2Contents
- Existing Approved Planning Permission
- Updated Proposals May 2002
- Updated proposals August 2002
- Draft Revised Planning Application
- Optional Activities
- Programme
3Existing Approved Planning Permission
Original Planning Application September
2001 Application 01/1504/FUL
4Updated Proposals May 2002
- Illustrative drawings showing Options for the
site
5Illustrative drawing 1
6Illustrative drawing 2
7Illustrative drawing 3
8Updated proposalsAugust 2002
9Cost Estimates by Zone
10Overall Costs
11Third Party Income Proposals
12Third Party Income generation by Zone
13Draft Revised Planning Application Proposed
Contents
- Terrace level site plan
- Embankment level plan
- Elevations of Third Party pavilions
- Illustrative plan showing variations
14Terrace level site plan showing Third Party
areas and modified hard and soft landscaping
15Embankment level plan showing community/ low
rental accommodation
16Elevations of Third Party pavilions
17Illustrative plan showing variations from
existing Permission
18Optional Activities
- Open Space, benches,grass, and play area
- Bio-diversity Gardens
- Café/Bar facilities
- Community Use Spaces
- Arts/performance arena
- Accommodation for Riverside uses
- Water feature
- Market stalls and kiosks
- Camera Obscura/ Twickenham Viewing Eye
- Viewing Platforms
- Extension to Twickenham Museum
- Temporary Ice Rink
19Programme
- Construction programme 15 months
- Phased programme option
- Phase One plan for early public access
20Minimum Intervention Bio-Diversity Option
21Cost Options
22Construction Programme
23Benefits
- Retains the land in public use
- Provides open space available for everyone to use
- Options for future development, in line with
public use, are not predicated by the scheme - Flexible uses to accommodate, local charities,
art and community groups - Generates income to cover the cost of maintaining
the site - Staged Implementation, site can be quickly opened
for public use - Regeneration of the site for family use
- Preserves Thames-side village characteristics
- Self sustaining and self managed scheme
24Year 1 Expenditure
25Annual Income at Year 5
26Cash Flow ForecastShowing (in blue) excess of
income over expenditure as a percentage of total
cash flow
27Cash Flow ForecastShowing income, expenditure
and net cash flow as an actual value
28The end