Title: CZECH REPUBLIC
1CZECH REPUBLIC
- Joined the EU on May 1, 2004
- Signatory to the Kyoto Protocol
- Target renewable energy share
- in 2010 8
- Additional RES capacity to be built
- to meet the target 3.7 TWh/yr
- Biomass accounts for 80 of the
- country RES potential
2RES promotionin the Czech Republic
- The Czech Government supports new RES erection
through - Subsidized renewable electricity prices
- Five-year tax holiday
- Direct subsidies
- Emission reduction units revenue
- New RES Promotion Law in the context of full
liberalization - of the electricity market in 2006, expected
to get passed - this year, introducing the green
certificates concept
- EU Structural Funds and other internal programs
-
- Indirect support (human resources, SMEs,
farming, ) -
3The Project
- Steam condensing Rankin-Clausius power plant
- 10 MWe net electricity supply
-
- Main fuels energy plants and grain straw
-
- Supplementary fuels wood chips,
-
food crop waste, -
- Location Industrial site in the outskirts of
- Hradec Kralove, Czech
Republic -
4Key Parameters
- Boiler rated heat output 42 MWt
- Turboset rated capacity 12 MWe
- Projected capacity utilization 80
-
- Gross electricity production 84 100
MWh/yr - Net electricity supply
70 000 MWh/yr
- Fuel consumption 83
500 t/yr
- Fuel average heat value 14
GJ/t
- Emmision reductions 80
000 tCO2/yr
5Financial Parameters ( mn)
(may change substantially after the technology
supply tender completion)
- Initial working capital 1.1
- Annual revenues
5.8 - (assuming the electricity price CZK 2.50
per kWh, with electricity - sales at the bottom of the expected range
and with zero CO2 - emission reduction revenues)
- Annual operating costs 3.7
6Current State of the Project
- Suitable piece of land secured
- Positive master planning decision obtained
- Technology supply tender announced
- Building permit application being prepared,
- the permit to be obtained by the end of 2004
- Czech Government grant applied for
- EU structural funds grant application being
prepared
- Negotiations with equity investors on-going
7Fuel Supply Energy Plants
- Major fuel source in the long run
- Hectare yield 10 to 15 t/ha
- Cropped area to fully cover the facility fuel
demand - 8 000 ha
- Ideal use of the land redundant for the food
- production
- The market in the Czech Republic to be
established - yet
8Fuel Supply Grain Straw
- Major fuel source in the first few years
- Current oversupply in the Czech Republic
expected - to grow in the view of the latest state
agricultural - policy developments
- New bio-ethanol promotion legislation gt straw
as - a waste
9Fuel SupplyCurrent Contractual Position
- Preliminary agreements with ca 150 farmers and
- a wholesale contractor cover the initial
fuel - demand for a full capacity operation
- Long term deliver-or-pay agreements pre-agreed,
- to be executed after the facility
construction - commencement
- Fuel auction
- to establish the biomass fuel market
- to maintain optimal market prices in the long
run
10The Site
- 2.3 ha industrial site plot on the outskirts of
- Hradec Kralove, Czech Republic
- Master planing decision issued
- May accomodate up to 3 units of the projected
- size in the future
11The Site - Infrastructure
- Nearby 110/6 kV switching station, 200 m from
- the plot border !
- Favourable road-access location
- Sufficient gas, electricity, water and sewage
- capacity in place
- No conflicts with the adjacent land owners and
- satisfactory result of the
hydro-geological, - emission dissemination, noice etc. studies.
12Project Developer
- Main activities turn key deliveries, design,
- assembly, revision work and consultancy in
the - field of protection, control and signalling
- technologies for energy facilities of all
voltage - levels, automation of the related processes
- Annual turnover EUR 1,2mil.
13Other Stakeholders
- Ministry of Environment of the Czech Republic
- Ministry of Industry and Trade
- of the Czech Republic
14Financial Model
15Financial Model - case 1
This case is pessimistic variant of the Financial
Model
IRR gt 15
16Financial Model - case 2
This case is optimist variant of the Financial
Model
IRR gt 30
17Contacts
EGST, s.r.o. Vsehrdova 293/28 500 02 Hradec
Kralove Czech Republic http//www.egst.cz Tel
420 49 5532 998 Mr. Zdenek Tetrev, Mananging
Director tetrev_at_egst.cz Mr. Ales Mitterko,
Project Manager mitterko_at_egst.cz Leonard
Beitler, Financial Advisor Na Orechovce 47 162 00
Praha 6 Tel. 420 602 315 102 , Fax 420 233
343 562 leonard_at_nextra.cz