CENTRE RISK ASSESSMENT 2000809 - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

CENTRE RISK ASSESSMENT 2000809

Description:

CRA measures a centre's identification and control of known risks ... Risk Assessors draw a big picture: Don't get bogged down in detail ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 10
Provided by: simo46
Category:

less

Transcript and Presenter's Notes

Title: CENTRE RISK ASSESSMENT 2000809


1
CENTRE RISK ASSESSMENT 20008-09
  • NQF BTEC Levels 2 3
  • (including Short Courses at Levels 1-3)

2
CRA 2008-09
  • Ensures approval obligations continue to be met
  • Drives up quality of provision of BTEC programmes
  • CRA measures a centres identification and
    control of known risks
  • CRA confirms centre quality management against
    defined risk assessment criteria
  • CRA
  • Will involve ALL live BTEC centres
  • 700 visit assessments
  • All other centres will undertake self assessment

3
The CRA Report
  • 15 identified risk areas
  • Grouped into three Assessment Sections
  • Managing Assessment Risks
  • Managing Learning Risks
  • Managing Resource Risks
  • Each section is characterised by a specific risk
    type
  • Identified risks are managed by appropriate Risk
    Controls
  • These provide the basis for judging centre
    quality systems
  • Plan Centre Development (PCD) monitored actions
    and recommendations

4
Risk Controls
  • Risk Controls standardisation tool to aid
    consistent judgements
  • Risk Controls are general, standardised
    statements which set out ways to manage
    identified risk
  • Risk Controls are applied to centre systems in
    order to make judgements
  • Risk Controls are prescriptive
  • Risk Controls requirements apply to each Risk
    Area

5
Risk Controls
  • Enables effective assessment against each Risk
    Area
  • Centre only meets Risk Controls for each Risk
    Area if Risk Control is adequate
  • (1) Exists (2) Enforced (3) Effective
  • Adequacy of controls judged on a three point
    scale
  • Only if all controls in place will no action be
    required
  • Actions are mandatory and assure BTEC centre
    systems
  • Recommendations are advisory and help provide
    centre support

6
Visit Assessment
  • Centres selected for a visit will be informed
    Summer 2008
  • Risk Assessor will make contact by end September
    2008 to confirm
  • Visit date
  • What is assessed
  • Documentation required
  • CRA visit window 01/11/2008 28/02/2009

7
Visit Assessment
  • Risk Assessors view centre systems and programme
    team practice
  • Risk Assessors draw a big picture Dont get
    bogged down in detail
  • Risk Assessors make judgements on evidence and
    what seen on visit, but
  • Advocate good practice encourage centre
    development

8
Visit Assessment
  • Focus one day assessment visit some variation
  • Assessment of centre systems and two Programme
    Area Titles (PATs)
  • PATs to be assessed identified by Edexcel
  • CRA report will be available on Edexcel Online
    automated email alerts Quality Nominee when
    report is submitted
  • Centre undertakes actions and recommendations in
    PCD
  • Managing Assessment Risk actions monitored within
    three months
  • All other actions monitored at next CRA

9
Introduction of Self Assessment 2008-09
  • Self Assessment introduced to lessen bureaucracy
  • Variable pattern of visit and SA for centres over
    time
  • Operates on same Risks and Controls as visit
    assessments
  • Programme areas selected by centre
  • Quality Nominee carries out risk assessment and
    completes report online
  • Action plans are monitored as required
  • Edexcel Quality Manager may provide support as
    required
  • CRA self assessment window 01/11/2008
    28/02/2009
Write a Comment
User Comments (0)
About PowerShow.com