THINK Connect the dots using four lines and not taking your pencil off the paper. - PowerPoint PPT Presentation

1 / 35
About This Presentation
Title:

THINK Connect the dots using four lines and not taking your pencil off the paper.

Description:

THINK Connect the dots using four lines and not taking your pencil off the paper. – PowerPoint PPT presentation

Number of Views:97
Avg rating:3.0/5.0
Slides: 36
Provided by: lancej
Category:

less

Transcript and Presenter's Notes

Title: THINK Connect the dots using four lines and not taking your pencil off the paper.


1
THINK Connect the dots using four lines and not
taking your pencil off the paper.
2
Answer We must Think outside the box
3
1-5 Year Capital Development Plan
  • Restore the Core and Plan for the Future
  • Robert T. Ungaro - Dir. Of Operations.
    Maintenance.
  • Lake Park High School District 108
  • John Conlon - FacilityTree
  • Rich Bubula Director of Buildings Grounds
    Downers Grove School District 58

4
Where To Start?
  • Ask Questions
  • Seek/Research Information
  • Compile Information
  • Interpret Information
  • Present Information

5
Ask Questions
  • History of the District
  • Staff Members
  • Board Members
  • Parents
  • Prior Employees
  • Peers of Neighboring Districts
  • Community
  • Municipality
  • Architect
  • Vendors

6
Seek/Research Information
  • Life Safety Surveys
  • ROE
  • Architect
  • Plat of Surveys
  • Deeds
  • Building Plans
  • Additions
  • Remodeling
  • Inspection Reports
  • AHERA (Asbestos)
  • Boilers
  • Bleachers
  • Playgrounds
  • Insurance reports
  • Asset Reports
  • Past Strategic Plan
  • Past Facility Plans
  • Developer Plans

7
Life Safety Survey
  • What is the need for the survey
  • Meets state mandate
  • Yearly Survey
  • Safety concerns
  • Ten Year Survey
  • Very detailed
  • Provides opportunity to get funding

8
Life Safety Results East Campus
9
Life Safety Results West campus
10
Life Safety Results Totals
11
Plat of Survey
  • What does a Plat of Survey tell you
  • Property lines
  • Size of Property
  • Property Description and Pin Number
  • Find out who your neighbors are
  • Location of utilities
  • Electrical
  • Natural Gas
  • Water and Sewer
  • Telephone and Cable
  • Location of all buildings on site
  • Right of Ways

12
Deeds
  • What does a Deed tell you
  • The original property owner
  • Who else owned the property
  • Property description itself
  • Pin Number

13
Building and Addition Plans
  • When the buildings where built
  • How they where constructed
  • Construction Bid Documents
  • What type of materials used
  • What was specified
  • Way it is to be built
  • Who was the architect/contractor/engineer
  • When additions where done
  • As-built drawings very important

14
Inspection Reports
  • Asbestos
  • Original Management Report and Inspection
  • Six Month Inspection
  • Three Year Inspection
  • Boilers
  • Type used
  • Steam
  • Hot Water
  • Pressure rating
  • Capacity
  • Manufacture and Model/Serial Number
  • Inspection due date

15
Inspection Reports
  • Bleachers
  • Inside and Outside
  • Age
  • Type
  • Seating Capacity
  • Condition
  • Playgrounds
  • Type
  • Age/Weight Capacity
  • Condition

16
Other Reports
  • Insurance Reports
  • Claims
  • Inspections
  • Asset Reports
  • Inventory/Bar Code
  • Values
  • Past Strategic Plan
  • Do you have one?
  • Past Facility Plans
  • What was done? What needs to be finished? Does it
    need to be updated?
  • Developer Plans
  • Whats happening around you
  • How will the devolvement effect you
  • When is it going to happen because it will

17
Compile Information
  • Committee formed to analyze and organize the
    information
  • 10-year Life Safety Survey
  • Strategic Plan
  • Facilities
  • Finance
  • Curriculum
  • Administration
  • Technology
  • Staff Development
  • Facilities Plan
  • Enrollment
  • Total Number of Staff Members
  • Demographic Study
  • Survey to Staff, Survey to Parents, Survey to
    Community
  • Time Line
  • Inspections
  • Miscellaneous Reports

18
Interpret Information
  • Take the data and formulate into a plan
  • Understand the plan needs to be flexible
  • Anticipate the unusual
  • Funding will effect its outcome
  • Board of Education needs involvement
  • Community input can change the course of action

19
East Campus Other Project Needs/Wants
  • Communication In Classrooms
  • Call Buttons or Telephones
  • Call Buttons 40,423
  • Phone System 200,000
  • Two New Score Boards In Gym
  • 10,500
  • Seal Coat and Re-stripe Parking Lots
  • 30,625
  • Replace East Balcony Railing
  • 17,500
  • Roof Ladders
  • 28,000
  • Total327,048
  • Remodeling of Food Labs
  • 50,000
  • New Softball Scoreboard
  • 5,000
  • New Softball Press Box
  • 60,000
  • Total143,000

20
West Campus Other Project Needs/Wants
  • Redo Tennis Courts
  • 150,000
  • Communication In Classrooms
  • Call Buttons or Telephones
  • Call Buttons 40,423
  • Phone System 200,000
  • Roof Ladders
  • 12,000
  • Replace Football Scoreboard
  • 16,450
  • Concession Stand Enlarged
  • 50,000-75,000
  • Total241,450
  • Remodel Auditorium
  • 2,660,000
  • Build Auditorium Entrance/Lobby
  • 663,750
  • Replace Field House Floor
  • 318,450
  • New Baseball Concession Stand and Press Box
  • 125,000
  • Total3,779,200

21
Educational Service Center Other Project
Needs/Wants
  • New Furnaces 20,000
  • New Carpeting
  • Lunch Room Remodeled 4,000
  • Painting 5000
  • New Lighting 8000
  • Seal Coat and Stripe Parking Lot 5,000
  • Total
  • Sell Existing Building Value()
  • Lease Space (/sq/ft) yearly cost
  • Building New Building
  • Add on to East or West Campus 2,000,000

22
Butler Building Other Project Needs/Wants
  • Operations and Maintenance East and West Combined
  • Grounds Equipment 35,000
  • Truck 40,000
  • Total75,000
  • Operations and Maintenance East and West Combined
  • Trucks
  • Two Pickups/plows 40,000
  • Trailer
  • For Skid Loader and Tractors 7,000
  • Heavy Duty Equipment
  • Skid Loader 20,000
  • Forklift 20,000
  • Grounds Equipment
  • 100,000
  • Total187,000

23
Rich Bubula (Five Year Plan)
24
Funding Mechanisms
  • Working Cash
  • Capital Improvement Fund/Life Safety Fund
  • Operations and Maintenance Fund
  • Non-Referendum Bonds
  • Referendum

25
Present Information
  • Present to the District Administration
  • Union Representatives
  • All Staff
  • Board of Education
  • Community
  • Use whatever Media means you can
  • District Newsletter
  • School Newspaper
  • Internet
  • News Media

26
Software Board Perspective
  • It is your Information your Responsibility
  • Owner Mentality
  • Increase Efficiencies
  • Operations Incorporate into daily
    activities/process
  • Contractors
  • Vendors/Contractors on the Team
  • They feed / supply your data
  • Use their expertise
  • Eliminate Surprises / Allocate Funds

27
Software Feature Web Native
  • Access Anywhere Anytime
  • Easy Intuitive User Buy In
  • Contractor Vendor

28
Software Feature Drawings
  • Drawing Management
  • Master Drawing for Operations
  • As Built
  • Authoritative
  • Used for Operations

Drawing Layers
29
Software Feature CMMS
  • Assets
  • Work Orders
  • Preventive Maintenance

30
Software Feature Inspections
  • Flexibility
  • District Analysis
  • Set UP according to your needs

31
Software Feature Inspections
  • Benjamin SD 25

32
Software Feature Inspections
  • Benjamin SD 25
  • Inspections
  • Calendar

33
Software Feature Inspections
  • Key Data to Collect
  • Condition
  • Priority
  • Repair Cost
  • Date
  • Comments
  • Work Order
  • Ability to Analyze Edit

34
Software Feature Data
  • Reporting to Build Plan
  • Exportability
  • Asset vs. Items

35
Questions
  • ?
Write a Comment
User Comments (0)
About PowerShow.com