Amsterdam : 15.04.2002 GeoTechNet Network Meeting 1 - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Amsterdam : 15.04.2002 GeoTechNet Network Meeting 1

Description:

Elaboration Workplan approach. 3.2. Content WP3 related databases use. 3.3. ... WP3 - Elaboration of Workplan approach. WP3 objective : Stimulating use FEM & OM ... – PowerPoint PPT presentation

Number of Views:37
Avg rating:3.0/5.0
Slides: 21
Provided by: geote1
Category:

less

Transcript and Presenter's Notes

Title: Amsterdam : 15.04.2002 GeoTechNet Network Meeting 1


1
Amsterdam 15.04.2002GeoTechNet Network
Meeting 1
  • Session on WP 3Design Tools FEM OM
  • Ir. N. Huybrechts Ir. M. De Vos, Belgian
    Building Research Institute

2
  • GeoTechNet General objectives
  • WP3 Design Tools2.1. Why2.2. Objectives
    WP32.3. Deliverables2.4. Input
    Information2.5. Practical aspects
  • WP3 Discussion items gt Strategy
    planning3.1. Elaboration Workplan approach3.2.
    Content WP3 related databases use3.3. Assign
    extra MD for Assistance WP33.4. Determine group
    of WP3-interested members

3
1. General objectives GeoTechNet (a.o.)
  • Dissemination of Geotechnical RTD in Europe
  • Determining blind spots in actual know-how
    needs for future RTD
  • Steer optimise European research efforts

4
2. WP3 Design Tools
  • 2.1. WP3 Why ?
  • Increasing complex underground
    structures Demand for more economic
    design Development in software (user friendly)
    hardware (fast cheap)? Facilitates the use
    of more advanced numerical design tools

5
  • 2.2. WP3 design tools objectives
  • Stimulate accelerate use of innovative
    cost effective design methods Key-innovative
    methods FEM OM Important demonstrate the
    proper use of these methods

6
  • 2.3. WP3 design tools Deliverable
  • Report on "FEM OM" use with - WP3-work
    analysis - Recommendations for proper
    FEM-use for OM-applications for future RTD
  • Databases (WP1) - RTD - Measurement
    techniques
  • - Numerical programs

7
  • 2.4. WP3 design tools Input Information
  • via GeoTechNet partners via WP1 databases
    on - RTD projects - Measurement/monitoring
    techniques - Numerical programs
  • via MD efforts foreseen in WP3 (see next
    slide)

8
  • 2.5. WP3 design tools Practical aspects
  • WP-leader BBRI Total efforts 150
    man/days - 50 MD for coordinating WP3 (BBRI) -
    60 MD for drafting reports (BBRI) - 40 MD for
    assistance (to be assigned)

9
3. WP3 Discussion items
  • 3.1. Elaboration of workplan approach
  • 3.2. Content Use of the WP3-related databases
  • 3.3. Assign 40 MD of WP3-work
  • 3.4. Determine a group of members especially
    interested in WP3
  • gt Strategy planning

10
  • 3.1. WP3 - Elaboration of Workplan approach
  • ? WP3 objective Stimulating use FEM OM
    overview of collected, well documented cases
    comparison with classic design pointing out
    cost savings/economic gains

11
  • ? WP3 objective  proper  use of FEM Step 1
    address problems
  • ir. M. De Vos, BBRI

12
  • Step 2 Collect existing work
  • - RTD results, reports - Design exercises in
    the past conclusions - Report WG A of Cost
    C7-action "Soil Structure Interaction
    (1996-2002)" - National guidelines (f.ex.
    CUR-report 178 191) -

13
  • Step 3 Analysis overview existing
    work Determination of contradictions(?), missing
    information, blind spots,
  • Step 4 Based on results step 3 ? suppl.
    action (design exercise f. ex.)

14
  • ? WP3 objective OM-applications
  • Step 1 address possible problems -
    determining measurement program (what, how,
    how many) - procedures to implement in overall
    design construction process - risk
    levels -

15
  • Step 2 Collect existing work -
    literature - case studies, - Step 3
    Analysis recommendations for OM-applications
    future RTD

16
  • ? Necessary information
  • Literature addressing OM-procedures
    applications (WP3) Existing
    reports/guidelines (WP3) Well documented case
    studies (WP3) RTD-projects (WP1) Database
    on measurement techniques (WP1)

17
  • 3.2. Content Use of the WP3 related databases
    (WP1)

Database numerical programs FEM
18
Database measurement/monitoring techniques
19
  • 3.3. Assign 40 MD WP3 work
  • ? Active role in analysis reporting
  • 3.4. Establish WP3-interested mirror
    group?Information gathering transfer
  • ? Communication discussion WP3-activities
  • ?

20
  • Strategy planning WP3-activities
  • ? Strategy on information collection transfer
  • ? Planning (next NM-meeting November 2002)
Write a Comment
User Comments (0)
About PowerShow.com