Toy Airplane Manufacturing - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Toy Airplane Manufacturing

Description:

Travel in batches of 24 using AGVs. 8 hours of production in one day ... Batches consist of similar plane type. Operation times are the same for each plane ... – PowerPoint PPT presentation

Number of Views:343
Avg rating:3.0/5.0
Slides: 13
Provided by: UMD9
Category:

less

Transcript and Presenter's Notes

Title: Toy Airplane Manufacturing


1
Toy Airplane Manufacturing
  • Ted Pelzer
  • Todd Madole
  • Christian Mickelson

2
Outline
  • Problem statement
  • Assumptions
  • Deterministic Modeling
  • As-is model
  • To-be model
  • Best solution

3
Problem Statement
  • A toy company produces 3 types of planes
  • Expected demand increase of 30
  • Travel in batches of 24 using AGVs
  • 8 hours of production in one day
  • Determine the total machines, AGVs and operators
    required

4
Given Data
5
Assumptions
  • Ignored statistical outliers
  • Move times determined speed and distances
  • Batches consist of similar plane type
  • Operation times are the same for each plane
  • Any retooling is assumed in operation time
  • Number of operators must equal number of machines

6
Deterministic Modeling
  • (Assuming worst case scenario for operation
    times)
  • Processing Time Total Planes Total minutes
    required
  • Total Minutes required /Total time in day Total
    Machines needed
  • Cutter
  • .35 min 4300 planes 1505 minutes required
  • 1505/480 3.1 machines gt 4 Cutting machines

7
As-Is Model
8
As-Is Model
  • Every 30 minutes a Die Casting machine needed to
    be serviced
  • Repair time is N(8,2)

9
AGV Analysis
  • Analyzed AGV path networks
  • Both needed 3 AGVs

10
To-Be
  • Demand increase of 30

11
Best Model
  • Reduce downtime to every 120 minutes
  • Percent Yield Increased to 3-Sigma
  • Reduced scrap from 805 to 63 planes

12
Conclusion
  • Implement the creative solution if possible.
  • Increasing the efficiency
  • Reducing the overall number of machines in the
    facility and increasing quality will
  • Reduce machine costs
  • Reduce workforce costs
  • Reduce material costs
  • Reduce WIP
Write a Comment