Title: PE Discovery approach
1WLR3 Product Establishment The process explained
Issued 1st December 2008 Issued by Openreach
CIO Customer Engagement Version 4.0
2Contents
- Overview
- Product Establishment At A Glance
- Operational Readiness Testing
- Product Establishment The Big Picture
- Acronym Guide
3Overview
- Wholesale Line Rental 3 (WLR3) is a high value
product portfolio that is exclusively available
over the Equivalence Management Platform (EMP).
As its name implies, the EMP provides every
Openreach customer with equal access to WLR3
Analogue, WLR3 ISDN30 and, soon, WLR3 ISDN2 as
well - To gain EMP access and start selling WLR3
products, you will need an interface thats
compatible with Openreachs B2B gateway hence
the need for Product Establishment (PE) - These slides explain the process of achieving the
required compatibility. They are intended to
guide CPs who have already registered an interest
in becoming a WLR3 customer. If you would like to
do the same - ...Please contact the Openreach Customer
Reception Team on 0800 917 0371 - ...Or speak to your Openreach Customer
Business Manager - ...Or email customer.establishment_at_openreach.
co.uk
4Product Establishment At A Glance
Phase 4 Transition
Phase 1a Set-up
Phase 1b Connectivity Test
Phase 2 Functionality Test
Phase 3 Launch
Phase 0a Registration
Phase 0b Enrolment
- Phase 0 Registration Enrolment
- 0aRegistration is required for you to register
interest in WLR3 with Openreach, to fully
understand whats involved at every stage of PE
and to ensure all contracts are in place.
Relevant documentation will be made available to
you - 0b Milestone planning for your PE journey
through to Transition - Phase 1 Setup Connectivity Testing
- 1a Set up focuses on building you on the
Equivalent Management Platform (EMP) components
and planning the later Functionality Test, Launch
and Transition Phases - 1b Tests your firewall access and digital
certificates and validates your XML schema
against the environment known as Onramp - Phase 2 Functionality test
- We set you up on the CVF test environment. You
then perform various test scenarios and together
we resolve any issues resulting from these
scenarios. If you are going with a proven Third
Party Integrator (TPI) solution, youll be able
to skip this phase altogether. The Openreach
Customer Reception Team will be happy to verify
whether or not your preferred TPI solution is
proven. If youre connecting using your own
solution either as a TPI or a Communications
Provider this phase is mandatory - Phase 3 Launch
- Live Verification (Proving) Placing
straightforward orders through the EMP, which are
cancelled before completion - Live Verification (Trial) Placing low numbers of
straightforward live orders through the EMP - Ramp Up Placing increasing numbers of live and
more complex orders through the EMP - Phase 4 Transition
- If you have existing lines on WLR2 this Phase is
required to Transition (CP1 to CP1 migration)
these lines to WLR3. - Handover to (Business As Usual) BAU.
- You are now a fully-fledged WLR3 provider.
5Operational Readiness Testing
- Operational Readiness Testing (ORT) is a series
of gateway checks we make to ensure that you are
ready and able to proceed through the various
phases of PE meeting the minimum criteria
required by Openreach as you go and
subsequently become a Business as Usual WLR3 CP - There are 6 ORT Gateways (ORT0 ORT5) at
different points through the PE process
6Product Establishment The Big Picture
2
3
5
0
1
4
Phase 1a Setup
Phase 1b Connectivity Testing
Phase 2 Functionality Testing
Phase 3 Launch
Phase 0a Registration
Phase 0b Enrolment
Phase 4 Transition
1.6 Digital Certificate, Firewall Collaborative
Protocol Agreement (CPA) Process
0.9 Milestone Planning start ORT 0 Assesment
0.1 Product Education
1.1 We build you on EMP Components
2.1 Setup Connectivity to Test Environment
4.1 Closure of WLR2 Gateway (SPG)
3.1 Live Verification (Proving)
4.2 Generate Line Inventory
3.2 Live Verification (Trial)
0.10 ORT 0 Successfully Completed
0.2 Sign NDA
1.2 You Receive Generic Test Pack
2.2 Test Pack Plan Issued Agreed
0.3 Complete Registration Questionnaire
1.7 Onramp setup, Test CPA, ebXML Payload Schema
4.3 Review of your Line Inventory
3.3 Ramp Up
0.11 Start Date Agreed For Phase 1
2.3 Test Execution Support
1.3 Test Planning
0.4 Complete CRD
1.4 Launch planning commences
3.4 Confirm Detailed Transition Plan
2.4 Issue Resolution
4.4 Pre-transition load
0.5 Credit Check (new clients)
2.5 Resubmit Tests
1.5 Transition planning commences
4.5 Transition execution
0.6 Account Mgt Choice (new clients)
2.6 Resolve Manual Intervention
4.6 Post-transition support
0.7 Sign WLR 3 Contract and Order Fault Tracker
2.7 Test Pack Reviews
- Phase 2 Functionality Test is not required for
CPs establishing via a proven TPI solution. -
Only existing WLR2 CPs will require to complete
Phase 4 Transition
2.8 OFF (Customer Verification Facility) CVF
4.7 - Hand over to BAU
0.8 Admin Setup
7Phase 0 Administrative Activities High Level
Planning
Cont. on next slide
8Phase 0 Administrative Activities High Level
Planning
9Phase 0 Administrative Activities High Level
Planning
10ORT 0 Criteria Readiness to enter Product
Establishment
11Phase 1a EMP Setup and Product Establishment
Planning
12Phase 1b Focus on Connectivity
13ORT 1 Criteria Readiness to enter Functionality
Test
Note If youre using a proven TPI solution, you
can skip Phase 2 Functionality Testing and
proceed to ORT 2 immediately after Phase 1b
Connectivity Testing
14Phase 2 Testing the functionality of your WLR3
solution
You can skip this phase entirely if youre using
a proven TPI solution
15Phase 2 Testing the functionality of your WLR3
solution
Remember, if youre going with a proven TPI
solution you can skip this phase altogether
16ORT 2 Criteria Readiness to enter Launch
17Phase 3 Understanding and proving Live WLR3
operation
18Phase 3 Understanding and proving Live WLR3
operation
Cont. on next slide
19Phase 3 Understanding and proving Live WLR3
operation
20ORT 3 Criteria Readiness to enter Ramp-up
21Phase 3 Understanding and proving Live WLR3
operation
22Phase 3 Understanding and proving Live WLR3
operation
Cont. on next slide
23ORT 4 Criteria Readiness to enter Transition
24Phase 4 The transition of your WLR2 base to WLR3
25Phase 4 The transition of your WLR2 base to WLR3
26Phase 4 The transition of your WLR2 base to WLR3
27ORT5 Readiness to enter WLR3 Business as Usual
28Acronym Guide
To save repeatedly spelling out the meaning of
the acronyms used in this slide deck, weve only
done so the first time weve used them. Weve
reproduced them all here for easy reference