Submission to: - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

Submission to:

Description:

Updated Proposals for the Twickenham Riverside Terrace Public Garden ... Flexible uses to accommodate, local charities, art and community groups ... – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 29
Provided by: samanth58
Category:

less

Transcript and Presenter's Notes

Title: Submission to:


1
Submission to
  • The Cabinet
  • London Borough Richmond upon Thames
  • August 2002
  • Updated Proposals for the Twickenham Riverside
    Terrace Public Garden
  • Twickenham Riverside Terrace Garden Group
  • PO Box 378 TW2 5BW

2
Contents
  • Existing Approved Planning Permission
  • Updated Proposals May 2002
  • Updated proposals August 2002
  • Draft Revised Planning Application
  • Optional Activities
  • Programme

3
Existing Approved Planning Permission
Original Planning Application September
2001 Application 01/1504/FUL
4
Updated Proposals May 2002
  • Illustrative drawings showing Options for the
    site

5
Illustrative drawing 1
6
Illustrative drawing 2
7
Illustrative drawing 3
8
Updated proposalsAugust 2002
  • Scope Cost Estimates

9
Cost Estimates by Zone
10
Overall Costs
11
Third Party Income Proposals
12
Third Party Income generation by Zone
13
Draft Revised Planning Application Proposed
Contents
  • Terrace level site plan
  • Embankment level plan
  • Elevations of Third Party pavilions
  • Illustrative plan showing variations

14
Terrace level site plan showing Third Party
areas and modified hard and soft landscaping
15
Embankment level plan showing community/ low
rental accommodation
16
Elevations of Third Party pavilions
17
Illustrative plan showing variations from
existing Permission
18
Optional Activities
  • Open Space, benches,grass, and play area
  • Bio-diversity Gardens
  • Café/Bar facilities
  • Community Use Spaces
  • Arts/performance arena
  • Accommodation for Riverside uses
  • Water feature
  • Market stalls and kiosks
  • Camera Obscura/ Twickenham Viewing Eye
  • Viewing Platforms
  • Extension to Twickenham Museum
  • Temporary Ice Rink

19
Programme
  • Construction programme 15 months
  • Phased programme option
  • Phase One plan for early public access

20
Minimum Intervention Bio-Diversity Option
21
Cost Options
22
Construction Programme
23
Benefits
  • Retains the land in public use
  • Provides open space available for everyone to use
  • Options for future development, in line with
    public use, are not predicated by the scheme
  • Flexible uses to accommodate, local charities,
    art and community groups
  • Generates income to cover the cost of maintaining
    the site
  • Staged Implementation, site can be quickly opened
    for public use
  • Regeneration of the site for family use
  • Preserves Thames-side village characteristics
  • Self sustaining and self managed scheme

24
Year 1 Expenditure
25
Annual Income at Year 5
26
Cash Flow ForecastShowing (in blue) excess of
income over expenditure as a percentage of total
cash flow
27
Cash Flow ForecastShowing income, expenditure
and net cash flow as an actual value
28
The end
Write a Comment
User Comments (0)
About PowerShow.com