Utility systems could not support future building growth. Utility infrastructure was obsolete and inefficient. ... Stop burning coal. ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 40
Provided by: Bar7172
Category:

less

Transcript and Presenter's Notes

Title: Presentation to University Council August 28, 2006


1
Presentation to University CouncilAugust 28, 2006
Utility Systems Upgrade
  • Washington University
  • Facilities Planning Management

2
Situation in 1992
  • Utility systems could not support future building
    growth.
  • Utility infrastructure was obsolete and
    inefficient.
  • Central steam plant was coal fired, labor
    intensive and environmentally unfriendly.
  • Steam losses exceeded steam loads during summer
    operation (D).
  • Electrical capacity was near its limit.
  • Electrical distribution was unreliable.
  • Many buildings were not air conditioned (D).

3
Objectives
  • Increase the reliability and capacity of the
    utility systems.
  • Update the systems technology.
  • Reduce energy consumption and operating cost.
  • Environmentally friendly.
  • Accomplish changes with least disruption and cost.

4
Historical Building Growth
Maximum 5,800,000 Sq. Ft. (Anticipated Year 2014)

5
Historical Building Growth

6
Recent Future Building Growth
Anticipated Campus Maximum
22
53
7
Recent Building Growth
51
8
Plan
  • Energy conservation and reduce operating cost.
  • Air condition all buildings (D).
  • Shut down central steam plant in summer (D).
  • Stop burning coal.
  • Replace single high pressure steam plant with
    distributed low pressure plants located near
    loads (D).
  • Install computer based campus energy management
    system.
  • Increase electrical capacity and improve
    reliability.
  • Design for maximum flexibility and future growth.

9
Utility Projects Capital Spending
Overall Total 138.8MM
10
Execution - Past Projects at Danforth Campus
11
Execution - Past Projects at Danforth Campus
12
Execution - Current Projects at Danforth Campus
13
Execution - Future Projects at Danforth Campus
14
Execution - Past Projects at Medical Campus
15
Execution - Past Projects at Medical Campus
16
Execution - Past Projects at Medical Campus
17
Execution - Current Projects at Medical Campus
18
Execution - Future Projects at Medical Campus
19
Natural Gas Situation
20
January 2007 NG Futures Price (4/04 Current)
21
Natural Gas Load Profile Danforth Campus
22
Natural Gas Load Profile South 40
23
Natural Gas Monthly Usage Danforth Campus
24
Natural Gas Usage Danforth Campus
Net Building Area
4,437 HDD
4,005 HDD
4,123 HDD
4,090 HDD
4,127 HDD
25
Natural Gas Usage Medical Campus
Net Building Area
4,437 HDD
4,005 HDD
4,123 HDD
4,090 HDD
4,127 HDD
26
Natural Gas Unit Cost
.1.00
.352
.582
.559
.597
.606
.727
.684
.904
.333
27
Total Natural Gas Cost
1,270,821
2,293,075
2,092,845
4,462,266
2,392,532
4,505,297
2,954,444
4,927,082
4,100,299
6,678,486
28
Electrical Energy Profile Danforth Campus
29
Electrical Demand Profile Danforth Campus
30
Electrical Usage Danforth Campus
Net Building Area
1,707 CDD
1,534 CDD
1,741 CDD
1,833 CDD
1,683 CDD
31
Electrical Usage Medical Campus
Net Building Area
1,707 CDD
1,683 CDD
1,741 CDD
1,534 CDD
1,833 CDD
32
Electrical Overall Unit Cost
.043
.049
.041
.045
.039
.046
.038
.044
.038
.044
33
Total Electrical Cost
4,197,475
7,358,007
4,305,451
6,778,195
6,550,343
4,229,870
4,275,346
6,542,020
4,386,394
6,555,626
34
Overall Energy Usage Danforth CampusVs.Peer
Institutions
CAPPA Region Average (190.8 MMBTU per 1,000 GSF)
35
Overall Energy Usage Medical CampusVs.FY92
Usage
Medical Campus FY1992 (702 MMBTU per 1,000 GSF)
36
Cost Control Strategies
  • Minimize energy usage to maximum extent.
  • Pursue justifiable energy conservation projects.
  • Utilize financial instruments for purchasing
    energy.
  • Keep manpower at minimum levels.

37
Energy Conservation Methods
  • Use of energy efficient lights (T8) and high
    efficiency ballasts (Green Lights Program).
  • Design for 2 watts/ft2 maximum interior lighting.
  • Design for 20 btuh/ft2 maximum interior cooling
    and 15 btu/ft2 maximum interior heating loads.
  • Use of energy efficient motors for fans and
    pumps.
  • Use of variable speed drives on fans, pumps and
    chillers to match motor speed to the load.
  • Use of cooling tower fan staging and/or variable
    speed fans to achieve condenser water temperature
    setpoints with minimum fan energy.
  • Automatically lower condenser water temperature
    setpoints during winter, to improve chiller
    efficiencies.
  • Operate minimum number of loop chillers to
    maintain maximum 50 F loop temperature, thus
    minimizing electrical consumption.
  • Use of outside air/exhaust air heat recovery
    (glycol run around and heat wheels) to
    pre-condition ventilation air.
  • Use of photocells and timers on street lighting
    to automatically turn lights off during daylight
    hours.
  • Decentralization of main Power Plant boilers and
    conversion to low-pressure steam, to improve
    thermal efficiencies.
  • Boiler conversion from coal fired to high
    efficiency gas fired boilers.
  • Summer shut-down of main Power Plant to reduce
    gas consumption.
  • Use of minimum ventilation air for labs and
    offices.
  • Use of 60-fpm fume hoods, in lieu of 100-fpm fume
    hoods, which lowers ventilation air heating and
    cooling loads.
  • Use of CO2 demand ventilation in large assembly
    spaces.
  • Use of low-e glass and shading devices to
    minimize solar loads.
  • Clean boiler and chiller tubes annually.
  • Water treatment program to minimize scale on
    boiler and chiller tubes. 

38
Challenges Moving Forward
  • Increasing capacity demands.
  • Increasing reliability demands.
  • Aging infrastructure.
  • Rising utility costs, particularly natural gas.
  • Stricter environmental compliance.
  • Limited manpower.

39
Results Conclusions
  • Through major building growth period, utility
    usage has remained essentially flat over last few
    years primarily due to cost reduction measures,
    updated technologies and improved efficiencies.
  • Capacity has kept up with demand.
  • Reliability has improved and will continue to
    improve as further upgrades are implemented.
  • Continued utility investment will be needed to
    keep up with future building growth, to keep
    costs at a minimum and to provide reliable energy
    sources to the University.