Description:

It is since 1995 with support of the united states that mine action was ... we have allocated 15 million USD, Capacity is build to full scale,- a lot a lot ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 15
Provided by: minea
Category:

less

Transcript and Presenter's Notes

Title: Ethiopian Mine Action Office Background


1
Ethiopian Mine Action OfficeBackground
  • It is since 1995 with support of the united
    states that mine action was established in
    Ethiopia
  • It was established under the ministry of defense
  • Until 2001 de-mining had been the responsibility
    of the defense
  • It is later that with the advent of
    Ethio-Eritrea conflict that a civilian national
    mine action authority, EMAO, was established
  • The purpose of establishing the new mine action
    authority was due to different circumstances

2
Map of the General Survey
3
Problems Encountered
  • Ethiopia has been in a conflict for many years
  • Out of all the conflicts which left Ethiopia with
    huge scattered landmines and mine fields was the
    Ethio-Eritrea conflict.
  • Only In this conflict
  • About 364,000 people were displaced
  • Houses and infrastructures were destroyed
  • lands bordering with Eritrea were planted by
    mines extensively

4
Practical Effect
  • Right after the cessation of hostilities between
    the two countries
  • Displaced people rushed to their homes and became
    victimized-high number of victims registered
  • Those who managed to reach homes could not resume
    life due to the fact that their houses were
    destroyed, infrastructures were either destroyed
    or blocked by mines
  • To the same reason people could not utilize their
    lands for cultivation as well as for grazing
  • Returning the people back to their homes were
    also economically, socially and politically
    viable to the government

5
Examples of practical effect
6
Continued
7
Seeking Solutions
  • Therefore the government decided to take loans
    from the WB for
  • Household rehabilitation
  • Maintenance or reallocation of roads and power
  • Construction of community infrastructures
  • Supporting the family of deceased
  • Supporting the deportees from Eritrea
  • Demobilization of troops
  • The WB agreed to give more than 300 million USD
    as a soft loan for all projects

8
The necessity of mine action in Ethiopia
  • When government planned to take the loan it was
    realized, by both parties, that almost all
    components in the plan cant be executed with out
    mine action involvement
  • Therefore de-mining became a prerequisite and 15
    million USD has been allocated for de-mining.
  • As a result of this EMAO was established as an
    autonomous office to assist the implementation of
    the projects as well as to build its own capacity
    in order to address all landmine related problems
    all over the country

9
Continued
  • As a result of this mine action implementation
    has been fully integrated to all the the project
    components since inception.
  • The whole operation was financed by the loan
  • Due to this effect, about 90 of the displaced
    has returned home
  • 24 out of the 30sqkms immediate suspected land is
    cleared

10
Results
  • A Capacity of fully equipped and qualified six
    national manual de-miners (748) and three
    machines exist.
  • 6 MDD were contracted for a year
  • In addition to this, recently,there are 15 MDDs
    imported and 8 dog handlers trained by NPA.
  • The MDD will be extended to 25 and a full scale
    training center will also be established
  • The UN also assisted in the technical capacity
    building since start.
  • More than 80 of the population of the area were
    made aware of MRE and victims of the unaware has
    reduced dramatically

11
Pros and Cons of the loan Fund
  • Ethiopia has taken its initiative to tackle its
    own problems
  • That helped not only to address the problems but
    also to the quick development of its own capacity
  • Operation started fast, all went smooth, and the
    capacity established was as desired

12
Continued
  • On the other hand Ethiopia did not receive enough
    donations compared to many other countries
  • Thanks to the EC now there is money plugged for
    the next two years to continue operations.

13
Future plans
  • In order to have a reasonable and well planed
    de-mining operation that suits to the country
  • We will have 5 technical survey and RRTs which
    will be budgeted by NPA
  • We will have a full scale training center which
    will be mobilized jointly by NPA and THE UN
  • We will increase the capacity of machines from 3
    to 6 which will be resource mobilized by the UN

14
Continued
  • We will strengthen the existing 6 manual
    de-mining Coys through the EC budget
  • Then life is simple for the next two years
  • The big head ach is what would happen after two
    years. I know the government will say we have
    allocated 15 million USD, Capacity is build to
    full scale,----- a lot a lot