mini competition 2
- To summarise
- The Client must send out a Mini-Tender, which
includes all of the relevant details of the
Project, the Model Brief, the relevant pricing
mechanism and the Project-specific evaluation
criteria to be applied and invite tenders to be
submitted on the basis of this information. - Strictly speaking all constructors appointed to
the eligible lot must be asked to take part in
the mini tender but the nature and location of
the works may automatically preclude some
constructors and some may not wish to take part.
23Mini tender
- Issue mini tender with specification to those
going to bid. - Including specific requirements but none that
substantially change scope of the framework or
framework terms. - Request reasonable return date
- When tenders come back evaluate as a normal
tender but only on criteria in mini tender.
24Which method of call off is used
- Can you call off directly using one of the
pricing mechanisms? - How far away in time are we from the original bid
prices ?
25Demonstrating value for money
- Direct call of on basis of original prices can
refer back to original framework bid - Direct call off on basis of SOR refer to SOR
levels in original frameworks - Open book will have to make reference to rates
but also to similar projects and benchmarks as
carried out - For large value projects independent Qs report on
value for money may be required. - Mini tenders results of mini tender will de
facto demonstrate
26Choosing contractors to call off
- Direct go to top of list unless specific capacity
or logistical reasons. - Capacity Amount of work contractor already
carrying out for association /group - Agreement with other members doing call offs on
capacity. - Need to consider individual members exposure to
certain contractors
27Capacity and logistical reasons
- Expertise
- Other business reasons ie already doing an
earlier phase of the project - Poor performance recorded through current
framework or earlier dispute - Logistical - Location
28Who is using the Frameworks ?
- 1066 HA
- Rother Homes
- SLFHA Ltd
- Southern Horizon
- Russet
29(No Transcript)
30(No Transcript)
31The next steps
- Assessing performance on current framework
- Planning for 08/09 and beyond to the end of the
framework. - Client core group meets in January 2008
- Setting up contractors core group