Module B - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Module B

Description:

A mathematical technique designed to help operations managers plan and make ... You wish to produce two products (1) Walkman AM/FM/Cassette and (2) Watch-TV ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 8
Provided by: LSte7
Category:
Tags: cassette | module

less

Transcript and Presenter's Notes

Title: Module B


1
Module B
  • Linear Programming

2
What is Linear Programming?
  • Mathematical technique
  • Not computer programming
  • Allocates scarce resources to achieve an
    objective
  • Pioneered by George Dantzig in World War II
  • Developed workable solution in 1947
  • Called Simplex Method

3
Definition
  • A mathematical technique designed to help
    operations managers plan and make decisions
    necessary to allocate resources.

4
Requirements of a Linear Programming Problem
  • Must seek to maximize or minimize some quantity
    (the objective function)
  • Presence of restrictions or constraints - limits
    ability to achieve objective
  • Must be alternative courses of action from which
    to choose
  • Objectives and constraints must be expressible as
    linear equations or inequalities

5
Shader Electronics Example
  • You wish to produce two products (1) Walkman
    AM/FM/Cassette and (2) Watch-TV
  • Walkman takes 4 hours of electronic work and 2
    hours assembly
  • Watch-TV takes 3 hours electronic work and 1 hour
    assembly
  • There are 240 hours of electronic work time and
    100 hours of assembly time available
  • Profit on a Walkman is 7 profit on a Watch-TV
    5

6
Setting up the problem
  • Let
  • X1 number of Walkmans
  • X2 number of Watch-TVs
  • Then
  • 4X1 3X2 ? 240 electronics constraint
  • 2 X1 1X2 ? 100 assembly constraint
  • 7X1 5X2 profit maximize profit

7
What is our objective function?
  • To maximize profit!
  • So we want to maximize profits achieved from our
    2 products with limited resources.
  • Maximize 7x1 5x2
  • But we have constraints
  • 4x1 3x2 ? 240 (Hours of Electronic Time)
  • 2x1 1x2 ? 100 (Hours of Assembly Time)