Integrating P2 Into An Existing Management System - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Integrating P2 Into An Existing Management System

Description:

Compliance with regulations at the Municipal, Provincial, and Federal levels ... mass of sludge mass in wastewater mass in emissions unaccountable losses) ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 10
Provided by: defau662
Category:

less

Transcript and Presenter's Notes

Title: Integrating P2 Into An Existing Management System


1
Integrating P2 Into An Existing Management System
  • Planning Cost Effective Resource Recovery

Cheryl Gonsalves
5th Canadian P2 Roundtable June 8th 2001
2
Major drivers for continuous improvement are
usually
  • Compliance with regulations at the Municipal,
    Provincial, and Federal levels
  • Pressure from associations
  • General awareness from ECEA seminars
  • Standards set by sector specific associations
    (Metal finishers, printers, auto, etc)
  • Commitment by management to an organizational
    paradigm geared to long-term success and solid
    corporate citizenship

3
Utilizing one or more of the following processes
can have a positive influence on planning for
cost effective resource recovery for a company
  • Paper study of their operations from easily
    accessible information
  • i.e. inventory records, invoices for energy/water
    consumption, and waste manifests
  • Survey of the facility (in-house or with a
    consultant)
  • Comprehensive site inspection
  • Full site audit of emissions, water/effluent
    quality, soil, energy consumption, health
    safety, and general housekeeping

4
Information Analysis
  • Identify inputs/outputs to determine mass balance
  • (mass input mass of products mass of sludge
    mass in wastewater mass in emissions
    unaccountable losses)
  • Most companies accept a 70 30 mass balance
    ratio as indicating Were doing really well
  • Can we realistically aim to achieve a ratio of 90
    10?

5
Metal Finishing Company Scraps Steel Waste Costs
  • A local metal finishing company has succeeded in
    implementing cost effective resource recovery in
    the following ways
  • Designating a specific bin for scrap metal
    recycling of brass and steel
  • Offering solid brass trimmings and fixtures at
    the same price at metal plated ones to decrease
    disposal costs for waste products associated with
    the plating process
  • P2 and waste reduction are key components of this
    companys business ethic

6
Other Successful Initiatives in Integrating P2
into Existing Management Systems
  • Corus Coil Coating
  • New closed-loop chrome plating system
  • Industrial Coatings
  • Maximizing the use of water-based and high solids
    coatings thus reducing solvent-based paints and
    coatings
  • MacGregors Meat and Seafood
  • Neutralizing caustic wastewater using gaseous
    CO2, a natural by-product of their dry ice
    cooling process

7
  • Leader Plating on Plastic
  • Recycling of nickel and chromium plating sludge
    by selling to INCO
  • Apotex
  • Use of isopropyl alcohol instead of methanol as a
    cleaning agent to improve emissions control
  • Giant Disposal
  • Selling waste collected from other companies for
    conversion to electric power

8
Conclusion
  • Education is Fundamental
  • Partnerships can be very effective (e.g. between
    Government, Industry ENGOS)
  • Highlight examples where high environmental
    standards have led to increased innovation
  • Key message is still on maximizing profitability,
    not environmental protection!

9
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com