Title: True Vikings are back to Russia
1 True Vikings are back to Russia
- Gunnar Ingi Gunnarsson
- Chairman of the Board
2Successful business partnership services of the
new companyADDISON Ltd.
3Our Luggagefrom Iceland
Varied ExperienceA strong Networking TeamHigh
Technical StandardHigh Level of Service
4Why cooperate with Icelandic companies?
- Iceland is a high tech society with new modern
infrastructure and high living standard - 25 years of continuous experience utilising hydro
and geothermal energy with all necessary
transmission lines and substations - Iceland has a population of 300.000. Therefore
we are not a threat to anyone - But we have the knowledge you may need
5Addison EngineeringOwners background
140 Employees Design of OHTL Civil
Engineering Software Solutions
65 Employees Design of Power Plants,
Substations Cable Projects
15 Employees Design of OHTL, Control Cable
Projects
2000 Employees Contractor of Up-to-date Power
Solutions
6From idea to reality
- 2000 The business idea comes up
- 2003 Analyses of the Russian market
- 2004 Official business delegation
- 2005 Lot of candidates, evaluation
process - 2005 Partner founded
- 2006 Company establishment process
- 2007 Company in operation
7Journey with reliable PartnerCulture Business
Russia
Ukraine
Kazakhstan
8Addison EngineeringServices
- OHTLs Software solutions
- Substations GIS AIS
- Cable Design Special Solutions
- Project Management and Supervision
- Power Plant Design
- Environmental Business Studies
9Addison EngineeringOverhead Power Lines
- Modern design using best
available software - Design using Russian
Standards - Saving of up to 35 of steel
- Work on difficult projects
10Modern Design-Facts from Example
- Saving of up to 25 tons of Steel per Tower of
2x400 kV and 2x220 kV 33 km long OHTL - Total saving in steel 1400 t.
- Total saving in expenses 1,73 million
- Emission savings during production 370 t of
CO2. 146 t of Oil - Saving in labor costs at all stages and
transportation - Better use of resources
11Bosphorus Strait Crossing
- Tender and Detail Design
- Contractor
- Statnett Entreprenör, Norway
- 4 x 400 kV
- Conductors
- Aluminium Alloy/Steel
- Pbreak 850 kN
1881 m
165 m
730 m
63 m
12Addison EngineeringSubstation Design
- Gas Insulated Switchgear (GIS) vs. Air Insulated
Switchgear (AIS) - Indoor substation vs. outdoor substation
- Space savings
- More secure against vandalism
- Save operation
13Sultartangi245 kV GIS Substation
- GIS indoor station
- Seven 245 kV switchgear bays
- Double busbars with a transfer busbar
- Modern protection
14Karahnjukar245/145 kV GIS Substation
- GIS indoor substation
- Eleven 245kV switchgear bays
- Five 145 kV switchgear bays
- Two 245/145 kV inter- connection transformers
15Addison EngineeringCable Design
- High voltage overhead lines vs.high voltage
cables up to 400 kV - In tunnel or in ground
- Solution for environmental conflict
- Space savings
16NesjavellirGeothermal Power Plant
- Electrical capacity 120 MWe in 4 units
- Thermal capacity 400 MWt
17KarahnjukarHydro Power Plant
- Installed capacity 690 MW in 6 units
- Gross head 600 m
- 73 km of tunnels
- 57 km2 reservoir
18Russia todayThinking about tomorrow ?
- Rich Country of Oil and Gas
- Limited resources negative for the nature
- It takes 25 years to change to other carriers
- Actions needed today
19Addison EngineeringTogether we make it
- Varied Experience and Training Opportunities
- A strong Networking Team
- High Technical Standard
- International Experience
- Brilliant Business Ideas
- Understanding of Individual needs
20Thank you