HA Supplier Workshop - PowerPoint PPT Presentation

1 / 32
About This Presentation
Title:

HA Supplier Workshop

Description:

13.00 Introductions aim of the workshop / background Mike Wherrett ... OGM (Note current draft is Tranche 4 Area 10 version) ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 33
Provided by: pubg3
Category:

less

Transcript and Presenter's Notes

Title: HA Supplier Workshop


1
HA / Supplier Workshop Tendering for
Delivering Future MAC contracts
Met Hotel Leeds 19th February 2009
2
Workshop Agenda 13.00 Introductions aim of
the workshop / background Mike
Wherrett 1330 Overview of changes to IfT
Tony Joyce 14.00 Quality Submissions - Jim
Towey 14.45 Questions
3
Tendering for delivering future MAC contracts
  • Why have we invited you here?
  • Recent changes to IfT
  • Purpose behind those changes
  • Guidance

4
Background to changes
  • Varying quality submissions
  • Overemphasis on WHAT vs. HOW
  • Need for consistency of approach
  • Reduction of rework Quality Statement to
    Quality Plan

5
Key Change
  • Quality Statement now structured around the work
    processes described in Annex 24 of the Service
    Information
  • Positive industry consultation

6
Key Messages
  • Different approach called for- focus on
    operational work
  • Need to rethink inputs to Quality Statement
  • More of the same will not suffice
  • It is about approach to operations rather than
    restating strategy

7
Getting the best from today
  • It is crucial that you understand what is being
    asked for
  • Questions welcomed at the end

8
Changes to IfT
  • WhoWhyWhat

9
Quality Submission
  • Still in two separate Parts
  • Part A approach using Annex 24 structure
  • Part B evidence with verifiable statements
  • Evaluation process unchanged

10
(No Transcript)
11
(No Transcript)
12
Part A
  • General Management section
  • First draft of Quality Plan
  • Process flows and activity notes
  • Stage gates and hold points
  • Swim lanes
  • Guidance and examples in IfT

13
Part B
  • Your evidence does not have to be HA specific in
    all sub-process areas
  • It must relate to processes and activities in
    Part A
  • It must be verifiable

14
Page Count (75 pages)
  • General Management Section is excluded from count
    but capped (6 Pages/12 sides)
  • Process flows excluded
  • Activity notes, pictures and diagrams included
  • No change in font size

15
Resource Schedule
  • Usual detailed requirements
  • But
  • no method statements
  • no programmes
  • no risk registers

16
Marking
  • Processes weighted
  • Each Sub-Process marked either weak, acceptable,
    good, excellent as before
  • Attributes used to assess mark (factored)
  • Process Design (40?)
  • Objectives (40?)
  • Quality Policy (20?)

17
Tendering for Delivering Future MAC
contracts
  • 19th February 2009
  • Quality Submissions

18
ANNEX 15 AND MANAGING PERFORMANCE
STRATEGY
WORK
19
MAC Review
Annex 15 from the Service Information
20
Annex 24 of the Service Information
21
Scope of Work
  • Inputs and Outputs (Annex 24)
  • Objectives (Annex 24)
  • OGM (Note current draft is Tranche 4 Area 10
    version)
  • Commercial Management broken down into same
    headings as OGM

22
Weighting
  • ABS, Measure Performance and Continual
    Improvement processes largely developed in OGM
  • Acceptable to adopt / improve but should contain
    at least same coverage

23

Activity
Activity
Activity
HOLD POINT
Activity
STAGE GATE
Activity
Activity
24
Swim lane Process Flows
  • Shows who does what work and in what sequence
    (Annex 24)
  • Enables Continual Improvement (changing the who
    what and when eliminating hand-offs)
  • Avoid multiple lane activities
  • Allows for Hold Points (including self imposed
    stage gates)

25
Activity Notes
Cross reference procedures
Allows HA input/comment
26
  • Quality Policy
  • FAST work cycle times (safely)
  • RIGHT work outputs
  • LEAN cost of work
  • EASY TO DO BUSINESS WITH Agency requirements
    first and foremost

These four need to be marbled in to Processes
27
(No Transcript)
28
Other considerations
  • Becomes first draft of Quality Plan
  • Process Metrics mention if available
  • Owners and Governance in Part 0
  • List of Procedures in Part 0 referenced in
    Activity Notes specified ones (capped page
    count)
  • New Levers in ABS Process
  • Enablers generic and used in other processes

29
What is being looked for in Processes
  • A fit for purpose process design
  • Designed to deliver strategic objectives (Levers)
  • Embrace Quality Policy themes
  • Note Now stand alone Continual Improvement
    Process

30
Process Design
  • Who, what, when and in what sequence
  • Correct activities undertaken compliance with
    HA requirements
  • Appropriate stage gates and hold points
  • Interrelationship with other processes
  • Activity notes explain work and cross reference
    to procedures

31
Strategic Objectives
  • Process addresses appropriate Levers in Annex 15
  • Area specific risks addressed in processes
  • New innovative Levers recognised (identified in
    ABS)

32
Quality Policy
  • Processes display QP theme attributes as
    necessary
  • QP themes not just words but fully reflected
    annotated?
  • Easy to do business with clear expression
    organisational not relationship driven
Write a Comment
User Comments (0)
About PowerShow.com