Nadcap Users Compliance and Audit Program NUCAP Tutorial - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Nadcap Users Compliance and Audit Program NUCAP Tutorial

Description:

NUCAP Approval indicates Nadcap compliance (and not an ... MTU Aero Engines. The Boeing Company. Alenia Aeronautica SpA. AIRBUS. Bombardier Aerospace ... – PowerPoint PPT presentation

Number of Views:900
Avg rating:3.0/5.0
Slides: 26
Provided by: prine
Category:

less

Transcript and Presenter's Notes

Title: Nadcap Users Compliance and Audit Program NUCAP Tutorial


1
Nadcap Users Compliance and Audit Program
(NUCAP) Tutorial
August 2009
2
NUCAP Program
  • Motivation/History/Objectives
  • Structure
  • Program Documents
  • Model
  • Audit Process
  • Temporary Deviations
  • NUCAP Approvals

3
What Is a NUCAP Certification?
  • NUCAP certification indicates that the
    Organizations Oversight System Ensures Its
    In-house Special Processes Are Nadcap Compliant
  • NUCAP Approval indicates Nadcap compliance (and
    not an accreditation by Nadcap) which may be
    accepted by Nadcap User Members as equivalent to
    Nadcap Accreditation
  • Before starting the NUCAP program verify your
    Customers will accept NUCAP approval in lieu of
    Nadcap accreditation
  • NUCAP is available to Nadcap User Members
  • Nadcap User Member is a company that
  • writes/specifies its own special process
    requirements for its own designs AND
  • uses the Nadcap process to audit and control its
    special processors.
  • These companies subscribe to Nadcap with an
    annual subscription fee and provide technical
    resources to appropriately participate in the
    Nadcap task groups.
  • Significant amount of their business comes from
    self-designs.
  • Typically, these companies hold design
    certifications (e.g. type certificate) from
    regulatory authorities like FAA, EASA, JAA and
    defense departments

4
Eligibility Requirements to Participate in the
NUCAP Program
  • NUCAP Applicant must be a Nadcap Subscribing User
  • Functional Quality System equivalent
    AS/EN/JISQ/9100, with an effective corrective
    action system and closure and corrective action
    through User oversight system (internal).

5
Motivation/Background
  • Develop an Industry Standard for Self-monitoring
    of special processes
  • Standardize and strengthen internal special
    process control by leveraging Nadcap intellectual
    property and lessons learned
  • Seek Industry Recognition for Nadcap Compliance
  • Raise internal special process compliance to
    industry standard
  • Raise credibility among suppliers regarding
    Users commitment to Nadcap.

6
History
  • January 2003 First Pilot Audit Conducted
  • July 2003 First Meeting of NUCAP Management
    Council (NuMC)
  • September 2003 PRI BOD Approves NUCAP Program
  • November 2003 Formal Release of NUCAP Program
    Documents (PD)
  • March 2004 First Approval Issuance
  • May 2005 Rev A of PDs Released
  • February 2006 Launched NUCAP Webpage
  • January 2007 NUCAP in eAuditNet
  • September 2007 Rev B of PD3000 PD3100 Released
  • December 2008 Rev C of PD3000 PD3100 Released
  • June 2009 Rev B of PD3001 Released

7
Objectives
  • The NUCAP Program is designed to meet the
    following objectives
  • Develop industry standard for special process
    audit program that assures Nadcap compliance.
  • Provide a consistent industry-managed approach to
    certification of Users internal special
    processes while meeting the intent of Nadcap
    accreditation.
  • Provide a mechanism for independent, objective
    and consistent analysis of process audit data.
  • Evaluate Users Internal Auditors and audit
    process to meet NUCAP Requirements per PD 3001.
  • NUCAP provides an advanced and uniform method for
    certification of captive special processes in
    accordance with industry standards and
    requirements.

8
NUCAP and Regulatory Compliance
  • Regulatory Compliance is still the responsibility
    of a Production Approval Holder
  • NUCAP supplements compliance verification
  • NUCAP is an additional self-imposed requirement
  • NUCAP standardizes internal special processes
    auditing requirements
  • NUCAP verifies through external agency that
    internal special process controls are compliant
    with Nadcap requirements
  • NUCAP coupled with Nadcap assures special
    processes to meet the same standards,
    irrespective of their source

9
Governance Administration
  • NUCAP Management Council (NuMC) is Responsible
    for Administration of the Program
  • Establishment of Program Requirements
  • Maintenance of Governing Program Documents
  • Oversight of Approval Process
  • Assignment of Review Teams
  • Approval Body for NUCAP

10
NUCAP Program Structure (in relation to Nadcap)
11
NUCAP Management Council Membership Status
Heroux Devtek Inc.
Rolls-Royce
Bombardier Aerospace
GE Aviation
The Boeing Company
AIRBUS
309th Maintenance Wing-Hill AFB
Raytheon Company
Spirit AeroSystems
Honeywell Aerospace
Eurocopter
SAFRAN Group
EADS-CASA
Vought Aircraft
Goodrich Corp.
Northrop Grumman Integrated Systems
MTU Aero Engines
Alenia Aeronautica SpA
Cessna Aircraft Company
BAE Systems MAS
DCMA
Rockwell Collins Inc.
12
Program Documents (PD)(located on the PRI
website at www.pri-network.org)
  • PD3000 Governance and Administration of a Nadcap
    Users Compliance and Audit Program
  • PD3001 NUCAP Auditor Selection, Approval and
    Training
  • PD3100 NUCAP Audit Criteria for Standard Internal
    Auditing Requirements for Nadcap Users

13
NUCAP Model
  • NUCAP Program
  • Functional Quality System Equal to or better
    than AS9100
  • Establishment of Equivalency of Auditors
  • Formalized Internal Special Process Audit System
    Compliant to Nadcap
  • Closure and Corrective Action through User
    Oversight System (Internal)

14
NUCAP Process Overview
Select Sites Processes for Verification Audits
User Applicant (Declare NUCAP Intentions)
Submit Site Matrix, Business Summary PQs for
Verification Audits
Schedule Audits/Assign Auditors
Review Team Approval
Audit Completed
PRI Technical Staff Review
Issue Approval
15
NUCAP Audit Types
  • Within the NUCAP program, the User Applicant
    undergoes two different types of audits
  • Headquarters Audit
  • Auditing to PD3100 by Quality System auditor
    encompassing the Users Internal Audit System.
  • Typically conducted after all of the Verification
    audits.
  • Verification Audits
  • A selection of sites and processes to be audited
    by Nadcap approved auditors (as approved by the
    Review Team), to ensure the effectiveness of the
    Internal Audit System.

16
Audit Process
  • Initial Steps to Be Taken by the User Applicant
  • Site Matrix Completion
  • Completion of Preliminary Questionnaires (PQ) for
    each Commodity Submitted (The PQs determine the
    scope length of each Verification audit)
  • Business Summary Submitted
  • Key Decisions (User needs to determine whether
    they want to chose Option A or Option B)
  • Option A
  • Use PRI auditors instead of internal auditors
    -All locations audited to all processes
    requested, with a 1-day Headquarters audit.
  • Option B
  • Use internal auditors for 100 of audits and PRI
    auditors for a sampling of the processes/sites
    (as determined by Review Team) to be audited with
    a 2-day Headquarters audit.

17
Status of NUCAP Audits
173
160
138
137
78
43
18
Audit Process
  • What Happens Prior to the NUCAP Audit
  • PRI User Applicant Schedule the Audit (s).
  • Checklists and Preparation Instructions available
    on eAuditNet.
  • Nadcap Customer Support Initiative (NCSI)- free,
    web-based training program.
  • Auditor conducts the audit

19
Audit Process
  • What Happens After The NUCAP Audit
  • The NUCAP Auditor will have an out-briefing
    meeting at the end of each audit day, as well as
    at the end of the audit to discuss any
    non-conformances (NCRs) that may have been
    issued.
  • The User will receive a copy of the NCRs, if
    any, from the auditor.
  • The NUCAP Auditor will submit the conducted audit
    to the appropriate Staff Engineer at PRI
    Headquarters within eAuditNet.

20
Audit Process
  • NUCAP Audit Review
  • The User will submit their initial and subsequent
    NCR responses to the appropriate Staff Engineer
    for review.
  • The Staff Engineer will review initial and
    subsequent responses for proper closure of the
    audits.
  • Staff Reviews Package for Completeness
  • Pen Ink Changes, Contact Auditors for
    Clarification.
  • All Questions Answered, N/As explained,
    Attachments noted, Non-conformances correctly
    completed.
  • Review Supplier Corrective Action
  • Close-Out or request additional information
  • All of the like commodity audit reports are
    submitted to the Review Team for approval.

21
Audit Process
  • NUCAP Approval
  • Once all of the verification audits have been
    approved by the Review Team, the HQ audit package
    including the following documents is submitted to
    the Review Team for final NUCAP Approval
  • The Review Team reviews the Audit Package and
    evaluates relevant data from the Headquarter
    Audit
  • The Review Team is comprised of at least three
    (3) voting NuMC User Reps, PRI Staff Team Leader
    and Non-Voting Applicant User Representative
  • Final certification is granted by the NUCAP
    Council (through the Review Team) upon acceptable
    closure of NCRs
  • Once approval has been granted, a Letter of
    Approval, Scope of Approval and Certificate of
    Approval will be given to the User.

22
Temporary Deviation
  • Definition A deviation from the Nadcap
    checklist requirements which do not violate
    engineering or customer contract requirements,
    permitting time for resolution between Nadcap and
    NUCAP applicants requirements.
  • A Temporary Deviation can be resolved one of two
    ways
  • The Applicant User can resolve the deviation
    internally (i.e. changing procedures, specs)
  • The Applicant User can request the Nadcap
    checklist be changed.
  • For deviations requiring Task Group resolution,
    the User shall complete a Deviation Form
    (n-frm-01, see attached) submit to PRI
  • The Headquarters Auditor will verify all
    deviations from prior audits are closed or an
    effective plan is being implemented for
    resolution.

23
NUCAP Webpage
  • The NUCAP webpage can be found on the PRI website
    at http//www.pri-network.org
  • The webpage houses the following information
  • Approved User List (AUL)
  • Program Documents (PD3000, PD3100 PD3001),
    Site Matrix, Preliminary Questionnaires, NUCAP
    Tutorial, etc.
  • Events Page with links to the online registration
    for the meeting and a link to the SAE Forums page
    under Agendas Minutes.
  • Links to Media Articles / News Releases

24
NUCAP Approved Users(Approved User Listing (AUL)
is posted on the PRI Website at
www.pri-network.org)
  • Honeywell Aerospace
  • Vought Aircraft
  • Rolls-Royce plc
  • Bombardier Inc.
  • Alenia Aeronautica SpA
  • EADS-CASA
  • EADS Deutschland GmbH
  • Eurocopter
  • Premium AEROTEC GmbH
  • Hispano-Suiza (SAFRAN Group)
  • Rolls-Royce Corporation
  • MTU AeroEngines
  • Spirit AeroSystems
  • Aircelle (SAFRAN Group)
  • Messier-Dowty (SAFRAN Group)
  • Messier-Bugatti (SAFRAN Group)
  • Snecma (SAFRAN Group)
  • Ceramic Coating Center (SAFRAN Group)
  • Liebherr-Aerospace GmbH

Users Currently In-Process BAE Systems (MAS) and
Airbus Deutschland
25
(No Transcript)