global_CMT10.03 running, and global_CMT10.20 status - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

global_CMT10.03 running, and global_CMT10.20 status

Description:

Elizabeth Gallas FNAL CD. For the Trigger Meisters: Terry Toole,Tom Diehl,Elizabeth Gallas ... Cable check ? If all other things above ready: Default L2 Cal ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 6
Provided by: d0serve
Category:

less

Transcript and Presenter's Notes

Title: global_CMT10.03 running, and global_CMT10.20 status


1
global_CMT-10.03 running,and global_CMT-10.20
status
  • Elizabeth Gallas FNAL CD
  • For the Trigger Meisters
  • Terry Toole,Tom Diehl,Elizabeth Gallas
  • TriggerMeister Home Page
  • http//www-d0.fnal.gov/trigger_meister/private/www
    /

Trigger Board Meeting February 25, 2003
2
global_CMT-10.03
3
global_CMT-10.20
  • Online/Trigger changes/questions
  • L2 muon
  • L2Muon SLIC code upgrade ready
  • Christos efficiencies from special run
  • L1 Calorimeter (?gt3.2 (was 2.4))
  • L1 Cal examine ready to go
  • L1 Cal readout vs precision readout ?
  • Is this only related to extended eta ?
  • Level 2 Cal
  • Cable check ?
  • If all other things above ready
  • Default L2 Cal pp parameter change

4
global_CMT-10.20
  • Trigger List changes (overview)
  • New Level 3 muon filters
  • _MM (L3 muon with central match)
  • _L3L15 (L3 muon with ptgt15 GeV)
  • 2MUW_A_2L2_L3L7 (a NP request)
  • Fill available bandwidth with single ? - Suite
    of 12 triggers
  • MU(W)_(A,W)_L2M5_(TRK10,L3L15)
  • Level 1 muon
  • remove Afastz from nearly all muon triggers
  • Correction to 2MT1_C_2L2_2TRK (B)
  • 2ETAPHISEP(0,2,3,6,MU_Loose,MU_Loose)

5
Looking ahead
  • D? Run plan
  • Expect 10.20 to be ONLINE
  • Thursday 27-Feb-2003 evening shift
  • Rate caps (for next 2-4 weeks)
  • L1 Accept rate Cap 1100 Hz
  • L2 Accept rate Cap 600 Hz
  • L3 Accept rate Cap 50 Hz
  • Our goal is not to saturate all trigger levels
    bandwidth, rather maximize amount of good data
    DD
  • In the wings
  • Calorimeter Unsuppressed trigger
  • Change to Higgs trigger 3JT15
  • L3ALL Level 3 Script triggers
  • Remove for 3CJT5 ?
  • Keep for L1 CTT triggers ?
  • Laurents Higgs request ?
Write a Comment
User Comments (0)
About PowerShow.com