Title: Meanwhile back at the ranch.
1Meanwhile back at the ranch.
2(No Transcript)
3(No Transcript)
4(No Transcript)
5Sometimes more can present new challenges.
6TxDOT SiteManager Materials
- We began designing tools to enhance SiteManager
pre- implementation. - More recently we began making small changes to
SiteManager. -
7TxDOT Plug-in spreadsheets posted to the WWW
8TxDOT plug-in viewer
9eSM2
- The Contract Material
- Conversion tool is now included with the general
release.
10eSM2
- Automated Sample ID
- Every sample now has a sample id generated by
SiteManager. - Users are allowed to overwrite the id.
11Our internal website
12(No Transcript)
13LIMS Sample Tracking
14LIMS Test Results
15LIMS Specifications Test Methods
16LIMS Producer List
17LIMS Calibration
18LIMS Certification
19LIMS data in SiteManager
- TXTRAS test template with data displayed and
retrieved from LIMS.
20SiteManager Auto test
- New TX140Auto test template. It allows a user to
record several (up to 100) individual TX140
tests in one (1) template with each entry (row)
counting toward satisfying the contracts ST
requirements.
21(No Transcript)
22SiteManager Amigo
- Main Window
- The main window support two separate areas.
- Daily Work Reports
- Sampling and Testing
23SiteManager Amigo
- DWR
- The DWR window contains everything is a standard
SiteManager DWR.
24SiteManager Amigo
- Sampling and Testing
- The sampling testing window allows users to
create all types of samples and record field
testing.
25SiteManager Amigo
- Sample Basic tab
- The basic tab records the basic sample
information - Sample id
- Material
- Sampled date
- Status
- Sampled by
- Producer
- etc
26SiteManager Amigo
- Sample Add Test Method
- Selecting a test method assigns it to the sample.
27SiteManager Amigo
- Sample Test tab
- Amigo was developed to record test data for
- Tx115
- Tx130
- Tx140
- Tx244
- Tx417
- Tx423
- Tx4FRESH
28So what do the natives say?
29Field Device and Connection Options Available
- Standard network SiteManager connection using
TxDOT equipment - Citrix SiteManager connection using TxDOT
equipment on a contractor supplied ISP - Citrix SiteManager connection using contractor
supplied equipment on a contractor supplied ISP - Microsoft Terminal Server SiteManager connection
using TxDOT equipment over a TxDOT intranet
connection - Standalone SiteManager using TxDOT equipment
- Standalone SiteManager using contractor supplied
equipment with Secure Digital SD card - Amigo using TxDOT equipment
30(No Transcript)
31(No Transcript)
32(No Transcript)
33This aint our first rodeo.
34Is there room for improvement?
Is now a good time to move?
35(No Transcript)
36(No Transcript)
37SiteManager Materials Workgroup
38Material Categories
- Design materials
- QM materials
- Quantity based materials
- Tested materials
39In a perfect world
- Mix designs could be associated to CCSJ / items
of work. The design would need to be valid
(up-to-date) to be used. If a producer was
expired the design would no longer be valid.
Assuming all producers were valid the mix design
would satisfy QM sourcing requirements for the
item.
40QM Samples (sourcing)
- QM based on sourcing.
- Once an approved source is added no sample should
be required. We have too many samples in the
system already. - Need a utility to manage producers / suppliers /
materials also need to modify SiteManager to work
off valid producers for QM materials.
41(No Transcript)
42(No Transcript)
43Initial Prototype SiteManager contract sampling
and testing window.
44Initial Prototype Contract ST will be selected
by CSJ, Project, and then MATERIAL.
45Initial Prototype Conversion factor editing.
46Initial Prototype Material QM sourcing will be
built into the window. QM sourcing now done
manually by copying samples will be automatic /
Mix Design association.
47Initial Prototype Mix designs, will be
associated to the project by the inspector
through the DWR window
48Initial Prototype Contract Materials sampling
and testing editing.
49Initial Prototype The sampling checklist report
will be moved inside the contract sampling and
testing window. To display all materials ST
requirements.
50Initial Prototype The status tab will display
the materials deficiencies.
51Once we went out on the edge we could see more
clearly
52(No Transcript)
53(No Transcript)
54(No Transcript)
55Materials information as displayed in SiteManager
3.6
56We wanted to be able to interact with matls in
this window so we moved matls under their own
tab.
57Item Materials tab
58Different item / quantity / material
59Click here
Project tests to be performed on this material
60Sample is created, it is already associated to
the project line item.
61Contract information is loaded by default.
62The deficient tests are automatically associated
to the sample.
63We have to hurry to beat the traffic.