Title: Development


1
Development Implementation of a SCADA System
for Load Control of the Power System Simulator
(PSS)
United Arab Emirates University College Of
Engineering Electrical Engineering Department
Graduation Project (II)
  • Student Name ID
  • Ahmed Fayez Fikry 199905252
  • Khalid Yousuf 199900237
  • Moh' d Hashem Al Kilani 199901444
  • Salman Al katheeri 199900317

2
Software Part
  • Troubleshoot
  • ISaGraF

3
Troubleshooting
  • I/O port in the PC

4
Troubleshooting
  • XOR operation (00 or 11 ? 0)
  • (01 or 10 ? 1)

5
Troubleshooting
  • RTU Diagnostic Switch mode (FE)

6
Under Voltage logic
7
Variables in ISaGRAF
8
Hardware Part
9
Trouble shooting
  • Check the electric drawing of the PSS.
  • Connection Check.
  • Make sure that all the safety considerations are
    functioning well (Interlocks).
  • Monitor the response time of the system and try
    to improve it.

10
Adding generator II
  • An Extra standby Generator will be added to the
    system
  • Generator II will be used in case Generator I
    fails.
  • This will increase the system reliability? if one
    generator goes down the loads will still be fed
    by power.
  • Adding an extra generator to the system will
    increase the loads that can be supplied by power.

11
Advantages of parallel operations
  • Several generators can supply bigger loads than
  • one machine itself.
  • Increase reliability (what is reliability?).
  • - If one fails the total power is not lost.
  • If many generators - can shut down one and do
  • the maintenance.
  • If only one generator, then when operating at
    low
  • load it is inefficient.

12
Parallel Operation conditions
  • The two generators must have
  • Same rms line voltages.
  • Same phase sequence.
  • Same phase angle.
  • Almost same frequency.
  • Same phase sequence.
  • Then the two generators can be put in
  • parallel operation.

13
Parallel Operation
  • A syncrocheck

14
Power Factor
  • Real Power (P)
  • Reactive Power (Q)
  • Apparent Power (S)
  • S P jQ
  • PF P/S cos ?
  • 0 lt PF lt1
  • "leading" or "lagging" to show the sign of the
    phase angle between the voltage and current.

15
Reactive Power
16
Troubleshooting
17
PF Logic
18
Capacitor Logic
19
Troubleshooting
  • Checking the type of wires used in
  • the connection and there compatibility.
  • (shielded wires or unshielded)

20
Troubleshooting
  • Checking the circuit diagrams and the electric
    drawings of the of the PSS.
  • Making sure the safety precautions are working
    properly (Interlocks).

21
Adding Generator II
  • Generator II will be added to the system
    allowing
  • Feeding more loads with power
  • Increase system reliability.
  • Allows parallel operation with Generator I.

22
Adding Generator II
  • In order to add Generator II to the system the
    following components are required
  • Active power transducer
  • Voltage Transducer.
  • Current Transducer.
  • Frequency Transducer.

23
Transducers
  • A transducer is a device that converts
  • one type of energy to another, or responds
  • to a physical parameetr, generally it
  • has two electrical terminals.

24
Parallel Operation advantages
  • Supplying bigger loads
  • Increase the system reliability i.e if one
    Generator goes down the network is still
    supplied with power.
  • If one generator is open for maintenance the
    network is still supplied with power.

25
Parallel Operation conditions
  • Same RMS voltage.
  • Same Phase sequence.
  • Same Phase difference.
  • Almost same frequency
  • When these conditions are met its only then that
    the parallel operation is possible.

26
Synchroscope
  • The Synchroscope will be used to check the
    frequency and the phase difference of the 2
    generators.
  • It will alert the user when the
  • two generators are ready
  • to be synchronized.

27
Synchroscope
  • The rotation of the pointer is with reference to
    the bus voltage.
  • Clockwise
  • Generator frequency gt BUS frequency. ? speed of
    the generator must be reduced.
  • Anticlockwise
  • Generator frequency lt BUS frequency. ? speed
    of the generator must be increased.

28
  • Thanks for Listening,
  • If You have any Questions please Ask.