Title: Hong Kong Experience of CDM in Public Works Projects Speaker :Dr. Alex C O LI, Chief Assistant Secre
1Hong Kong Experience of CDM in Public Works
Projects Speaker Dr. Alex C O LI, Chief
Assistant Secretary (Works), Development Bureau
2Accident Rates of Hong Kong
3What is Construction Design Management (CDM) ?
4CDM is
- Risk management tool
- Objective
- Enable project team to identify and address
health and safety risks throughout project cycle
5CDM helps to bring together
- Client
- Project Supervisor
- Designer
- Contractor
6Roles of
- Client
- Project Supervisor
- Designer
- Contractor
7Construction Design Management
Early Hazard Identification
Inform Tenderer Major Risks
Inform Operator or Maintenance Agent Residual
Risks
Construction
Design
Tendering
Operation and Maintenance
Avoid Reduce and Control
Contractor Input on Risk Management
8How does CDM work ?
9(No Transcript)
10Key Features
- 1) Input of safety expert at early design stage
- 2) Health Safety (HS) File
- Summary of hazards and impacts, and actions taken
to address them throughout project cycle - Information on potential hazards for maintenance
agent - 3) Pre-tender HS Plan on residual risks
11Benefits
- Identify risks at early stage
- Better forward planning
- More available options
- Facilitate balanced considerations
- Improve buildability and maintainability
12Example 1 Slope works at Upper Firing Range,
Police Training School, Aberdeen
13Example 2
- REDEVELOPMENT OF STAFF QUARTERS AT
- TUEN MUN HOSPITAL
14Site Location Plan
15Protective Barrier with netting at Staircase,
Mid-bay
16Deflection Marker
17Noise Barrier adjacent to Block A
18Dust Depression during Debris Descending
19(No Transcript)
20(No Transcript)
21(No Transcript)
22RB-TMH
Erection of glazed lift is in progress
23Overview of Glazed lift
24(No Transcript)
25Tangible Benefits
- Health and safety improvement
- Cost
- Time
- Quality
26Feedback
27Feedback from project team
- Help the designer to identify health and safety
risk early and address them promptly - Enhance communication among designers, the
contractors and the client - Facilitate early input from contractor to address
and mitigate the hazard
28Areas for Improvement
- Designer / contractor need to be more familiar
with the CDM process - Need more training/implementation guidelines
- Minimize the amount of paperwork
29Concluding Remarks
30 The End
31UKs Requirements
- Thro Enforcement of CDM Regulations
- Place Statutory duties upon
- Clients
- Designers
- Contractors
- Creation of CDM Co-ordinator
- Produce Pre-tender and Construction HS Plan
- Creation of HS File
32What is a HS File ?
- A record of information to pass on from one duty
holder to another for alerting on key HS risks
that need to be taken care or dealt with during
construction, operation and maintenance when
undertaking the duties
33What needs to be included in HS File?
- During Design Stage
- Project description and information
- Site features
- Strategic design criteria and decisions
- Record of HS hazards
- Control measures considered
- During Construction Stage
- General details of construction methods
- Materials used in construction
34What needs to be included in HS File?
- For Operation and maintenance
- Potential hazards and procedures and requirements
for OM - List of equipment and facilities provided
- List of updated records,as-built drawings and
manuals - Location and nature of utilities and services
including emergency and fire fighting systems