Title: CZECH REPUBLIC


1
CZECH REPUBLIC
  • Joined the EU on May 1, 2004
  • Signatory to the Kyoto Protocol
  • Target renewable energy share
  • in 2010 8
  • Additional RES capacity to be built
  • to meet the target 3.7 TWh/yr
  • Biomass accounts for 80 of the
  • country RES potential

2
RES promotionin the Czech Republic
  • The Czech Government supports new RES erection
    through
  • Subsidized renewable electricity prices
  • Five-year tax holiday
  • Direct subsidies
  • Emission reduction units revenue
  • New RES Promotion Law in the context of full
    liberalization
  • of the electricity market in 2006, expected
    to get passed
  • this year, introducing the green
    certificates concept
  • EU Structural Funds and other internal programs
  • Indirect support (human resources, SMEs,
    farming, )

3
The Project
  • Pilot project
  • Steam condensing Rankin-Clausius power plant
  • 10 MWe net electricity supply
  • Main fuels energy plants and grain straw
  • Supplementary fuels wood chips,

  • food crop waste,
  • Location Industrial site in the outskirts of
  • Hradec Kralove, Czech
    Republic

4
Key Parameters
  • Boiler rated heat output 42 MWt
  • Turboset rated capacity 12 MWe
  • Projected capacity utilization 80
  • Gross electricity production 84 100
    MWh/yr
  • Net electricity supply
    70 000 MWh/yr
  • Fuel consumption 83
    500 t/yr
  • Fuel average heat value 14
    GJ/t
  • Emmision reductions 80
    000 tCO2/yr

5
Financial Parameters ( mn)
(may change substantially after the technology
supply tender completion)
  • Investment budget 15.8
  • Initial working capital 1.1
  • Annual revenues
    5.8
  • (assuming the electricity price CZK 2.50
    per kWh, with electricity
  • sales at the bottom of the expected range
    and with zero CO2
  • emission reduction revenues)
  • Annual operating costs 3.7
  • Operating Profit
    2.1

6
Current State of the Project
  • Suitable piece of land secured
  • Positive master planning decision obtained
  • Technology supply tender announced
  • Building permit application being prepared,
  • the permit to be obtained by the end of 2004
  • Czech Government grant applied for
  • EU structural funds grant application being
    prepared
  • Negotiations with equity investors on-going

7
Fuel Supply Energy Plants
  • Major fuel source in the long run
  • Hectare yield 10 to 15 t/ha
  • Cropped area to fully cover the facility fuel
    demand
  • 8 000 ha
  • Ideal use of the land redundant for the food
  • production
  • The market in the Czech Republic to be
    established
  • yet

8
Fuel Supply Grain Straw
  • Major fuel source in the first few years
  • Current oversupply in the Czech Republic
    expected
  • to grow in the view of the latest state
    agricultural
  • policy developments
  • New bio-ethanol promotion legislation gt straw
    as
  • a waste

9
Fuel SupplyCurrent Contractual Position
  • Preliminary agreements with ca 150 farmers and
  • a wholesale contractor cover the initial
    fuel
  • demand for a full capacity operation
  • Long term deliver-or-pay agreements pre-agreed,
  • to be executed after the facility
    construction
  • commencement
  • Fuel auction
  • to establish the biomass fuel market
  • to maintain optimal market prices in the long
    run

10
The Site
  • 2.3 ha industrial site plot on the outskirts of
  • Hradec Kralove, Czech Republic
  • In the ownership of EGST
  • Master planing decision issued
  • May accomodate up to 3 units of the projected
  • size in the future

11
The Site - Infrastructure
  • Nearby 110/6 kV switching station, 200 m from
  • the plot border !
  • Two railway sidings
  • Favourable road-access location
  • Sufficient gas, electricity, water and sewage
  • capacity in place
  • No conflicts with the adjacent land owners and
  • satisfactory result of the
    hydro-geological,
  • emission dissemination, noice etc. studies.

12
Project Developer
  • EGST, s.r.o.
  • Main activities turn key deliveries, design,
  • assembly, revision work and consultancy in
    the
  • field of protection, control and signalling
  • technologies for energy facilities of all
    voltage
  • levels, automation of the related processes
  • No. employees 40
  • Annual turnover EUR 1,2mil.

13
Other Stakeholders
  • Ministry of Environment of the Czech Republic
  • Czech Environment Fund
  • Ministry of Industry and Trade
  • of the Czech Republic
  • CzechInvest
  • EBRD
  • IFC
  • Commercial banks
  • Equity investors

14
Financial Model
15
Financial Model - case 1
This case is pessimistic variant of the Financial
Model
IRR gt 15
16
Financial Model - case 2
This case is optimist variant of the Financial
Model
IRR gt 30
17
Contacts
EGST, s.r.o. Vsehrdova 293/28 500 02 Hradec
Kralove Czech Republic http//www.egst.cz Tel
420 49 5532 998 Mr. Zdenek Tetrev, Mananging
Director tetrev_at_egst.cz Mr. Ales Mitterko,
Project Manager mitterko_at_egst.cz Leonard
Beitler, Financial Advisor Na Orechovce 47 162 00
Praha 6 Tel. 420 602 315 102 , Fax 420 233
343 562 leonard_at_nextra.cz