Title: Qu es Concerto
1RENAISSANCE ZARAGOZA WP2 Monitoring and
analysis
7th RENAISSANCE meeting- Lyon 28/04/2009
Rodrigo Vásquez Technical Coordinator UdZ-
RENAISSANCE
2WP 2
- Objectives
- Verification of Design hypothesis (WP 2.2 WP
5.1) - Analysis of local weather variations (WP 2.1 WP
2.2 WP 5.1) - Energy certification studies (WP 2.1 WP 2.2
WP 5.1) - Human behaviour impact verification (WP 1.5 WP
2.2 WP 2.3)
3ZAR-Design verification
- In order to verify the bioclimatic design UdZ has
developed several activities that allow obtaining
the necessary data. - Getting the first data from Block through of
optical digital network (Telemando) (WP 2.1) - Meeting with Endesa company (EDE) to define the
way to get measures from electrical meters (WP
2.1 WP 2.3) - Meeting with GasAragon in order to define the
appropriated gas meter devices. (WP 2.1 WP 2.3) - Installation finished of sensors to measure the
renewable energies contribution. (WP 2.1 WP
2.2 WP 2.3)
4ZAR-local weather analysis
- Acquisition of weather variables in order to
analyze the local weather impact. - Sensors distributed in Valdespartera to collect
data of temperature, humidity and wind.
5ZAR-Energy certification
- Follow a schema of activities in order to develop
a methodology of energy certification. The
procedure includes - Blocks simulation and energy evaluation
- Blocks Thermography
- Heat transfer through the building envelope
(equipment in purchase process) - Blower door tests
- Technical inspection to heating system (in
process)
6ZAR-Human behaviour
- Human behavior impact the performance of
buildings (WP 1.5) - Inadequate ventilation, curtain and blinds in
greenhouse, high temperature set have a high
influence in dwelling thermal behavior
7Activities UdZ (local leader on
Monitoring) Detailed presentation of WP2.1, 2.2
WP2.3 done with Lyon
8WP 2
- Summary
- WP 2.1 Integrated Energy Network
- WP 2.2 Quality Control and Performance Analysis
- WP 2.3 Common Monitoring and Analysis (included
LYONs activities)
9WP 2.1 Integrated Energy Network
- State of progress 6 first months
- Report action taken with reference to project
work plan - Specification establishment in order to get data
in the demonstrative building (construction
finalization in June) - Final meeting with Power companies to define all
data they provide, acquisition software, amount
and frequency of data - Equipment installation finished in 10 blocks
- First data acquired blocks 21 29 trough digital
network, data from p12 p14 locally - Blocks simulations (TSBI3 EnergyPlus). Blocks
P13, P14, P20, P21, P27 - Thermography laboratory test to analyses several
materials and wall thickness
- Highlight achievements
- Standardization of data from several sources
- Block connection to digital network
- Data acquisition from Valdespartera offices (this
equipment to be changed to demonstrative
building)
- Explain problems and deviations from plan
- Gas Equipments arent compatibles with automatic
acquisition. - Several problems of digital network (power
failures) - Physical connection between block and digital
network wasnt available in some cases, and by
street works interrupting the Fiber Optic route
10WP 2.1 Integrated Energy Network
- Equipment Installation summary
- Four blocks connected to digital network
- Data acquired from two blocks trough digital
network - Data acquired from two blocks with locals
equipment - Five blocks in standby to connect digital network
11WP 2.1 Integrated Energy Network
- Analysis of progress
- Strong / weak points
- S Good relationships with power utilities,
promoters and architects - W Works of wiring unfinished by promoter
- How to improve quality of work
- Demand the fulfillment of the works planned
- How to exploit collaboration / networking
opportunities - Explain action taken to overcome problems
- major coordination between builders and
technicians
12WP 2.1 Integrated Energy Network
- Plans for the next 6 months
- Calendar of action
- April Data acquisition from five blocks via
digital network - Sept First tests in the demonstrative center
- Overview of local work
- List of deadlines
- Roadmap of key events or target groups
(dissemination) - Connection entire blocks to digital network
- Gathering of gas and electricity data via
automatic acquisition software - Installation of an acquisition server in
demonstrative center - Identification of people responsible
13WP 2.2 Quality Control and Performance Analysis
- State of progress 6 first months
- Report action taken with reference to project
work plan - Follow a schema of activities in order to develop
a methodology of energy certification. The
procedure includes - Blocks simulation and energy evaluation
- Blocks Thermography
- Heat transfer through the building envelope
(equipment in purchase process) - Blowerdoor tests
- Technical inspection to heating system
- Renewables
- Highlight achievements
- Air leakages detection
- Thermals bridge and heat flows detection
- Explain problems and deviations from plan
- Problems to detect fails in ventilated facades
with Thermography. - Airflows by plugs, electrical covers and
extractor hood, can modify significantly the
results
14WP 2.2 Quality Control and Performance Analysis
- Analysis of progress
- Strong / weak points
- S High precision equipment available
- W Limited experience in these devices
- How to improve quality of work
- Increase the amount of building analized
- How to exploit collaboration / networking
opportunities - Explain action taken to overcome problems
- Work in conjunctions with other locals partners
with vast experience in thermal photography
15WP 2.2 Quality Control and Performance Analysis
- Plans for the next 6 months
- Calendar of action
- May Thermal photography finalization
- Overview of local work
- List of deadlines
- Roadmap of key events or target groups
(dissemination) - Exposition of results analysis to architects and
constructors - Report about impacts of air renovation, leakages,
heat losses over consumptions and energy demands - Identification of people responsible
16WP 2.3 Common Monitoring and Analysis
- State of progress 6 first months
- Lyon strategy
- Complete definition of monitoring techniques
(done) - Several Planning of phases have been defined
depending on allowed extra-time (from 0 to 2
years scenario) -
- Zaragoza strategy
- BLowerdoor test , images with a termographic
camera (done) - Facilities for inside building monitoring are
ready to operate and connected by digital network
(done) - First data from 21 reached (done)
- Comparison between Lyon Zaragossa
- Several exchanges (just start)
17WP 2.3 Common Monitoring and Analysis
18WP 2.3 Common Monitoring and Analysis
Energy Consumptions
19WP 2.3 Common Monitoring and Analysis
Energy Performance
20WP 2.3 Common Monitoring and Analysis
COMFORT and Indoor Air Quality
21WP 2.3 Common Monitoring and Analysis
HUMAN BEHAVIOR
22WP 2.3 Common Monitoring and Analysis
- Analysis of progress
- Strong / weak points
- Lyon and Zaragoza not in phase
- Independent choice of monitoring techniques gt
emergence of interesting ideas in each
community - How to improve quality of work
- Multiplication of exchange has to be planed
- Common database including test and measures
results - How to exploit collaboration / networking
opportunities - Explain action taken to overcome problems
23WP 2.1 Integrated Energy Network
- Plans for the next 6 months (end of year 3) (1
slide) - Calendar of action
- Joint evaluation of developments on innovative
techniques (wall conductance UdZ, natural
ventilation flow CETHIL-INSA) (next 3 months) - Beginning of feedback on performance of the PV
monitoring in Lyon (Hespul internship) (next 6
months) - Lyon No feedback from WP 2.2 in the next 6
months - First draft of the monitoring strategy
referential (next 6 months) - Overview of local work
- List of deadlines
- Roadmap of key events or target groups
(dissemination) - First building delivery September 2009 - lyon
- Identification of people responsible
24Contact
Rodrigo Vásquez T. rvasquez_at_unizar.es