BARGE DRAFTING TECHNOLOGY PROJECT Milestone 3A. Asoodeh & Associates St. James Stevedoring ... We need to test the system on a barge ... – PowerPoint PPT presentation

Number of Views:110
Avg rating:3.0/5.0
Slides: 27
Provided by: mikeas
Category:

less

Transcript and Presenter's Notes

Title: BARGE DRAFTING TECHNOLOGY PROJECT Milestone 3A


1
BARGE DRAFTING TECHNOLOGY PROJECT Milestone 3A
Asoodeh Associates St. James
Stevedoring
2
Progress Report
  • Although we have made much progress since our
    last meeting, we have also encountered a few
    difficulties with using the four boxes
    simultaneously.
  • Many of the difficulties have been resolved, but
    we need to make a few more improvements to
    stabilize the system.

3
Progress Report
4
Progress Report
5
Progress Report
6
Progress Report
7
Progress Report
8
Progress Report
9
Progress Report
10
Progress Report
11
Accuracies Achieved
  • As the next few slide will demonstrate, we are
    able to achieve accuracies, which are not
    possible with the current measuring techniques
    used by SJS or surveyors.
  • Although we are displaying the results to
    accuracy of an inch, we are actually gathering it
    to one tenth of an inch, and could increase that
    to one hundredth of an inch.

12
Accuracies Achieved
13
Accuracies Achieved
14
Accuracies Achieved
15
Accuracies Achieved
16
Accuracies Achieved
17
Accuracies Achieved
18
Accuracies Achieved
19
Accuracies Achieved
20
Accuracies Achieved
21
Accuracies Achieved
22
Accuracies Achieved
23
Accuracies Achieved
24
Accuracies Achieved
25
Whats Next
  • We need to test the system on a barge
  • We need to complete the system software, after
    further findings
  • We need to complete the fifth box based on
    findings
  • Test the entire system before final installation
    and delivery.

26
Timeline
  • Finish this phase by the end of July
  • Provide training and allow SJS testing in early
    to mid August
  • Deliver system in mid August
  • 30-day testing and support through mid September