Welcome to - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Welcome to

Description:

Gunnar Wold. WP-3 coordinator. WP3-Workshop on inspection programmes and techniques. ... Coordinator: Gunnar Wold. Assistant Coordinator: Noel Toledo ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 9
Provided by: ema6
Category:
Tags: welcome | wold

less

Transcript and Presenter's Notes

Title: Welcome to


1
  • Welcome to
  • WP3-Workshop on inspection programmes and
    techniques.
  • London 22.03.07
  • Gunnar Wold
  • WP-3 coordinator

2
  • WP3-Workshop on inspection programmes and
    techniques.
  • EMARS-main objective
  • To ensure a basic level of best Practice
    techniques and cross sharing of information and
    expertise in market surveillance.
  • Main issues
  • Share experiences and expertise regarding market
    surveillance
  • Together identify and document best practice
    techniques
  • Establish guidelines/handbook to promote a best
    common practice in market surveillance activities
  • Establish recommendations for educational
    requirements and training programmes for market
    surveillance officers.
  • To establish and test best practice for risk
    assessment for consumer products

3
  • Work Package 3-inspection programmes and
    techniques
  • WP 3 team
  • Coordinator Gunnar Wold
  • Assistant Coordinator Noel Toledo
  • Specific Coordinator for joint market
    surveillance programmes Marijn Colijn
  • Consultants Fabio Gargantini, Torben Rahbek
    and Jan-Willem-Weijland

4
Main deliveries for WP 3
  • Identification of joint market surveillance
    projects to help identify together best practices
    in market surveillance.
  • Report on Market Surveillance best practice
  • Formulation of a Handbook on Best Practice
    Techniques in Market Surveillance
  • Identification of training needs and
    recommendations on how training programmes may be
    organized for market surveillance inspectors,
    including specific use of screening equipment
    needed.

5
What has been done up till now?
  • Secretariat for the whole project has been
    established by June 2006,EFTA, Brussels.
    Preparative work comprehensive, completed by end
    2006.
  • Specific WP3 questionnaire was distributed
    amongst all PROSAFE members.Information analyzed.
    Experiences to be included in the draft handbook.
    Draft analysis presented in Brussels end Nov.
    2006
  • Draft inventory of handbook developed by end
    January 2007.
  • Identification Coordination with two joint
    projects for 2007
  • The Cord-Extension Sets Project by the LVD-ADCO
  • The Cigarette-lighters Project by the GPSD
    Committee

6
Purpose of workshop
  • Preparatory work is completed, and it is time to
    involve all participants in the further work in
    order to achieve objectives and to be able to
    deliver as planned
  • Present market surveillance plans and discuss
    possible cross border market surveillance
    activities
  • Be acquainted with the draft inventory of
    handbook in order to give comments to the content
    and possibly utilize the information in relation
    with market surveillance activities
  • Identification and discussion of basic and
    common training needs and best practices for
    market surveillance officers involved in various
    consumer product sectors.
  • Presentation of ongoing market surveillance
    projects-coordination with EMARS WP 3.

7
How can we participate more . . .
  • 2007
  • Further coordination and sharing of experiences
    with the GPSD NETWORK and ADCO Groups, in
    particular, LVD-ADCO, TOY-ADCO and PPE-ADCO.
  • Through possible joint projects in 2007 and/or
  • Through cross-feedback/interaction at Member
    State level.
  • Comments / suggestions on the Guide to Best
    Practice in market surveillance
  • 2008
  • A high participation level in the Spring
    Workshop which will launch the first draft of the
    Guide.
  • Active feedback within stipulated time-frame so
    as to finalise the Guide on time
  • Participation in Final Conference in Autumn 2008
    Launching of the Guide.

8
For further information on Work Package 3
details Mr. Gunnar Wold, WP3 Coordinator Email
Gunnar.Wold_at_dsb.no OR Mr. Noel Toledo, WP3
Assistant Coordinator Email noel.toledo_at_gov.mt
Thank You
Write a Comment
User Comments (0)
About PowerShow.com