IOWA DOT Accelerated Bridge Construction Workshop - PowerPoint PPT Presentation

About This Presentation
Title:

IOWA DOT Accelerated Bridge Construction Workshop

Description:

... mistry_at_fhwa.dot.gov. Front burner priorities. By 2020, 90% of Urban ... 1/3 bridges some 200,000 bridges are structurally deficient or functionally obsolete ... – PowerPoint PPT presentation

Number of Views:99
Avg rating:3.0/5.0
Slides: 10
Provided by: Vasant8
Learn more at: https://www.iowadot.gov
Category:

less

Transcript and Presenter's Notes

Title: IOWA DOT Accelerated Bridge Construction Workshop


1
IOWA DOT Accelerated Bridge Construction
Workshop
By Vasant Mistry Federal Highway
Administration vasant.mistry_at_fhwa.dot.gov
2
(No Transcript)
3
Front burner priorities
  • By 2020, 90 of Urban Interstate Highways are
    at or exceeding capacity
  • 1/3 bridges some 200,000 bridges are
    structurally deficient or functionally obsolete
  • Annual loss of 40,000 lives

4
U.S. Bridge Construction By Decade
5
Work Zone Impacts
  • 6,400 work zones (2003)
  • 6,157 lane miles closed
  • 20 capacity reduction
  • Safety Issues

6
Congestion Impact
  • Congestion robs our nation of productivity and
    quality of life
  • 4 billion hours/year time delay
  • 2.7 billion gallons of wasted gas/year
  • 73 billion in 75 urban areas

7
Cost to Families and Civic Life
  • Americans have less time to spend with their
    families and friends.
  • - 55 miss one or more family functions per
    week.
  • - 85 would spend more time with their family.
  • Congestion negatively impacts the country's
    social fabric.

8
Cost of Congestion to U.S. Businesses
500K/year for additional travel time for
maintenance crews Congestion at the Ambassador
Bridge, cost users between 150M and 200M.
Intel has moved their shipment departure time up
two hours
9
Thank You
Accelerated Bridge Construction