Conner Center Pond 1 Retrofit Project

Description:

Water is retained to allow sediment and pollutants to settle out ... Large amounts of rock were blasted to make the pond deeper. Blooms Quarry was not far from here ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 13
Provided by: kmo3
Category:

less

Transcript and Presenter's Notes

Title: Conner Center Pond 1 Retrofit Project


1
Conner Center Pond 1 Retrofit Project
2
Conner Center Pond 1 Retrofit Project
  • Enlarged Capacity
  • Deeper
  • Dam is higher
  • Increased Stormwater Treatment
  • Water is retained to allow sediment and
    pollutants to settle out
  • Water that leaves the facility leaves more slowly
    and is less polluted
  • Part of Chesapeake Bay Recovery Efforts
  • Part of Park Center Development Project

3
Previous Conditions
  • Existing pond floor conditions
  • Flow was restricted by brush and overgrowth
  • Capacity was inadequate for Park Center
    Development
  • Water leaving the pond was not being treated to
    standards

4
Previous Conditions
  • Existing outlet through the dam
  • Pipe in poor condition
  • Minimal flow control

5
During Construction
  • Removal of brush
  • Venture Ct is in the distance

6
During Construction
  • Rock Excavation
  • Large amounts of rock were blasted to make the
    pond deeper
  • Blooms Quarry was not far from here

7
During Construction
  • Pipe Installation
  • New larger pipes were installed
  • New manholes and riser were installed

8
Completion of Construction
  • February 2008
  • Dam has been completed to a higher elevation
  • Fence is being installed
  • Grass is starting to take hold

9
One Month Later
  • March 2008
  • Grass is showing excellent growth
  • Starting to see natural flow of ground water
  • It is not uncommon to have to reseed the pond
    bottom in the first year

10
Pond Is Stabilizing Well
  • April 2008
  • Grass is growing very well
  • Some reseeding will be done by contractor in
    sparse areas
  • Note how much deeper the facility is than before
    construction

11
Pond Is Stabilizing Well
  • April 2008
  • Some new residents have set up housekeeping in
    the pond
  • Again, it is not unusual for the pond bottom to
    take longer to establish
  • A grass seed mix with grasses that can stand
    being wet can be seeded in the wet areas now that
    we know what the water seepage pattern is like.

12
Pond Is Stabilizing Well
  • Contact
  • Department of Public Works at (703) 335-8686 for
    more information concerning the Conner Center
    Pond 1
  • Retrofit Project