2
Landfill Mining Process
  • Excavation
  • Use excavator and front end loader to remove
    material.
  • Stockpile in manageable piles
  • Soil Separation (Screening)
  • Trommel or vibrating screens used to separate
    soil from solid waste
  • Size of screen depends on end use of the
    recovered material
  • Processing
  • Daily cover
  • MRF
  • MWC

3
Landfill Mining
4
Project Planning
  • Conduct Site Characterization Study
  • Geological features stability of surrounding
    area proximity of ground water estimate
    fractions of usable soil, recyclable material,
    combustible waste and hazardous waste.
  • Assess potential economic benefits
  • Increased disposal capacity
  • Avoid landfill closure, post-closure care and
    monitoring, purchase of additional capacity,
    liability for remediation of surrounding areas.
  • Revenues recyclable and reusable materials,
    combustible waste sold as fuel, reclaimed soil
    used as cover soil or construction fill material

5
Project Planning Contd
  • Investigate regulatory requirements
  • Not restricted under current federal regulations
  • Some states have enacted general provisions
    concerning the beneficial use of recovered
    materials
  • Availability of grant money
  • Develop a preliminary worker health and safety
    plan
  • Account for safety risks the project will pose on
    workers
  • Prior to starting operation, must train workers
    on safety and emergency response procedures

6
Project Planning Contd
  • Assess Project Costs
  • Capital Costs
  • Site preparation, purchase or rental of safety
    and reclamation equipment, construction or
    expansion of MRF
  • Operational Costs
  • Labor, equipment fuel and maintenance,
    landfilling non-reclaimed waste or
    non-combustible fly and bottom ash,
    administrative and regulatory compliance
    expenses, hauling costs

7
Landfill Mining - Advantages
  • Extend Landfill Capacity
  • Extends the life of the landfill by reducing
    waste volume through recovery, combustion, and
    compaction
  • Generate Revenue
  • Recyclable Fraction
  • Soil Fraction
  • Energy Production
  • Mix combustible reclaimed waste with fresh waste
    and burn in a Municipal Waste Combustor (MWC) to
    produce energy

8
Advantages Contd
  • Reduce Landfill Closure Costs
  • By reducing the landfill size, facility operator
    can lower the cost of closing the landfill or
    making landfill available for other uses.
  • Retrofit Liners and Remove Hazardous Wastes
  • Liners and leachate collection systems can be
    installed in older landfills
  • If already installed, these systems can be
    inspected
  • Opportunity to find and properly dispose of
    hazardous wastes

9
Landfill Mining - Disadvantages
  • Managing Hazardous Materials
  • Safety issues
  • Controlling Release of Landfill Gas and Odors
  • Controlling Subsidence or Collapse
  • Adjacent cell may sink or collapse into excavated
    area
  • Increase wear on excavation and MWC Equipment

10
The Sustainable Landfill Process
Cell Filling
Aerobic Treatment
Landfill Mining and Recycling
Reuse of Landfill Space
Repeat Process
11
Sustainable Landfill
Write a Comment
User Comments (0)
About PowerShow.com