Title: Surface Preparation With Garnet Abrasive
1Introduction
2Surface Preparation With Garnet Abrasive
3Garnet is JanuarysBirthstone
4- Almandite Garnet
- Fe3Al2(SiO4)3
-
- SiO2 (Silicon Dioxide) 36
- Al2O3(Aluminum Oxide) 20
- Fe2O3 (Iron Oxides) 32
- MnO,CaO,MgO,TiO2 12
5- Mohs Hardness of 7.5
- Virtually Silica Free (less than 0.5)
- Environmentally and Health Safe
- Specific Gravity of 4.0
- Bulk Density of 140 lbs/ft3
6- Makes 3-4 times higher impact than sand of same
grain size - Use 70 less Abrasive than Slag and Cuts 30-40
faster - Unique Grain Hardness/Toughness reduces breakdown
- Recycles 2-3 times
7- White Metal Finish without Imbedment
- Density plays a Large Role in Performance
- The Goal is to Achieve the Maximum Acceleration
with Heaviest Particle Possible
8- Reduce Air Emissions with Garnet Blast.
9The Garnet Difference
Coal Slag imbedded into metal
White Metal Blast with Garnet
10World Wide Garnet Mine Locations
11Range of Abrasive Selling Prices
12Metering of Garnet Abrasive
Thompson Valve
Thompson Valve II
MicroValve
13Products Applications
- PRODUCT/GRADE GENERIC SIZE SANDBLAST
APPLICATIONS - 16 - Extra Coarse 4 mil profile
- 36 - Coarse 3-4 mil profile
- 30 x 40 Mesh - Intermediate 2.5-3 mil profile
- 30 x 60 Mesh - Medium 2-3 mil profile
- 80 Mesh - Fine 1.5-2 mil profile
- 100 Mesh - Extra Fine 1.0-1.5 mil profile
14New 12 Blast Nozzle
- Increased abrasive velocity
- Increased production
- Reduced labor
- Lightweight/minimize fatigue
- Standard air requirements
- Lower compressor fuel costs
15Cost per Square Foot _at_ 178 sq. ft.SP-10 Blast
with Garnet Abrasive Cleaning Rate of 178 sq. ft.
per hour
- Abrasive at 0.17/lb
- 4 lbs/minute x 0.17 0.68 per minute
- 0.68/3 sq. ft. per minute 0.23 sq. ft.
- Labor at 50 per hour
- 50/178 sq. ft. per hour 0.28 sq. ft.
- Consumables at 50 per hour
- 50/178 sq. ft. per hour 0.28 sq. ft.
- Abrasive Disposal at 25 per ton (.0125/lb)
- 4 lbs/minute divided by 3 sq. ft. per minute
1.33 lbs/sq. ft. - 1.33 lbs sq. ft. x .0125/lb 0.016 sq. ft.
- TOTAL 0.81 sq. ft.
16Cost per Square Foot _at_ 220 sq. ft.SP-10 Blast
with Garnet Abrasive Cleaning Rate of 220 sq. ft.
per hour
- Abrasive at 0.17/lb
- 4 lbs/minute x 0.17 0.68 per minute
- 0.68/3.7 sq. ft. per minute 0.18 sq. ft.
- Labor at 50 per hour
- 50/220 sq. ft. per hour 0.23 sq. ft.
- Consumables at 50 per hour
- 50 hour/220 sq. ft. per hour 0.23 sq. ft.
- Abrasive Disposal at 25 per ton (.0125/lb)
- 4 lbs/minute divided by 3.7 sq. ft. per minute
1.08 lbs/sq. ft. - 1.08 lbs sq. ft. x .0125/lb 0.035 sq. ft.
- TOTAL 0.66 sq. ft.
176319 Brookhill DriveHouston, Texas 77087Phone
713.797.0054Toll Free 800.528.7086Fax
713.797.1014
- Dan Schulse President dans_at_universalminerals.com
- Harry Richmond Vice President harryr_at_universalmine
rals.com - Gary Birdwell Inside Sales garyb_at_universalminerals
.com - Wiley Tew Office/Warehouse Manger wileyt_at_universal
minerals.com