GONG Time distance pipeline status - PowerPoint PPT Presentation

About This Presentation
Title:

GONG Time distance pipeline status

Description:

Produce daily acoustic power maps (optional, for future use) Acoustic powermap example ... Mask-out active regions (optional) Phase velocity filter. Predefined ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 22
Provided by: shu78
Learn more at: https://gong.nso.edu
Category:

less

Transcript and Presenter's Notes

Title: GONG Time distance pipeline status


1
GONG Time distance pipeline status
  • Shukur Kholikov

2
Outline
  • Short description
  • Some results and examples
  • m0 exercise

3
  • GONG merged velocity images
  • 800x800 pix
  • 1440 images

4
Remaping
  • Use 70º in latitude and longitude
  • Track relatively noon time of each day
  • Apply backward filter (optional)
  • Line of sight correction (optional)
  • Produce daily acoustic power maps (optional, for
    future use)

5
Acoustic powermap example
6
Acoustic powermap with one single dead pixel
7
SHT computations
  • Lmax550 (default)
  • Option for any target region or hemispheres
  • Mask-out active regions (optional)

8
Phase velocity filter
  • Predefined 3 depths 7,12,30 Mm
  • Option to filter out f-ridge
  • Option to keep only f-modes

9
Reconstruction
  • 57 in latitude and 50 in longitude
  • Lat-Long or sin(Lat)-Long
  • Corresponding acoustic power map

10
Cross-correlations
  • Average, north-south, east-west
  • Gabor wavelet fitting
  • Demodulation and cos-fitting

11
Optional output products
  • SH time-series
  • LNU diagram for individual days
  • Phase velocity filtered reconstructed images
  • Travel times or differences
  • Longitude averaged time series

12
North-south travel time differences ( Depth ?
7 Mm )
13
North-south travel time differences ( Depth ?
12 Mm )
14
North-south travel time differences ( Depth ?
30 Mm )
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
Meridional flow profile measurements with
SOHO/MDI U.Mitra-Kraev and M.J.Thompson Astron.Na
chr./ AN 328, 10, 2007
19
m0 GONG 150 days
20
Travel time differences from longitudinal
averaged images
2006-2007
21
2001-2002
Write a Comment
User Comments (0)
About PowerShow.com