Newmarket Community Meeting - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Newmarket Community Meeting

Description:

Route 55/55A/55B - Davis Drive A new branch of the route is 55B. ... Markham Link From Markham Centre (Warden Avenue and Highway 7) to Steeles ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 11
Provided by: Inte45
Category:

less

Transcript and Presenter's Notes

Title: Newmarket Community Meeting


1
Newmarket Community Meeting
  • September 21, 2004

2
Agenda
  • 2004 Service Changes (September)
  • 2005 Service Plan
  • System Performance
  • Local Solutions
  • Rapid Transit

3
2004 Service Changes (On road September 5)
  • Route 54 - Bayview North  This NEW
    Monday-to-Saturday all-day service route operates
    in Newmarket between Davis Drive at Southlake
    Regional Health Centre and Stone Road along
    Bayview Avenue.
  • Route 55/55A/55B - Davis Drive  A new branch of
    the route is 55B. This NEW Monday-to-Saturday
    all-day service, operates between the Newmarket
    GO Bus Terminal and the 404 Town Plaza. The 55B
    branch services the Huron Heights and Leslie
    Valley Drive area replacing the discontinued
    Route 33.
  • Route 57/57A - Mulock  Extended service into
    Sawmill Valley Drive and Stonehaven Rd. The 57A
    branch of this route operates between the
    Newmarket GO Bus Terminal and Stonehaven/Leslie
    St. area via Mulock Dr.
  • Route 58 - Leslie North  This NEW
    Monday-to-Saturday all-day route offers local
    service between Sharon and Stonehaven Road in
    Newmarket. This service replaces the former Route
    55A and 57 Sharon service.

4
2005 Service Plan
  • Newmarket Service Area Objectives
  • Streamline local routes to connect with future
    rapid transit in the Yonge St. corridor
  • Simplify and straighten the local routes
  • Maintain service coverage in the residential
    areas
  • Standardize peak and off-peak routings
  • Connect to other YRT and GO services
  • Service new development

5

2005 Service Plan continued
  • Proposal Details
  • Operate on main arterial roads (e.g. Rt. 57
    Mulock Rd)
  • Operate on local collector roads (e.g. Rt. 56
    Gorham-Eagle)
  • Operate local GO Shuttles to connect to the
    Newmarket and Green Lane GO Stations
  • Operate school trips to service high school
    students
  • Operate Newmarket Community Bus and/or Dial-a-Bus
    with a small low floor bus in the central core on
    a fixed schedule
  • Focus on local destinations

6
System Performance
7
Local Solutions
  • Demand Responsive
  • YRT staff investigating options based on current
    ridership and latest on/off counts
  • Community Bus
  • Integration of Mobility Plus and conventional
    services (Spring 2005)
  • Smaller Vehicles
  • YRT staff identifying candidate routes based on
    current ridership

8
Rapid Transit Quick Start Phase
  • Frequent, high-speed, all-day service
  • Infrastructure elements  stops, stations,
    roadway improvements
  • Advanced rapid transit vehicles
  • Intelligent transportation system applications

9
Rapid Transit continued
  • 4 designated corridors
  • Yonge Street Steeles Avenue to Davis Drive in
    Newmarket
  • Highway 7 Across the Region from the Peel
    boundary to the Durham boundary
  • Vaughan Link From the Vaughan Corporate Centre
    (Jane Street and Highway 7) to York University
    and a connection to Torontos route to Downsview
    Station
  • Markham Link From Markham Centre (Warden Avenue
    and Highway 7) to Steeles Avenue connecting with
    Torontos route to Don Mills Station

10
Questions?
Write a Comment
User Comments (0)
About PowerShow.com