Title: Seismic analysis and design of
1- Seismic analysis and design of
- a structure in the UAE
Student Name Amna Mohamed Fatima Al-Hosani Huda
Al-Hayyass Iman Salem Muna Abdulla Nada Bakri Al
Naser
Advisor's Name Prof. Ahmed Ghobarah
2Description of the Project
- Location of the project
- Height type of the project
- -The structure is 40 stories office building, 136
m - high.
- -The first story is 4.2 m in height and other
stories are 3.4 m floor to floor height. - -The building is a reinforced concrete structure
- - Area of one floor 1216
3Description of the Project
Plan of the Project Tower from Floor (1-23)
4Description of the Project
Plan of the Project Tower from Floor (24-39)
5Description of the Project
Plan of the Project Tower for Level 40
6Types of loads
- Earthquake Load (E).
- Wind Load (W).
7Own weights of the walls
Calculated using the equation
For interior walls
Thickness was assumed as 0.4 m. ? OW
interior walls 34kN/m
-
-
- Thickness was assumed as 0.5 m.
- ? OW exterior walls 42.5 kN/m
For exterior walls
8Own weights of the slab
Calculated using the equation
t slab L /28 8000/28 285.7 mm 300 mm.
Concrete density (?concrete) 25 kN/m3.
Flooring weight was assumed to be 1.5 kN/m2.
OW slab 9 kN/m2
9- Area of one floor 1216 m2.
- D.L slab 9 kN/m2.
- Total No. of walls per floor 30 walls.
- Height of wall 3.4 m.
- Wall length 6 m.
- Unit weight of wall 25 kN/m3
10D.L
47764
11Live Load (L.L)
Axial Load from the L.L on the wall
- Live Load (L.L) x Tributary area (B) x Live
Load Reduction Factor (L.L.R.F) -
- - Live Load (L.L) 2.4 kN/m2.
-
- - Live Load Reduction Factor (L.L.R.F)
- B tributary area.
-
- - Tributary area "B" (m2)
12 1437
13Base Shear
- Base shear is an estimate of the maximum
expected lateral force that will occur due to
seismic ground motion at the base of a structure.
-
- _Soil conditions at the site_Proximity to
potential sources of seismic activity - _Probability of significant seismic ground
motion_The level of ductility and over strength
- _The fundamental (natural) period of
vibration of the structure
Calculations of base shear (V) depend on
14Earthquake intensity divided into 5 zones
0.15
15Sesmic load
16Seismic Coefficient Cv
0.32
17Seismic Coefficient Ca
0.22
18Formula Calculations
V 8456.064 KN
Vmax 39099 kN
Vmin 11182.3KN.
19Shear Force
20Shear Force
21Earthquake Forces on the Building
Max 2177.74 kN
Earthquake force on each floor
40 Story Building
22Earthquake Shear Forces Diagram
Max 11181.7 kN
23Wind Pressure on Buildings
24Exposure B
Exposure C
Exposure D
Building adjacent to other building
Building in open area
Building near the shoreline
25Wind Pressure on Buildings
26Wind Loads Calculations
B
A
27(No Transcript)
28(No Transcript)
29(No Transcript)
30Comparison Between Wind Earthquake Loads
Factored Force 1 EQ
Factored Force 1.6 W
31M FH M 133.62(136 129.2)
267.25(132.6 129.2) 1817.27
kN.m
32Bending Moment Diagram
33Comparison between Hand Calculations ETABS
Software
34Comparison between Hand Calculations ETABS
Software
35Comparison between Hand Calculations ETABS
Software
36Design of slab
37Parameters
- ? concrete 25kg/m3.
- Wall weight 25 KN/m3.
- Flooring 1.5 kN/m2.
-
- The thickness of the slab was taken to comply
with the deflection limit for a continues slab of
L/28.
38Parameters
ln L wall thickness
- 8 0.2(interior) 0.25(exterior) 7.55 m
- Or
- 8 0.2(interior) 0.2(interior) 7.6
m
fy 460 MPa
39Calculations
wD (1x 1 x height of foor x ? concrete)
Flooring (1x 1 x 0.3 x 25) 1.5 9 kN/m2
- wL 2.4 kN/m2 for office building.
- (ASCE STANDARD (7-05) Minimum Design Loads for
Buildings and Other Structures (page 120)) - wu 1.4 D.L 1.7 L.L
- 1.4 x (9) 1.7 x (2.4)
- 16.68 kN/m2
40ACI coefficients'
41Moment Diagram
42Results from structural Analysis
The design will be according to the determined
moments as follows
- ve moment ? Mu 67.91 kN.m
- -ve moment edges ? Mu - 59.43 kN.m
- -ve moment interior ? Mu - 95.08 kN.m
43Amount of reinforcement Determination
- Mu As fy (d-a/2) 0.9 As fy d
- d thickness of slab cover ½ diameter of bar
- 300 20 5 ? d 275 mm.
44As values
- For the ve moment Mu 67.91 kN.m
- As 596.5 mm2/m.
- For the edge -ve moment Mu - 59.43 kN.m
- As 522.04mm2/m.
- For the interior -ve moment Mu - 95.08 kN.m
- As 835.13 mm2/m.
45Determination the amount of steel needed
46(No Transcript)
47(No Transcript)
48Reinforcement in 2nd direction
- The second direction would have the minimum steel
amount can be used, which is 10 at maximum
spacing.
- Maximum Spacing (According to ACI Code).
- the minimum of Smax X Stslab, 450
- min of 5x300, 450 450 mm.
- ? use 10 bars at 450 mm.
49Design wall
Wind Load
50Stiffness
400 mm
6500 mm
Stiffness of small wall
51Shear and Moment
52Shear for Walls
500 mm
6500 mm
Shear of small wall
425.86kN
53Moment for Walls
Moment of small wall
400 mm
6500 mm
33130.33kN.m
54Design of wall
55From the calculations of design slab the D.L and
L.L 47764 (1.7)1437 50,206.9 KN/per wall
- assume the concrete stain equal 0.003.
56(No Transcript)
57(No Transcript)
58Section of the wall
59Ultimate moment 33130.33kN.mgtmoment
capacity1760 kN.m
60Redesign Wall
- Increase the number of bars at the ends of the
wall to increase the moment capacity.
- Moment to be taken by steel bars at the ends
33130-1760 31380 kN.m.
- The steel have been added at both end of the
wall by 300mm from end in each of the ends.
61Redesign Wall
Area of steel of bars at the ends of wall
Use 843
62Design of Shear
Shear reinforcement 212_at_500 mm
63Design Detail
64Cost Estimation
Definition Cost estimation is determination of
utilizing experience, calculating and forecasting
the future cost of resources, methods, and
management within a scheduled time frame.
65Cost Estimation
- Using UAE Construction Priced book (Gulf Business
books, second edition, and year 2000)
66Cost Estimation
- The comparison between GPI GPII
- GPI The Approximated Cost 124,800,000 Dhs
- GPII The Cost 121,932614 Dhs
Section A Site investigation Section B Site
Work Section C Concrete Work Section F Wood
Work Section G Thermal moisture
protection Section H Doors Section J
Finishing's Section P Conveying systems
67(No Transcript)
68Site investigation
69Site work
70Reinforced concrete work
71Cladding
72Finishing's
73Gantt Chart
74Tanks for listening