Title: East GatewayBrewery Grade Project


1
East Gateway/Brewery GradeProject
  • Meeting with Stakeholders
  • January 15th, 2008

2
Agenda
  • Introductions
  • Project update
  • Key design parameters
  • New alternatives at Brewery Grade
  • Options at
  • Taylor Street
  • Brewery Overpass
  • Input/questions/comments
  • Summarize meeting, next steps

3
Firm and Team Summary
  • Hopper Dennis Jellison
  • 28 years in Pacific Northwest
  • Mead Hunt
  • 100 years, nationally recognized firm
  • Tenneson Engineering
  • 53 years local surveying and engineering firm
  • Other team firms
  • Normandeau Associates Public Involvement
  • Ash Creek - Geotechnical

4
Introductions
  • Greg Jellison, PE Project Manager, HDJ
  • Tom Beggs, PE Asst. PM, HDJ

5
Project Update
  • HDJ/Mead Hunt selected
  • Meetings with City staff conducted
  • Key design parameters defined
  • Additional funding sources explored
  • Create draft alternatives
  • Conduct meetings and obtain input from
  • Project stakeholders (our meeting today)
  • Advisory Committee (later this evening)

6
Key Project Design Parameters
  • Improve Brewery Grade intersection
  • Create a signature gateway into The Dalles
  • Enhance traffic flow and safety
  • Large trucks and emergency vehicles
  • Bicyclists and pedestrians
  • Local and interregional traffic
  • Maintain and improve access/parking
  • Slow down traffic entering town
  • Provide a low maintenance, sustainable solution

7
New Alternatives, Brewery Grade
  • Brewery Grade intersection is the heart of the
    project primary focus of alternatives
  • Fix Brewery Grade intersection no bandaids!
  • Satisfy as many key design parameters as possible
  • Provide significant overall improvement
  • Create a gateway City can be proud of

8
Winning Formula forBrewery Grade?
  • Look to configurations that SOLVE the key design
    parameters, not perpetuate them
  • Think outside the box, yet use familiar, proven
    methodology
  • Ensure solution is for the long term no
    bandaids

9
Roundabouts
10
How roundabouts work
11
Higher capacity, and fewer delays
12
Slower speeds andfewer points of conflict
Safer for peds, bikes, vehicles
13
with proven accident reduction
14
Work well in urban settings
15
Beautiful gateways
16
using a variety of elements
17
Low maintenance,sustainable design
18
Brewery Grade Alternatives
  • Draft Alternative A
  • Draft Alternative B

19
Taylor Street
  • Maintain existing access
  • Improve triangle traffic flow

20
Brewery Overpass
  • Simplify traffic flow
  • Improve truck turn movements
  • Utilize undercrossing for bikes, pedestrians

21
Checking Key Design Parameters
  • Improve Brewery Grade intersection - YES
  • Signature gateway into The Dalles - YES
  • Enhance traffic flow and safety
  • Large trucks and emergency vehicles - YES
  • Bicyclists and pedestrians - YES
  • Local and interregional traffic - YES
  • Maintain and improve access/parking - YES
  • Slow down traffic entering town - YES
  • Provide a low maintenance, sustainable solution -
    YES

22
Questions, comments, input
23
Summarize Meeting,Next Steps