APEX Overview - PowerPoint PPT Presentation

About This Presentation
Title:

APEX Overview

Description:

worked well, measured betas at all IP's ( talk Mei) ... Local beta* squeeze (Brahms) IR corrections: skew sextupole. JET optical emittance measurement ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 24
Provided by: cad53
Learn more at: https://www.c-ad.bnl.gov
Category:
Tags: apex | betas | overview

less

Transcript and Presenter's Notes

Title: APEX Overview


1
APEXOverview
  • Fulvia Pilat

APEX Workshop Science Education Center, November
2-3 2006
2
Outline
  • Goals (recall)
  • Run-6 Stats and studies
  • Program organization issues
  • AEAC grading system
  • (intentional) beam loss WEB form OPM 2.11
  • APEX end effects (injectors, back2physics)
  • explicit beam requests
  • APEX spin-off
  • operations, publications
  • Preparation for Run-7
  • program, proposals, AEAC, priorities

3
APEX goals, recall
  • GOALS
  • Improve machine performance (longer time scale
    than now machine performance) - Class1
  • support ERTAF, RHIC upgrades (RHIC-II, eRHIC)
  • Development of beam diagnostics techniques
  • Inter-lab collaborations
  • Class 2 experiments general accelerator physics
  • or for other projects (strictly none so far, WF
    will discuss
  • one proposal)

4
APEX statistics
  • Run-5 Cu 9 (7 HE 2 LE) physics weeks
  • Run-5 PP 10 physics weeks
  • Run-6 PP 13 physics weeks

5
APEX Run-6 1
  • Studies focused on BPMs
  • Beam-based alignment (Niedziela, Satogata)
  • full data set taken, analysis in progress
  • Orbit response matrix (Satogata, Niedziela)
  • full data set taken, analysis done (?talk
    Todd)
  • Auto-trigger vs. fixed trigger (Michnoff) (?talk
    Rob)
  • tests

6
APEX Run-6 2
  • Operations related
  • Beam-based sextupole polarity check (Luo)
  • worked well, checked all sextupoles
    (operational now)
  • Optics measurements with AC dipole (Bai)
  • worked well, measured betas at all IPs
    (?talk Mei)
  • Comparison rotator settings with model (MacKay)
  • verification of rotator model
  • Rotators at injection (MacKay)
  • established possibility of ramping rotators to
    1/2 current a injection if needed
    (?talk Waldo)

7
APEX Run-6 3
  • Nonlinear dynamics
  • Measured 2nd order chromaticity (Tepikian et al)
  • operations now ( ? talk Yun)
  • Measured skew chromaticity (? talk Steve)
  • 2/3 resonance measurement and correction at
    injection (Bengtsson, Luo et al)
  • use driving terms, difficult so far (?talk
    Johann)
  • Operational 2/3 resonance correction (Calaga, et
    al)
  • look at beam decay directly worked in yellow
    but not consistently

8
APEX Run-6 4
  • Instrumentation and developments
  • Calibration tune, emittance and chromaticity
    measurements (Cameron, Connolly, Brown, etc.)
  • RF phase modulation chromaticity measurement and
    calibration (Cameron et al) did not work well
  • BTF and BBTF measurements with BBQ (Cameron)
  • ?operational now (?talks Wolfram, Peter)
  • PS balancing (Cameron, Schultheiss)
  • in progress (? talk Peter)

9
APEX Run-6 5
  • PS ripple (Brown with Schottky, Cameron with BBQ)
  • effort started with LF Schottky
  • with BBQ measured an effect at the 10-4 level,
    considerably larger than expected (?talk Kevin)
  • Stochastic cooling preparation (Brennan,
    Blaskiewicz)
  • kicker alignment, etc. ?continued in operations
  • 10 Hz orbit feedback (Montag)
  • continuing in development (?talk Christoph)

10
APEX Run-6 6
  • Beam-beam
  • Long range beam-beam (Fischer et al)
  • goal establish feasibility of long range
    beam-beam measurements for compensation (LARP)
    not trivial to measure (? talk Wolfram)
  • Beam-beam, only 1 IP (Montag et al)
  • relevant for operations and eRHIC plans
  • repeated, consistent dependence of beam lifetime
    with intensity of incoming beam

11
APEX Run-6 7
  • SPIN studies
  • Snake resonances (Bai et al)
  • Completed, study of snake resonances in blue and
    yellow. Interesting results. (? talk Mei)
  • Spin tune measurements (Bai et al)
  • attempted a few times because of technical
    glitches
  • measurement done (? talk Mei)
  • Polarization vs. source polarization (Huang,
    Zelenski)
  • (? talk Haixin)
  • Spin decoherence (MacKay)
  • experiment rescheduled for next year (? talk
    Waldo)

12
APEX Run-6 8
  • High intensity studies (Zhang Huang)
  • E-cloud, emittance
  • (?Talk SY)

13
Organizational issues
  • Review and prioritization criteria (AEAC)
  • Studies with intentional beam loss
  • WEB form OPM 2.11
  • APEX end effects (injectors, back2physics)
  • explicit beam requests add detailed request for
    beam conditions in the scheduling for APEX to
    allow for optimum operation support

14
AP Experiment Categories (old)
  • Class
  • 0 likely to immediately benefit RHIC
    machine performance, or crucial to RHIC hardware
    decision making
  • 1 directly benefiting RHIC machine
    performance
  • 2 benefiting general accelerator
    community
  • Priority
  • A a) benefiting RHIC operation b)
    well prepared and c) likely to succeed
  • B has at least two of the above
  • C has at least one of the above
  • D has none of the above
  • NEED TO STREAMLINE THIS ? AEAC Committee
  • Peer review in place
  • APEX Experiments Workshop
  • APEX Weekly Meeting

15
AP Experiment Categories (new)
  • Class
  • 0 likely to immediately benefit RHIC
    machine performance, or
  • crucial to RHIC hardware decision making
  • 1 directly benefiting RHIC machine
    performance
  • 2 benefiting general accelerator
    community
  • Priority
  • A MUST DO
  • B Recommended
  • C Considered
  • D Declined
  • Priority is assigned by AEAC Committee
  • The AEAC will not distribute a written record of
    deliberations, only the final outcome. However it
    will be available to discuss the outcome if
    requested by the experiment spokespersons

16
Studies with intentional beam loss
  • On the APEX form
  • Revised (APEX) OPM 2.11, approved now ? read and
  • acknowledge by ALL experimenters

Field to input the observation/authorization from
RSC Chair
Beavis, or
After the experiment
spokesperson
17
APEX End effects
  • Before maintenance days
  • injectors will go offline at 6AM
  • Ramp will be reverted and systems reset just
    after APEX
  • APEX experimenters are responsible to leave the
    system operational, and will be available for
    consultation if needed when operations are
    restored after maintenance
  • On non maintenance days
  • 1 h will be allocated (as always) for back to
    physics operations
  • Before the end of the run
  • APEX will present earlier an explicit end-plan
    with priorities (request from Retreat)

18
APEX Spin-offs
  • Run1-Run3
  • IR corrections skew quadrupole (IR coupling)
  • Chromaticity measurement on the ramp, radial
    wigglePLL
  • Octupoles around transition
  • PLL, feedback, high resolution tuning
  • Tune scans in collision ? working points
  • Run-4
  • IR corrections (across IR, sextupole, octupole)
  • Tune scans (store, injection) ? working point
  • AC dipole, optics measurements (coupling in
    progress)
  • Pressure rise ? confirm NEG pipes, solenoids
  • Beta squeeze ? beta85-90cm in Phenix, Star
  • Decoupling via skew modulation

19
APEX Spin-offs
  • Run-5
  • Decoupling on the ramp
  • AC dipole (coupling)
  • Local beta squeeze (Brahms)
  • IR corrections skew sextupole
  • JET optical emittance measurement
  • BBQ developments
  • stochastic cooling
  • Run-6
  • Sextupole polarity checks
  • 2nd order chromaticity
  • BTF technique and application
  • Beam-based alignment
  • ORM
  • AC dipole optics
  • Orbit feedback

20
APEX Spin-offs my wish list for
Run-7(discussion?priorities)
  • Linear optics corrections
  • Resonance corrections
  • Schottky
  • Demonstration of IBS lattice
  • AC dipole ?non expert system
  • BBQ ? less expert system

APEX Spin-offs publications
List of all papers, conference proceedings,invited
talks generated by APEX DEADLINE NOVEMBER 30
21
Prep for Run-7
  • Deadline APEX Pubs November 30
  • Deadline APEX Proposals December 15
  • AEAC end December
  • (the latter 2 contingent on beginning of the run)

22
(No Transcript)
23
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com