UNLOCKING THE SECRETS  Basic Understanding of
Construction Documents for Biosafety
Professionals
2
agenda
  • THE DESIGN PROCESS
  • KEY ISSUES
  • Room Construction
  • Directional Airflow
  • Redundancy
  • Drawing Overview
  • Architectural
  • HV AC
  • SUMMARY

3
  • DESIGN PROCESS

4
design process
  • SCHEMATIC DESIGN
  • Establish Basic Concepts and Relationships
    Exterior and Interior
  • Minimum Performance standards

5
design process
  • DESIGN DEVELOPMENT
  • Scope and intent defined
  • Final relationships defined

6
design process
  • CONSTRUCTION DRAWINGS
  • Details and intent for all requirements
  • Commissioning

7
  • KEY ISSUES

8
key issues
  • HOW SEALED IS SEALED?
  • BSL-3
  • Monolithic surfaces with sealed penetrations
  • Smoke flow tests
  • WHY IS IT SEALED?
  • Performance standard achieved
  • In order to effectively decontaminate room

9
key issues
  • Penetration sealing
  • Room pressure/leak testing
  • Door hardware, sweeps, seals
  • Service penetrations

10
directional airflow
  • Directional Airflow
  • Provides Zone Control of hazards and odors

Air flow from lowest to highest hazard
11
key issues
12
key issues
N Can Equal
2 at 50
3 at 33
N1 Can Equal
2 at 100
3 at 50
2N Can Equal
2 at 100
4 at 50
13
  • DRAWING OVERVIEW

14
drawing overview
  • General Observations
  • Drawings are diagrammatic
  • Dimensioned work is more accurate
  • Specifications typically trump drawings
  • Review all relevant documents
  • Drawings
  • Specifications
  • Basis of Design?

15
drawing overview
Floor Plans
16
drawing overview
17
drawing details floor plan
  • Room Elevations
  • Equipment
  • Sink
  • Gases Services
  • Relationships

18
drawing details reflected ceiling
  • Ceiling Construction
  • Ceiling Height
  • Air Devices
  • Light Fixtures

19
drawing details details
  • PENETRATION SEALING
  • Look at General Notes
  • Look at Key Notes
  • Look at Specifications
  • Look at Partition Schedules

20
drawing details HVAC
21
drawing details HVAC
  • Relevant Information Outside Of Room
  • Air Valves
  • Air Systems

22
drawing details HVAC
  • Connection to BSC
  • Note Airflow
  • Exhaust ductwork construction
  • May be on drawings
  • May be in specifications

23
drawing details HVAC
  • Supply diffuser
  • Location
  • Airflow
  • Temperature Sensor
  • Differential Pressure Sensor
  • Different methods for indicating

24
drawing details HVAC
  • Equipment
  • Location
  • Redundancy

25
drawing details air balance
  • Look at airflow offset (if basis of design)
  • Air has to be made up from somewhere

26
drawing details air balance
  • Balance each room for 0 CFM
  • (3) Rooms at 250 CFM negative
  • Corridor 200 CFM exhaust
  • Corridor 250 CFM negative to outside corridor
  • Makeup Air -750 -200 250 700 CFM
    Supply

27
drawing details controls
28
drawing details controls
  • CONTROL INTERLOCKS
  • Speed dependent of control traffic
  • Logic dependent
  • HARDWIRED INTERLOCKS
  • Very fast response
  • Independent of controls network
  • Recommended
  • System status,
  • High/low pressures,
  • Damper interlocks

29
  • SUMMARY

30
summary
  • Review the drawings
  • Ask questions
  • Do you understand the drawings?
  • Do the drawings define boundary sealing,
    directional airflow, proper containment, safe and
    consistent operation?
  • Do you and the design professional have the same
    understanding?
  • Dont Assume