94 LVPS Packages mounted 425 from the frontend electronics. - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

94 LVPS Packages mounted 425 from the frontend electronics.

Description:

94 LVPS Packages mounted 4'-25' from the front-end electronics. 4 modules per package. ... Finish cable installation in the 2 week shutdown ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 11
Provided by: die82
Category:

less

Transcript and Presenter's Notes

Title: 94 LVPS Packages mounted 425 from the frontend electronics.


1
PDT Low Voltage P.S.
  • 94 LVPS Packages mounted 4-25 from the
    front-end electronics.
  • 4 modules per package.
  • 5V -5V Digital, 5V -5V Analog 18
    A 1A 18A 18Amps

2
LVPS Connections
3
LVPS Testing
  • Procedure (on d0mino) /RunII/home/room2/diehl/muo
    nup/1999/lvps_test.txt
  • Disconnect front-end electronics from Renwa card
  • Check wires connections at both ends
  • Measure load internal resistance
  • Power up with a simulated load adjust voltages
    to read proper voltage output
  • Reconnect electronics with FEB cards
  • Typical malfunctions (Alonso G.)
  • Loose wires
  • 60
  • Wrong connections in wiring-esp. sense leads
  • 40
  • Bad power supplies
  • 9 of 88 Power supplies
  • Bad soldering on the lead wires of the power
    supplies
  • 5 of 88 Power supplies

4
LVPS Status
  • Total 94 Supplies
  • Installed 90 (not yet 105, 106, 145,146)
  • Completely Connected 78 (many in the A-layer
    dont have a power trunk yet).
  • Operating 66 (Bottom B C-layer not operating,
    incomplete electronics)
  • Power Supply Operation
  • A couple modules have been replaced. In
    retrospect, the problems have likely been related
    to the modules A.C. connections, rather than to
    component failure.
  • Plan to Finish
  • Install 4 remaining LVPS after EFs are closed.
  • Victor M. has material to make long power trunks.
    Install in 2-wk shutdown.

5
PDT High Voltage
  • 94 PDTs each have two H.V. inputs.
  • Operating Voltage
  • On mini-pdt (small length)
  • Wire 4.65 kv Pad 2.3 kv
  • On the real thing (not finalized?)
  • Wire 4.7 kv Pad 2.3 kv
  • Status of MCH2
  • 2 Crates, 47 pods
  • All pods installed
  • All pods have been
  • operated
  • Pods not tested for
  • extended periods

6
PDT Business End
  • Service Cards
  • 3 Types
  • Recently purchased spares for A-layer
  • Now have sufficient spares of all kinds.

7
HV On Detector
  • POD to PDT Map
  • Sensible division of PDTs to Pods
  • Averages 2 PDTs per pod
  • Large A-layer PDTs each have own pods
  • Bottom A-layer PDTs ganged 3/pod
  • Quiet Bottom C-layer PDTs ganged 4/pod
  • See file http//wwwd0.fnal.gov/hardware/upgrade/mu
    on_upgrade/Image3.gif
  • Tested recently to make sure pod matched the
    appropriate Reynolds output.
  • 6 PDTs (BC-layer top east, octant 1) have been
    operated on a couple of gasses since last summer.

8
HV Pod Map
9
HV On Detector
  • 70 (-3) PDTs are connected to HV pods.
  • 3 PDTs (243, 135, 141) are disconnected because
    of broken wires.
  • 67 PDTs OK at 200V on wire and pad
  • 36 PDTs have been brought up to full voltage.
  • Plan
  • Upon gas flow bring the PDTs to full voltage.
    Measure/track beam-off currents.
  • Finish cable installation in the 2 week shutdown
  • Repair/jumper cells with broken wires on access

10
Summary
  • LVPS
  • 90/94ths installed
  • 66/94ths operating
  • No evidence of LVPS pod failure
  • Finish during the 2 wk shutdown.
  • High Voltage System
  • Infrastructure MCH2 complete
  • 67/94ths ready to be brought up to full voltage
    once gas is flowing.
  • Finish during the 2 wk shutdown.