Closing of ring 4 AEP has to move POP in Huntington WVA, AEP alleges POP will be ... Pankaj Shah - GNC. Paul Schopis - AOAC and NTAC. Quilt has become 501c3. ... – PowerPoint PPT presentation

Number of Views:116
Avg rating:3.0/5.0
Slides: 10
Provided by: steveni
Category:

less

Transcript and Presenter's Notes

Title: OARtech OSCnet Technical Update


1
OARtechOSCnet Technical Update
  • Paul Schopis
  • OSC Networking
  • April 9, 2008

2
Backbone Update
  • Closing of ring 4 AEP has to move POP in
    Huntington WVA, AEP alleges POP will be ready on
    May 15
  • The Broadband Ohio project is proceeding
  • 5 new Juniper M320 Routers
  • 16 Cisco 7600 (Primarily used by OIT)
  • Rings 1,2 and 3 will be 10 Gig capacity

3
Backbone Update
  • Current Gateways are running at 61 Average 80
    median
  • Total utilization is peaking 5 Gbps
  • Getting additional bandwidth from Level3
  • Additional Bandwidth needed for full protection
  • Looking at re-aggregating as BGP management is
    becoming troublesome

4
Backbone Update
  • Newnet peering connection now _at_ 2.2 Gbps
    frequently
  • Additional increases will require additional
    bandwidth
  • Goal - Two 10 Gig circuits to replace current
    gateways
  • Almost in reach fiscally

5
Partners
  • Leveraging portals with state
  • Current Phase 0 implementation has State
    connecting to OSCnet routers but at layer 2 only,
    VLAN and MPLS back haul on going
  • Phase 1 Project plan being completed
  • Role out will start this summer

6
New Directions
  • Merit interconnect update - Fiber is complete
    circuit has been turned up.
  • Will start in production service after testing is
    complete
  • Anticipate becoming operational within 2 weeks
  • Will share port with NewNet

7
New Directions
  • Pittsburgh connection gear is here
  • Youngstown side done
  • 15454 installed in Pittsburgh
  • PSC POP move is almost complete
  • Fiber move issue seems to be resolved

8
I2 and NLR update
  • Pankaj Shah - GNC
  • Paul Schopis - AOAC and NTAC
  • Quilt has become 501c3. Paul elected to Executive
    Committee and Vice Chair

9
Questions?
Write a Comment
User Comments (0)
About PowerShow.com