Review of Recommended Plans. Probable Cost Estimate and Construction Schedule ... Sandra Beckham John Bennett David Bridwell Joann Day Joe Day Bonnie Holmes Jim ... – PowerPoint PPT presentation

Number of Views:78
Avg rating:3.0/5.0
Slides: 26
Provided by: yvonne96
Category:

less

Transcript and Presenter's Notes

Title: Report to the Congregation


1
Report to the Congregation June 18, 2006
2
  • Agenda
  • Planning Process
  • Review of Recommended Plans
  • Probable Cost Estimate and Construction
    Schedule
  • The Next Step - Feasibility Study
  • Question and Answers

Report to the Congregation June 18,
2006
3
Trinity Presbyterian Church 2008????
Report to the Congregation June 18,
2006
4
  • Planning Process
  • Assembling a Team
  • Building Committee
  • Sandra Beckham John Bennett David Bridwell Joann
    Day Joe Day Bonnie Holmes Jim King Barrie
    Heinzenknect
  • Rick Sumerel Tami Wall

Report to the Congregation June 18,
2006
5
  • Planning Process
  • Assembling a Team
  • Architect Freeman and Major
  • Allen Freeman
  • Douglas Rackley
  • Contractor - SYS Constructors
  • Jeff Gilstrap

Report to the Congregation June 18,
2006
6
  • Planning Process
  • Assembling a Team
  • Excellent Leadership
  • Pastor Bob Jones
  • Pastor Marc Mason
  • Session

Report to the Congregation June 18,
2006
7
  • Planning Process
  • Gathering Input
  • Committee Discussion
  • Church Survey
  • Listening Sessions
  • Visits to other Churches

Report to the Congregation June 18,
2006
8
  • Planning Process
  • What are our Facility Needs?
  • Educational Space Outdoor Gathering Space
  • Fellowship Space Appealing Front Door
  • Recreational Space More Cohesive Plan
  • Larger Sanctuary Additional Parking

Report to the Congregation June 18,
2006
9
  • Planning Process
  • Master Planning Effort Long Term Plan
  • Assessment of Current Facilities
  • Physical Condition, Major Maintenance Needs
  • Functional Use of Space?
  • Quality of Space

Report to the Congregation June 18,
2006
10
  • Master Site Plan
  • 25 Year Plan
  • New Larger Sanctuary
  • Fellowship Hall
  • Family Life Center
  • Education Building
  • Sanctuary/Classrooms

Report to the Congregation June 18,
2006
11
  • Phase 1 - Site Plan
  • Family Life Center
  • Education Building
  • Covered Dropoff
  • Outdoor Gathering Spaces
  • Additional Parking (Lighted)
  • New Front Entry

Report to the Congregation June 18,
2006
12
(No Transcript)
13
Phase I Floor Plan
Report to the Congregation June 18,
2006
14
Phase I Floor Plan Upper Level Education
Report to the Congregation June 18,
2006
15
Phase I Floor Plan Upper Level Education
  • 5 Classrooms
  • Toddlers/Crib Area
  • Childrens Assembly
  • Adult Choir Area
  • Restrooms
  • Elevator

Report to the Congregation June 18,
2006
16
Phase I Floor Plan Lower Level Education
Report to the Congregation June 18,
2006
17
Phase I Floor Plan Lower Level Education
  • 5 Classrooms
  • Childrens Choir
  • Assembly/Play Area
  • Covered Play Area
  • Restrooms
  • Elevator
  • Outdoor Playground

Report to the Congregation June 18,
2006
18
Phase I Floor Plan Upper Level Family Life
Center
Report to the Congregation June 18,
2006
19
Phase I Floor Plan Upper Level Family Life
Center
  • Family Life Center
  • Stage/Gym
  • Kitchen/Serving Area
  • Library
  • Parlor
  • Gathering Space
  • Restrooms
  • Elevator
  • Outdoor Playground

Report to the Congregation June 18,
2006
20
Phase I Floor Plan Lower Level Family Center
Report to the Congregation June 18,
2006
21
Phase I Floor Plan Lower Level Family Center
  • Youth Assembly/Rec. Area
  • Sr. High Classroom
  • Jr. High Classroom
  • Additional Classroom Space
  • Covered Porch

Report to the Congregation June 18,
2006
22
Phase I - Elevations
Report to the Congregation June 18,
2006
23
Phase I Cost Estimate and Schedule
  • Costs
  • Probable Project Cost - 6,000,000
  • Includes Furniture and Equipment
  • Sound System
  • Contingency and Escalation
  • All associated Fees
  • Schedule
  • 3 Months to Complete Design
  • 12 to 14 Month Construction Schedule

Report to the Congregation June 18,
2006
24
The Next Step Feasibility Study
Report to the Congregation June 18,
2006
25
Questions