Graffiti removal is our No.1 concern. ... 1.8 The district has a graffiti and vandalism abatement plan. The district should have a written graffiti and abatement ... – PowerPoint PPT presentation

Number of Views:131
Avg rating:3.0/5.0
Slides: 15
Provided by: juli4
Category:

less

Transcript and Presenter's Notes

Title: FCMAT UPDATE Facilities Management


1
FCMAT UPDATE Facilities Management
  • March 9, 2005

2
Overall Improvement
  • Review Score
  • Sept 2003 2
  • March 2004 3
  • Sept 2004 4
  • Jan 2005 self rating 6

3
AccomplishmentsBuildings Grounds
  • Staff continues to improve outside lighting by
    replacing and adding lighting to our campuses.
    Improvements have been completed at the following
    campuses
  • Castlemont breezeways
  • Adult Ed (Social Justice) exterior lighting
  • M.L.King parking lot and breezeway lighting
  • Hoover perimeter lighting
  • Elmhurst courtyard lighting
  • Graffiti removal is our No.1 concern. Seven
    painters are dedicated to daily removal
    throughout the districts campuses. Facilities
    is working with the All City Student Council
    and campus based student groups to help with
    preventive measures. The Board has adopted
    Administrative Regulation AR 3515 Campus Security
    and Board Policy BP 5131.5 Vandalism, Theft and
    Graffiti. Board policy allows for restitution of
    damages to be collected from a student or parent
    up to the limits allowable by Ed Code.
  • All campuses have been evaluated for structural
    deficiencies as part of the Facilities Master
    Plan. Repairs are being prioritized by type of
    repair and severity. Senate Bill 550 requires all
    facilities to be inspected each year and findings
    summarized on the districts (SARC) School
    Accountability Report Card each year. Senate
    Bill 6 establishes guidelines for annual
    inspections of all school facilities.

4
Accomplishments (cont)
  • Safety meetings are held monthly, licenses and
    certification are maintain current through
    internal and external training, e.g. IIPP, AHERA,
    chemical usages, UST operator.
  • The current master plan will be used to guide us
    in the development of our five (5) year
    maintenance plan.
  • Deferred Maintenance plan is current and projects
    are managed accordingly.
  • For Fiscal year 2005-2006 utility costs are to be
    incorporated into the Buildings and Grounds
    Budget. Facilities is recommending the hiring of
    a utility manager and or the hiring of SPURR to
    track utility usage for trends, billing errors
    and training of school staff on energy
    conservation.
  • All operations are held accountable for
    purchasing and allocating tools and supplies used
    and maintain our facilities. Purchasing records
    are kept for all materials and coded to each site
    accordingly. Labor hours are charged to each
    site through our work order system. Current work
    order system tracks labor and material costs
    associated with each repair.
  • Evaluations are conducted annually in accordance
    with Board Policy 4200 and collective bargaining
    agreement.
  • A Grounds schedule has been developed implemented
    and communicated to site staff to assure each
    site receives service on a regular basis.

5
Accomplishment (cont)
  • All work orders are assigned by priority in
    accordance with approved guidelines.
  • Priority level 1, Emergencies repaired within 48
    hours
  • Priority level 2, Health and Safety within 1-10
    business days
  • Priority level 3, General repairs non safety
    related 10-60 days
  • Priority level 4, Improvement requests, scheduled
    on a case by case basis as agreed with site

6
Accomplishments Facilities Department
  • The original scope of the Facilities Master Plan
    update is in final draft form and currently being
    reviewed before presenting to the Board. This
    first phase of the update includes the following
    major components
  • Facilities survey condition and site analysis and
    interpretation for all school sites
  • Surveys include sites visits and gathering of
    assessment information form all school sites via
    an extensive questionnaire.
  • Updated site diagrams for all district sites
  • Review and analysis of facilities feasibility of
    implementing multiple small schools on 34 school
    sites
  • In order to more thoroughly address FCMAT
    standards and department goals the master
    planning scope of services was expanded. This
    phase II scope thats underway includes the
    following key components
  • A team of civil, mechanical, plumbing, electrical
    engineers and a roofing consultant are in the
    process of visiting all school sites to determine
    the status of each sites infrastructure and make
    recommendations concerning future needs

7
Accomplishments (cont)
  • Recommendations will include life cycle analyses
    of building systems including present and future
    cost estimates for completing the recommended
    repairs and replacements over a five year period.
  • Finally, a matrix is being developed that will
    capture all site facilities needs district wide
    and allow for the prioritization of future
    repairs and improvements based on agreed upon
    priorities.
  • The district established a Facilities Utilization
    Committee which applies district school loading
    standards to all sites and identifies excess
    space on an annual basis. All requests for space
    from inside departments are routed through this
    committee which makes recommendations to the
    Board/State Administrator concerning the
    utilization of excess space throughout the
    district.
  • The Facilities Utilization Committee works in
    conjunction with the larger Site Intervention
    Team. This team handles all programs including
    but not limited to, Small Schools, Internal and
    External Charters, and No Child Left Behind
    interventions.
  • Annual capital improvement budgets are developed
    on a project by project basis which link cash
    balances to budgets. Each year the budget
    includes a cash flow of revenue and expenditure
    for a three year period.
  • Facilities Advisory Committee meetings were
    reestablished in September 2004 and are scheduled
    on a regular basis.

8
AccomplishmentsCustodial Services
  • Expansion of the Team Cleaning Pilot Program. We
    have grown past the original four school sites of
    Markham, Maxwell Park, Whittier and Parker. Our
    expansion includes the Castlemont
  • Community of Schools, as well as, a second
    roving team that serves the students and staff at
    Cole Middle, M. L. King and Washington.
  •  
  • Distribution of new cleaning equipment with
    necessary training component to insure maximum
    efficiency.
  •  
  • Research of fair market and district cost
    regarding community of district facilities under
    the Civic Center Act.
  •  
  • Custodial staff will be evaluated by site
    administrators with assistance from Custodial
  • Services Field Supervisors and/or Director.
  •  
  • Increased site inspection and documentation by
    Field Supervisors. Supervisors are reviewing
  • inspection information with site administrators
    and custodial personnel. Site administrators
  • signatures are required on inspection forms.
  • Raised expectation and performance by custodial
    staff regarding restroom inspections
  • and cleanliness. Site custodians are submitting
    restrooms forms weekly. Custodians eligible for
    modified duty have been assisting with restroom
    monitoring at the high school level.
  •  

9
FCMAT Standards Update, January 2005
  • Jan Sept March Sept Jan
  • Standard to be addressed 2000 2003 2004 2004 2
    005
  • Rating Rating Rating Rating Rating
  • 1.7 Outside lighting is properly placed and
    monitored
  • on a regular basis to ensure the
    operability/adequacy
  • of such lighting to ensure safety while
    activities are
  • in progress in the evening hours. Outside
    lighting
  • should provide sufficient illumination to allow
    for 0 2 3 4 6
  • the safe passage of students and the public
    during
  • after-hours activities. Lighting should also
    provide
  • security personnel with sufficient illumination
    to
  • observe any illegal activities on campus.
  • 1.8 The district has a graffiti and vandalism
    abatement plan.
  • The district should have a written graffiti and
    abatement
  • plan that is followed by all district employees.
    The district 3 1 1 1 3
  • provides district employees with sufficient
    resources to meet
  • the requirements of the abatement plan.

10
  • Jan Sept March Sept Jan
  • Standard to be addressed 2000 2003 2004 2004 2
    005
  • Rating Rating Rating Rating Rating
  • 1.14 Sanitary, neat and clean conditions of the
    school premises
  • exist and the premises are free from conditions
    that would 1 1 4 5 7
  • create a fire hazard. CCR Title 5 633
  • 1.16 Appropriate fire extinguishers exist in each
    building and
  • current inspection information is available.
    5 4 4 4 5
  • CCR Title 8 1922(a)
  • 1.24 The district conducts periodic safety
    training for employees.
  • District employees should receive periodic
    training on the 2 3 3 5 6
  • safety procedures of the district.
  • 2.1 The district should have a long-range school
    facilities master plan. 4 2 3 4 6

11
  • Jan Sept March Sept Jan
  • Standard to be addressed 2000 2003 2004 2004 2
    005
  • Rating Rating Rating Rating Rating
  • 2.17 The district has established and utilizes an
    organized
  • methodology of prioritizing and scheduling
    projects. New 1 3 3 5
  • (Added since the 2000 report.)
  • 2.18 The district should distribute facility
    funding in an
  • equitable manner to all communities served and
    to all New 1 3 3 5
  • school levels. (Added since the 2000 report.)
  • 3.10 The district maintains a plan for the
    maintenance and 1 1 3 4 6
  • modernization of its facilities. EC 17366
  • 3.12 The district actively manages the deferred
    maintenance
  • projects. The district should review the
    five-year deferred
  • maintenance plan annually to remove any
    completed projects 1 1 5 6 7
  • and include any newly eligible projects. The
    district should

12
  • Jan Sept March Sept Jan
  • Standard to be addressed 2000 2003 2004 2004 2
    005
  • Rating Rating Rating Rating Rating
  • 8.3 The district should create and maintain a
    system to
  • track utility costs and consumption and to
    report on New 0 2 2 3
  • the success of the districts energy program.
  • (Added since the 2000 report.)
  • 8.5 Adequate maintenance records and reports are
    kept,
  • including a complete inventory of supplies,
    materials,
  • tools and equipment. All employees required to
    perform
  • maintenance on school sites should be provided
    with 2 1 3 4 5
  • adequate supplies, equipment and training to
    perform
  • maintenance tasks in a timely and professional
    manner.
  • Included in the training is how to inventory
    supplies and
  • equipment and when to order or replenish them.
  • 8.6a Procedures are in place for evaluating the
    work quality of

13
  • Jan Sept March Sept Jan
  • Standard to be addressed 2000 2003 2004 2004 2
    005
  • Rating Rating Rating Rating Rating
  • 8.6b Procedures are in place for evaluating the
    work
  • quality of maintenance and operations staff. The
  • quality of the work performed by the
    maintenance and 2 0 3 3 5
  • operations staff should be evaluated on a
    regular basis
  • using a board-adopted procedure that delineates
    the areas
  • of evaluation and the types of work to be
    evaluated.
  • 8.8 The district has an effective preventive
    maintenance program.
  • The district should have a written preventive
    maintenance
  • program that is scheduled and followed by the
    maintenance 1 1 1 1 2
  • staff. This program should include verification
    of the
  • completion of work by the supervisor of the
    maintenance staff.
  • 8.9/ Toilet facilities are adequate and
    maintained. All buildings
  • 8.10 and grounds are maintained.CCR Title 5
    631 1 1 2 4 6

14
  • Jan Sept March Sept Jan
  • Standard to be addressed 2000 2003 2004 2004 2
    005
  • Rating Rating Rating Rating Rating
  • 8.12 The district has a documented process for
    assigning
  • routine repair work orders on a priority
    basis. New 1 4 5 6
  • (Added since the 2000 report.)
  • 9.6 The district has developed and maintains a
    plan to ensure
  • equality and equity of its facilities throughout
    the district. 1 2 3 3
    5
  • EC 35294
  • 10.2 Education Code Section 38130 establishes
    terms and
  • condition of school facility use by community
    organizations,
  • in the process requiring establishment of both
    direct cost 5 3 3 3 6
  • and fair market rental rates, specifying what
    groups have
  • which priorities and fee schedules.
  • 11.3 The district should provide clear and
    comprehensive 0 2 3 5 7
  • communication to staff of its standards and
    plans.