Statewide Local Streets - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Statewide Local Streets

Description:

To determine how much is needed to maintain local streets & roads statewide. Other Assets ... RTPA. RCTF. Questions? Contact: Margot Yapp, P.E. ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 26
Provided by: MelissaH3
Category:

less

Transcript and Presenter's Notes

Title: Statewide Local Streets


1
Statewide Local Streets Roads Needs Assessment
Progress UpdateMTC PTACSeptember 15, 2008
2
What is This Study About?
  • To determine how much is needed to maintain
    local streets roads statewide

?
3
Other Assets
  • Sidewalks
  • ADA ramps
  • Curb gutter
  • Storm drains
  • Others

4
How Much Do We Need?
To improve conditions

To maintain conditions
5
Responses by Agency
  • 406 responses
  • 130 have not responded
  • 23 have popn gt 50,000
  • 34 have gt 100 miles
  • See list of missing agencies

No responses 191
344 responses (64)
6
Responses by Mileage
  • 91 total miles
  • LA (6500 miles)
  • Hidden Hills (0.3 miles)
  • 9 no response
  • 34 agencies gt100 miles
  • Plumas Co (696 miles)
  • Canyon Lake (2.2 miles)

29 no data
71 data recd
7
Responses by Population
  • 91 of popn
  • LA (4 million)
  • Vernon (95)
  • Remaining 9
  • 18 popn gt 50,000
  • Oxnard (193k)
  • Sand City (301)

19 no data
81 data recd
8
Responses Received
County Miles Plumas 0 San Benito
0 Mono 6 San Bernardino
64 Ventura 66 Tulare 78
9
Required Sample Size
10
Are Data Representative?
11
Preliminary Results
12
380 Survey Responses
  • Software
  • 158 use StreetSaver (MTC)
  • 80 use MicroPAVER
  • Pavements
  • 97 had inventory information
  • 93 reported needs
  • Non-pavements
  • 72 had data
  • Only 54 had funding information

13
Straightforward Co. (Amador)
Agency
Miles
Avg. Condition
Needs (-Millions)
5 Yr.
25 Yr.
County
410
26
82.8
146.8
Amador
2.9
75
2.5
5.0
Ione
14.1
75
4.0
8.0
Jackson
22
50
3.0
10.0
Plymouth
7
57
2.5
5.1
Sutter Creek
19.8
50
6.0
10.0
14
Challenging Co. (Butte)
Agency
Miles
Avg. Condition
5 Yr. Needs (M)
25 Yr. Needs (M)
1,310
76
35
140
County
22
59
1.2
6.6
Biggs
242.2
59
8.8
81.6
Chico
34.8
59
3.5
12.8
Gridley
7
59
3.2
16.8
Oroville
19.8
59
4.2
22
Paradise
15
Pavement Needs (Butte Co.)
Agency
5 Yr. Needs (M)
Revenue (M)
Shortfall (M)
County
35.0
53.5
--
Biggs
1.2
1.0
0.2
Chico
8.8
46.8
--
Gridley
3.5
1.4
2.1
Oroville
3.2
4.3
--
Paradise
4.2
5.6
--
16
Needs Analyses
17
Pavement Condition Goals
100
70
50
25
0
18
Needs Analyses
  • Depends on the condition goal
  • Best Management Practice low 80s
  • MTC 75 to BMP
  • OCTA 85
  • MTA 62 or 70
  • Two philosophies
  • Implement one statewide standard
  • Let each agency determine goal

19
One Statewide Goal
  • PROS
  • Consistent standard
  • Easy to compare agency to agency
  • CONS
  • One standard may not reflect agencys needs
  • County vs. city roads
  • Perception of forcing standard onto an agency

20
Let Each Agency Decide Goal
  • PROS
  • Agency decides what is most appropriate for them
  • 536 countries united by a common currency
  • CONS
  • Difficult to compare statewide
  • Needs assessment will fluctuate when goals change
  • Leads to inequities
  • Divide between have and have-nots persist

21
Decisions
  • What philosophy should we use?
  • If one statewide goal, what should that be?
  • Use best management practices as the statewide
    goal

22
Analysis Period
  • Two factors to consider
  • How far do we look into the future?
  • How long to achieve the goal?
  • How far?
  • SB 8 and SHOPP 10 years
  • Regional Transportation Plans 25 years

23
How Long to Reach Goal?
Cumulative Total Needs ()
5
10
Time (Years)
25
24
DECISION
  • What analysis period should be used?
  • Use 25 year analysis period achieve goal within
    5-10 years

25
Questions?
  • Contact
  • Margot Yapp, P.E.
  • myapp_at_nce.reno.nv.us
  • (510) 215-3620
Write a Comment
User Comments (0)
About PowerShow.com