CALICE Tail-Catcher/Muon Tracker
  • Vishnu V. Zutshi
  • for
  • NIU/NICADD


2
Goals for the TC/Muon System
  • Provide a reasonable snapshot of the tail-end of
    the shower for simulation validation
  • Prototype detector with high-fidelity to what is
    imagined for a generic LCD
  • correcting for leakage
  • understanding the impact of coil
  • muon reconstruction eflow
  • fake rate

3
Erec/Egen 50 GeV p?
4
Tail-catching
5
Multiple Scattering
6
50 GeV p
7
HCal Table
8
HCal TCMT
9
lt90gt Containment
10
Different Hadronic Generators
Intra-nuclear cascade generators need to be
included
11
Rotations
12
(No Transcript)
13
(No Transcript)
14
Design Elements
  • Fine section (8 layers)
  • 2cm thick steel
  • Coarse section (8 layers)
  • 10cm thick steel
  • 5mm thick, 5cm wide strips
  • Tyvek/VM2000 wrapping
  • Alternating x-y orientation
  • Si-PM photo detection
  • Common readout with HCal

15
Fermi-NICADD Extruder
16
Die
17
Separation Grooves
Provides better rigidity
3
1
2
4
5
Epoxy/paint mixture
18
Strips
19
X-talk
20
Glue?
21
Grooving
22
Response
23
Uniformity (small holes)
24
Longitudinal Scan
25
Cassette I
1mm thick steel walls
26
Cassette II
27
Cassette III
28
Absorber and Cart
for their support
Our thanks to
  • Good quality steel plates from Fermi scrap
    available (0.75 and 4 inches thick).
  • Maximum size for the thicker plates is 1.066m x
    1.2m.
  • Cart being designed with about 10 tonne load
    capacity.
  • Will have the capability for forward-backward and
    left-right motion.

29
Quality Control I
  • Hole Tolerance
  • Width and thickness measurements
  • Dopant presence
  • Attenuation length measurements
  • Longitudinal and horizontal scans

30
Quality Control II
31
Quality Control III
32
Summary
  • Strip-fiber RD essentially done, we are entering
    construction phase.
  • All the scintillator required for the device has
    been produced.
  • Assembly of the prototype cassette starts next
    week.
  • Aim to have the first layer readout with the test
    beam electronics in Dec.
Write a Comment