SATHI - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

SATHI

Description:

'The objective of the BETA Mobile Device is to unobtrusively assist the ... SATHI being demonstrated to His Excellency Dr. A P J Abdul Kalam, President of India ... – PowerPoint PPT presentation

Number of Views:135
Avg rating:3.0/5.0
Slides: 25
Provided by: samyeer
Category:

less

Transcript and Presenter's Notes

Title: SATHI


1
SATHI
2
Agenda
  • Project Objectives
  • Introduction to the SATHI
  • Issues and Solutions

3
Project Objectives
  • The objective of the BETA Mobile Device is to
    unobtrusively assist the soldier with
    communications and battlefield situational
    awareness.

4
Project Objectives
  • See own position with respect to Map
  • See friendly positions on Map
  • Communicate with friendly Positions (Encrypted),
    speech Short Messages
  • mark and share enemy position/mission info
  • Interface to other field equipment
  • Send/receive information to/from command

5
SATHI
6
Auto Map Display
7
Typical Usage Display
8
Short Messaging
9
Map Markings
10
Map Operations
11
Configure Map Layers
12
Remote Commands
13
Mission Configuration
14
Combat Net Radio
  • BACKCHANNEL OPERATION

15
Issues and Solutions
16
The Components
  • PXA 255 Processor _at_ 400 Mhz
  • 128 MB RAM - 128 MB FLASH
  • COLOUR 3.8inch TFT Transflective Panel
  • Touch Panel Input
  • USB Master (Camera, Printer, USB Disk, Mobile
    Phone)
  • V.90 Internal Modem
  • USB Slave Serial Port IRDA
  • Full Serial Port (9 PIN) with Ext PTT
  • Integrated GPS Receiver
  • Integrated FHSS RF Modem
  • Internal MIC/Speaker and Headset

17
Software Components
  • GIS Software (PC SATHI)
  • Ad hoc radio networking GRAPEVINE
  • IETEs N. V. Gadadhar Award
  • GPS Utilities
  • Application Launcher Linux Utilities
  • Battlefield Operation
  • Embedded Linux

18
Misc Issues
  • Single Handed Operation
  • Battery Charging/Monitoring
  • Device Integration

19
Whats Special?
20
Whats Special
  • Project Management
  • Concurrent Development
  • The Team

21
Project Management
  • High Profile Project Startup
  • Unconventional Approach for Fast Track
    Development
  • Empowered Project Management Team
  • Sticking to what works

22
Concurrent Development
  • Distinct teams
  • Task oriented development
  • Incremental Builds
  • Trust as a Management approach

23
The Team
  • Doers
  • Believers

24
SATHI being demonstrated to His Excellency Dr. A
P J Abdul Kalam, President of India
Write a Comment
User Comments (0)
About PowerShow.com