Afghanistan Region Update - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Afghanistan Region Update

Description:

Planning infrastructure requirements for possible future surge or troop reductions ... Drawdown in conjunction with maintaining current level of support ... – PowerPoint PPT presentation

Number of Views:81
Avg rating:3.0/5.0
Slides: 9
Provided by: anthonya8
Category:

less

Transcript and Presenter's Notes

Title: Afghanistan Region Update


1
Afghanistan Region Update
2
Agenda
  • OCONUS future customer challenges
  • Northern Ground Line of Communication (NGLOC)
  • Other topics

3
OCONUS Future Customer Challenges
  • Planning infrastructure requirements for possible
    future surge or troop reductions
  • Road closures
  • Modeled various scenarios to determine
    capabilities
  • Landing rights
  • Short and medium term infrastructure solutions
  • Drawdown in conjunction with maintaining current
    level of support
  • A drop in head count may not have direct
    correlation in terms of infrastructure
    requirements

4
Northern Ground Line of Communication (NGLOC)
  • Test of one 40-ft container of MREs
  • From Marengo IN on 10 Jun 2008
  • Moved via DTS but looked commercial
  • Warehouse USDA inspected
  • Intense documentation
  • Container held in Gioia Tauro IT
  • 24 days due to port congestion in Poti DE
  • Container arrived in Poti DE 7 Aug 2008
  • 8 Aug 2008 Russian/Georgia conflict
  • Container submitted for humanitarian relief

5
NGLOC A Look Ahead
  • Subsistence prime vendor conducting a commercial
    test of 3 trucks
  • From Germany and Austria
  • Began end of Aug 2008
  • Normal transit set at 22 days
  • Held at Afghanistan border
  • Latest update?

6
Other Topics
  • Public Key Infrastructure STORES
  • Certificates will be required for
  • STORES Web
  • RECON Tool
  • Market Ready Invoice Tool
  • Requires CAC or External Certificate Authority
    (ECA)
  • Affects
  • Subsistence personnel, customers and vendors
  • Do all you can to comply
  • You will have access while you obtain ECA

7
Other Topics
  • Locking fields in STORES
  • STORES 3.8 field locking logic for
  • Vendor item description
  • Package size
  • Package unit of measure
  • Packaging code
  • In preparation for CFMS
  • Requires new 832 transaction set
  • There is time to comply

8
Questions?
Write a Comment
User Comments (0)